Home > NRC Library > ADAMS Public Documents
Partial response to FOIA request.App D documents available in PDR.Search continuing.
Accession Number: ML082840462
Date Released: Thursday, October 24, 2024
Package Contents
The following links on this page are to Adobe Portable Document Format (PDF) files. To obtain a free viewer for displaying this format, see our Plugins, Viewers, and Other Tools.
- ML082840460 - Submits status of full power licenses,per H Denton 850322 & 0425 memos.Div reviews for both facilities complete. Procedures & Sys Review Branch awaiting confirmatory info re Watts Bar 1 initial test program. (1 page(s), 6/4/1985)
- ML082840485 - Partial response to FOIA request.App D documents available in PDR.Search continuing. (18 page(s), 9/23/1986)
- ML20197J561 - Forwards Core Performance Branch SSER input re Section 4.4, "Thermal-Hydraulic Design," closing issue of fuel rod bowing penalty on DNBR,in response to C Schulten 850422 request. (3 page(s), 5/1/1985)
- ML20197J565 - Forwards printout from detailed licensing action data base created to eliminate discrepancies re open TMI action items. Printout should be reviewed & corrections given to R Scholl within 2 wks. (3 page(s), 5/6/1985)
- ML20197J706 - Requests issuance of encl SSER 31 presenting evaluation on variety of issues in support of encl board notification. Required publications release form also encl for signature. Rept based on input provided by review branches.W/o encls. (4 page(s), 5/2/1985)
- ML20197J711 - Submits daily highlight.On 850507,Unit 1 reached 100% power & declared commercial & first element of fuel loaded into Unit 2. (1 page(s), 5/7/1985)
- ML20197J756 - Forwards comments on util "Long-Term Seismic Program Plan, Jan 1985." Plan generally acceptable.Comments & util responses will occupy agenda of 850522-23 proposed meeting in Bethesda,MD. (15 page(s), 5/9/1985)
- ML20197J770 - Forwards safety evaluation & SALP input supporting 850424 application for amend to License DPR-80 re radiological effluent Tech Specs.Proposed changes acceptable. (3 page(s), 5/15/1985)
- ML20197J799 - Forwards recent clarification of Northern California Power Agency petition for enforcement of plant antitrust license conditions.Draft ltr for closing out six counts encl for signature.W/o encl draft. (1 page(s), 5/24/1985)
- ML20197J806 - Clarifies list of allegations contained in Northern California Power Agency 811204 petition re enforcement of facility antitrust license conditions.Counts 1,3 & 4 only counts pressing.NRC considering License Condition 2.H. (2 page(s), 5/29/1985)
- ML20197J811 - Summary of 850515 meeting w/util & Westinghouse re combined Unit 1 & Unit 2 Tech Specs & necessary Sholly notices for issuance of Unit 2 full power license & for amend of Unit 1 full power license.List of attendees encl. (2 page(s), 5/30/1985)
- ML20197J816 - Submits plan of action to facilitate review of responses to encl Generic Ltrs 85-09 & 85-10.C-E designed reactors unaffected by Generic Ltr 83-28,Item 4.3 since trip sys has shunt trip. (2 page(s), 5/20/1985)
- ML20197J819 - Submits daily highlight.On 850515,fuel loading completed for Unit 2.Unit 2 expected to go critical on 850707 & will be ready for power ascension by 850717.Three separate reactor trips experienced by Unit 1 since 850518. (1 page(s), 5/21/1985)
- ML20197J838 - Discusses review of Unit 2 applicability code assignment of Unit 1 allegations on piping & supports as listed in Table 5.6-1,Page E-6 of SSER 26.All allegations,except allegations listed,fall in Category D. (1 page(s), 6/5/1985)
- ML20197J874 - Submits licensing status for Diablo Canyon Unit 2 & Fermi Unit 2 full power licenses & River Bend Unit 1 low power license in response to H Denton 850607 memo.Issuance of all licenses recommended. (2 page(s), 6/17/1985)
- ML20197J887 - Forwards safety evaluation re 850520 proposed Tech Specs revs based on WCAP-10271, "Evaluation of Surveillance Frequencies & Out-of-Svc Times for Reactor Protection Instrumentation Sys." Tech Specs acceptable. (1 page(s), 6/21/1985)
- ML20197J893 - Safety evaluation re 850520 proposed Tech Specs based on WCAP-10271, "Evaluation of Surveillance Frequencies & Out-of-Svc Times for Reactor Protection Instrumentation Sys." Tech Specs acceptable. (4 page(s), 6/21/1985)
- ML20197J911 - Forwards new license condition format & listing of revs to approved security,contingency & guard training & qualification plans.License condition supersedes condition sent 841219.SER & SALP transmitted in 841219 submittal. (4 page(s), 6/18/1985)
- ML20197J919 - Documents Operating Reactors Assessment Branch review of operating experience for facility during low power license period.Operating experience appears to be more favorable than that at other recently licensed plants. (2 page(s), 6/24/1985)
- ML20197J925 - Forwards final draft Tech Specs for Units 1 & 2 for transmittal to util for review & certification as consistent w/FSAR,SER & Unit 2 as-built plant.Summary of correspondence re Tech Spec changes also encl.W/o encl. (5 page(s), 6/28/1985)
- ML20197J935 - Lists revs & additions to allegation tracking sys,including Allegation 100 & Allegations 1642-1648.Addl updates will be provided when available. (2 page(s), 6/19/1985)
- ML20197J939 - Requests F Coffman audit mods to facility re potential for seismically induced sys interaction between in-core flux mapping sys & seal table on 850709,per IE Info Notice 85-45. Util will have calculation/design packages available. (1 page(s), 7/1/1985)
- ML20197J943 - Lists guidelines for negotiation of schedules for Westinghouse Owners Group responses to Generic Ltr 85-12. (1 page(s), 7/1/1985)
- ML20197J949 - Advises that listed codes assigned to six allegations per GW Knighton 841130 memo,in response to M Ley request. (1 page(s), 7/3/1985)
- ML20197J973 - Forwards evaluation of util proposed plan for long-term seismic program.Plan will be approved after consideration of comments resulting from 850710 meeting w/util & ACRS 850711 meeting. (9 page(s), 7/2/1985)
- ML20197J987 - Forwards NRC & util responses re suitability of performing PRA at Level 1 rather than Level 2,per 850411 request. (3 page(s), 7/2/1985)
- ML20197J997 - Submits daily highlight.Brush fire near San Luis Obispo,CA approx 10 miles from facility.Parts of city evacuated.On 850704,transmission via Midway line to east temporarily switched to Gates line to north.Unit 1 at 100% power. (1 page(s), 7/9/1985)
- ML20197K013 - Informs that licensee should be instructed to comply w/ASME Code Section XI & Paragraph IWV-3427 for all Category A & A/C valves in inservice testing program.No conflict between Tech Specs & program noted. (2 page(s), 7/11/1985)
- ML20197K022 - Forwards SSER input addressing offsite medical svcs.Rept completes emergency planning review for plant licensing.No outstanding issues remain. (3 page(s), 7/15/1985)
- ML20197K029 - Recommends that restriction re parking location of polar crane to preclude jet impingement be included in Tech Specs. Tech Specs should not be written for turbine bldg bridge cranes unless spacing limits become permanent. (1 page(s), 7/16/1985)
- ML20197K052 - Trip rept of 850709 site visit to review specific seismically induced sys interaction postulated between in-core flux mapping sys & seal table. (3 page(s), 7/22/1985)
- ML20197K055 - Forwards revised license condition re implementation of physical security,guard training & qualification & safeguards contingency plans.Rev supersedes 850618 license condition. (2 page(s), 7/25/1985)
- ML20197K065 - Forwards "In-Progress Audit Rept of DCRDR for Diablo Canyon Plant,Units 1 & 2." Rept provides basis for evaluation of DCRDR.DCRDR does not satisfy requirements.Meeting should be held to discuss DCRDR process. (3 page(s), 7/24/1985)
- ML20197K070 - Submits daily highlight.On 850715,Region V received five documents from GAP containing further allegations,based on Ofc of Investigation investigations. (1 page(s), 7/22/1985)
- ML20197K112 - Forwards marked-up Tech Spec Table 3.4-1, "RCS Pressure Isolation Valves," listing addl valves in Items 6,7 & 8 not yet in draft Tech Specs.All valves must be leak rate tested per CRGR 850724 instructions. (2 page(s), 7/30/1985)
- ML20197K126 - Notifies of Commission 850801 briefing to discuss full power authorization for facility.Briefing package sent to Commission & background supplemental info encl.W/o encls. (1 page(s), 7/30/1985)
- ML20197K130 - Provides updated info to be entered into allegation tracking sys. (1 page(s), 7/23/1985)
- ML20197K136 - Forward SSER 32 re full power decision for review.Comments & concurrence requested by 850731.Commission meeting scheduled on 850801.W/o encl. (3 page(s), 7/24/1985)
- ML20197K144 - Advises that NRR final decision re GAP 10CFR2.206 petitions cannot be issued at present due to incomplete reviews & investigations of allegations.Allegations provided by GAP to Region V on 850715 have no impact on final decision. (1 page(s), 7/26/1985)
- ML20197K147 - Provides guidance re acceptance criteria for review of implementation questions in generic ltrs & schedules.Final resolution of Multi-Plant Action G-1 re post-LOCA reactor coolant pump trip discussed. (14 page(s), 7/30/1985)
- ML20197K155 - Informs that pressure isolation valve leakage rate acceptance criteria outlined in 850214 memo accepted by CRGR.Revised marked-up Tech Specs encl. (5 page(s), 8/9/1985)
- ML20197K164 - Submits daily highlight.On 850813,util described plans to initiate rod withdrawal & boron dilution on 850814.Based on previous schedule,facility should be ready to exceed 5% power around 850824. (1 page(s), 8/13/1985)
- ML20197K170 - Submits daily highlight.Due to delays in precriticality testing,criticality will be achieved early in wk of 850811. (1 page(s), 8/7/1985)
- ML20197K198 - Submits daily highlight.Criticality expected between 850818 & 19.Low power testing program should be completed about 850829.Region V will notify Denton of readiness for full power license 4 days after criticality. (1 page(s), 8/16/1985)
- ML20197K210 - Discusses potential seismic interaction associated w/flux mapping sys in Westinghouse plants.Action will be performed on plant specific basis by individual utils & corrective action initiated where required.Related info encl. (9 page(s), 6/10/1985)
- ML20197K221 - Submits daily highlight.On 850826,full power license issued. Unit went critical on 850819.Completion of low power testing expected during first wk of Sept 1985.Commercial operation scheduled for Dec 1985. (1 page(s), 8/26/1985)
- ML20197K228 - Forwards SSER 32 for final approval to permit issuance. Encl includes comments made by contributors & OELD as of 850730.No comments received in response to 850725 request for div directors concurrence.W/o encl. (1 page(s), 8/8/1985)
- ML20197K243 - Forwards SSER 32 & full power license.SSER 32 includes encl list of license conditions for matters provided or reviewed by recipients.W/o SSER 32 & license. (3 page(s), 9/3/1985)
- ML20198A020 - Submits daily highlight.On 850831,reactor coolant pump failed while in Mode 3 as result of motor winding failure. Cause under investigation.Motor removed offsite for rewinding.Six-wk delay in low power testing expected. (1 page(s), 9/5/1985)
- ML20198A161 - Submits daily highlight.Util submitted rept describing high density spent fuel storage mods by 850919 ltr.New fuel storage racks will be installed in dry spent fuel pool condition to reduce radiation exposure. (2 page(s), 9/23/1985)
- ML20198A192 - Submits daily highlight.Rewinding of failed reactor coolant pump motor completed & motor installed.Full power operation scheduled for mid-Oct & commercial operation for Jan 1986. (1 page(s), 10/4/1985)
- ML20198A211 - Notifies of transfer of Allegations 1686 & 1690 from NRR to Region V for final closure responsibility.Region V input needed.NRR will provide supplemental technical assistance if necessary. (1 page(s), 10/3/1985)
- ML20198A219 - Forwards full power OL Tech Specs.Tech Specs combined for both units can be appended to Unit 1 OL by amend.Util clarifications & changes incorporated in Tech Specs,per 850701 request.W/o encl. (2 page(s), 8/5/1985)
- ML20198A225 - Requests review of util rept re reracking of spent fuel pools for facilities.Input for safety evaluation should be provided by 860331 in accordance w/encl proposed SER outline. (3 page(s), 10/3/1985)
- ML20198A249 - Initial NSHC determination & noticing action re util 850920 application to amend Licenses DPR-80 & DPR-82,allowing performance of first inservice snubber visual insp for Unit 2 following power ascension program.Amend involves NSHC. (1 page(s), 10/11/1985)
- ML20198A254 - Initial NSHC determination & noticing action re util 850906 application to amend Licenses DPR-80 & DPR-82,implementing relaxed axial offset control for Unit 1 after 8,000 MWD/ module test unit burnup.Amend involves NSHC. (2 page(s), 10/11/1985)
- ML20198A262 - Initial NSHC determination & noticing action re util 850827 application for amends to Licenses DPR-80 & DPR-82 re electrical power sys battery sets & associated chargers. (2 page(s), 10/11/1985)
- ML20198A359 - Forwards lists of documents responsive to FOIA Requests 84-741,84-742,84-743 & 84-744.Some documents may ref or include confidential info. (14 page(s), 10/23/1985)
- ML20198C111 - Requests review of schedule of safety evaluations & licensing actions re Generic Ltr 83-28,Items 4.2.3 & 4.2.4, to create consistent,meaningful & achievable schedule for completion of Multi-Plant Action Item B-89 by end of CY86. (2 page(s), 10/30/1985)
- ML20198D828 - Informs of need for addl info to complete review of environ assessment for spent fuel pool expansion.Info concerns fuel pool heat load (Btu/h) for original design to determine percent increase for new design. (1 page(s), 11/5/1985)
- ML20198F423 - Initial NSHC determination & noticing action re util 850827 application for amends to Licenses DPR-80 & DPR-81 re Tech Spec changes to delete refs to reactor coolant pump breaker position trip.Amend involves NSHC. (2 page(s), 11/6/1985)
- ML20198G197 - Requests submittal date for providing info addressing Generic Ltr 83-28,Sections 4.2.3 & 4.2.4 re life testing & replacement.Licensee must respond by 860131 to meet schedule for completing review projects. (1 page(s), 11/7/1985)
- ML20198G219 - Requests that task of reviewing justification for use of energy balance technique to qualify masonry walls be added to Assignment 6 to Contract NRC-03-81-130. (3 page(s), 11/15/1985)
- ML20198G245 - Forwards Mechanical Engineering Branch SER re safety & relief valve testing,per NUREG-0737,Item II.D.1.Info demonstrates ability of RCS PORV,safety valves & piping to function under expected operating conditions. (2 page(s), 11/18/1985)
- ML20198G265 - Advises that util 850827 Tech Spec change request allowing mod of reactor trip circuitry acceptable.Review required no interaction w/applicant,therefore,no SALP input provided. (2 page(s), 11/18/1985)
- ML20198G484 - Submits daily highlight.On 851129,reactor tripped on steam flow/feed flow mismatch coincident w/steam generator low level signal.Caused by opening turbine stop valves in process of latching turbine. (1 page(s), 11/29/1985)
- ML20198G498 - Forwards insp summary of App R compliance audit on 851118-22.Structural steel unprotected in numerous areas within plant.Unresolved issue exists re adequacy of fire dampers. (3 page(s), 12/2/1985)
- ML20198G521 - Forwards summary of review costs incurred by program ofcs involved in processing OL for 840624-1222 & supporting documentation.W/o documentation. (2 page(s), 11/26/1985)
- ML20198G692 - Notifies of transfer of spent fuel pool rerack licensing amend application to Div of PWR Licensing A.SER not due until 860331.Possibility of hearing exists. (1 page(s), 12/12/1985)
- ML20198G746 - Forwards SSER input re clarification of Tech Spec requirements for startup test reporting Section 6.9.Task completed. (2 page(s), 12/20/1985)
- ML20210A882 - Forwards request for addl info re spent fuel pool reracking, to complete radiological review of util 850919,1030 submittals & 851205 meeting w/NRC. (2 page(s), 1/10/1986)
- ML20210A891 - Notice of consideration of issuance of amends to Licenses DPR-80 & DPR-82 & proposed NSHC determination & opportunity for hearing on 851030 request re spent fuel pool storage capacity. (20 page(s), 1/6/1986)
- ML20210A933 - Forwards request for addl info based on review of licensee submittal concerning proposed spent fuel expansion.Expedited response needed to complete review. (4 page(s), 1/15/1986)
- ML20210B174 - Requests response to encl questions re high-density spent fuel rack design & analysis in order to complete review. (4 page(s), 1/23/1986)
- ML20210B180 - Informs that PWR project managers can closeout plant-specific TACs re NRR technical review branches review of util responses to Generic Ltr 85-02.Review conclusions will be issued as Commission paper in mid-Feb. (1 page(s), 1/22/1986)
- ML20210B186 - Describes transfer of review responsibilities for DCRDR per Suppl 1 to NUREG-0737 for listed plants from Div of Human Factors Technology to PWR Licensing-A.Status of each plant summarized. (4 page(s), 1/24/1986)
- ML20210B525 - Discusses utils requests for relief from present schedules of diesel generator testing.Zion Units 1 & 2 still following accelerated testing regime,per 800229 confirmatory order. Diablo Canyon requests for exemptions being processed. (1 page(s), 1/29/1986)
- ML20210C114 - Forwards request for addl info needed to complete evaluation of high-density spent fuel rack design & analysis.Advance copy provided to F Rinaldi for transmittal to licensee. (2 page(s), 2/24/1986)
- ML20210C143 - Responds to 860123 memo.NRR in process of closing out remaining allegations on facility.Evaluations expected to be completed by Mar 1986.Region V evaluations for individual allegations & info to be included in apps requested. (3 page(s), 2/26/1986)
- ML20210C161 - Submits daily highlight.On 860304,exemption granted to allow util to perform necessary peak cladding temp calculations w/approved code & based on actual plant conditions. Calculations will be completed by 860831. (1 page(s), 3/4/1986)
- ML20210C178 - Submits daily highlight.On 860303,exemption granted from 10CFR50.46(a)(1) requirement that plant-specific ECCS cooling performance analysis be performed w/approved code demonstrating peak cladding temp limit within 2,200 F. (1 page(s), 3/3/1986)
- ML20210C264 - Submits daily highlight.Low power testing program completed. Plant reached 100% power on 860312 & generated 1079 MWe.Util declared plant in commercial operation on 860313. (1 page(s), 3/14/1986)
- ML20210E559 - Forwards evaluation supporting licensee request for use of ASME Code Case N-411,subj to listed restrictions. (4 page(s), 3/24/1986)
- ML20215B657 - Safety evaluation re util 850424 application for amend to License DPR-80,changing radiological effluent Tech Specs re radwaste mgt.Proposed changes acceptable. (8 page(s), 5/15/1985)
- ML20215B661 - Forwards comments on mod of Tech Specs re effectiveness of LWR regulatory requirements in limiting risk program,for info & consideration. (10 page(s), 5/20/1985)
- ML20215B666 - Forwards evaluation of WCAP 10054(P), "Westinghouse Small Break ECCS Model Using NOTRUMP Code." Rept acceptable for ref in license applications.W/o encl. (1 page(s), 5/21/1985)
- ML20215B671 - Forwards reformated proposed implementing license condition & listing of documents that comprise approved plans for Unit 2. (4 page(s), 5/24/1985)
- ML20215B688 - Forwards Structural & Geotechnical Engineering Branch SSER input for full power license.Full power license can be issued w/encl required license condition. (15 page(s), 7/1/1985)
- ML20215B758 - Informs that immediate effectiveness rule no longer necessary,in light of Appeal Board 850627 decision upholding adequacy of facility.No further action on matter planned unless otherwise instructed by Commission. (1 page(s), 7/23/1985)
- ML20215B778 - Forwards "Long Term Seismic Program,Program Plan for Reevaluation of Diablo Canyon Power Plant" & util responses to NRC staff comments on program plan. (2 page(s), 10/10/1985)
- ML20215B796 - Requests all analyses & memoranda written subsequent to EDO 850705 memo to Commission, "Consideration of Potential Complicating Effects of Earthquakes on Emergency Planning," by 851018. (1 page(s), 10/17/1985)
- ML20215B801 - Informs that level of effort & proposed schedule discussed in 851016 ltr re Contract NRC-03-81-130,Final Work Assignment 26, "Evaluation of Spent Fuel Racks Structural Analysis," acceptable. (1 page(s), 10/31/1985)
- ML20215B842 - Informs that qualification file for core exit thermocouple junction boxes provides reasonable assurance that junction boxes capable of functioning as required in postulated pressure & temp environ. (1 page(s), 11/12/1985)
- ML20215B846 - Forwards util request for amends to Licenses DPR-80 & DPR-81 re spent fuel pool reracking for info & review.Review schedule & list of reviewers encl.W/o amend request. (4 page(s), 11/13/1985)
- ML20215B851 - Forwards draft rept containing results of review of allegation mgt for facility,for comment.Comments requested within 15 days of memo date. (1 page(s), 11/26/1985)
- ML20215B872 - SER re safety & relief valve testing,per NUREG-0737,Item II.D.1 or Multi-Plant Action F-14.Info demonstrates ability of RCS PORVs,PORV block valves,safety valves & associated piping to function under expected operating conditions. (25 page(s), 11/18/1985)
- ML20215B889 - Forwards changes & transfers of assignments for Reactor Safety Issues Branch personnel,per 851230 memo. (2 page(s), 1/8/1986)
- ML20215B903 - Informs that Allegation 676 will be reviewed by Structural & Geotechnical Engineering Branch,per 860226 meeting. (1 page(s), 3/17/1986)
- ML20215B906 - Forwards draft ltr to util,forwarding name of new member to be added to list of participants scheduled to conduct regulatory effectiveness review from 860519-23. (3 page(s), 3/18/1986)