Home > NRC Library > ADAMS Public Documents
First partial response to FOIA request for documents.Records in App B available in PDR.Records in App A being made available in PDR & encl.
Accession Number: ML082460465
Date Released: Thursday, October 24, 2024
Package Contents
The following links on this page are to Adobe Portable Document Format (PDF) files. To obtain a free viewer for displaying this format, see our Plugins, Viewers, and Other Tools.
- ML082460464 - First partial response to FOIA request for documents.Records in App B available in PDR.Records in App A being made available in PDR & encl. (4 page(s), 2/20/1998)
- ML20203C330 - Forwards outline of final MAP safety evaluation as requested during last MAP meeting. (7 page(s), 2/20/1998)
- ML20203C422 - Summary of 950317 MAP meeting re plant status update,review of insp dates for Unit,improving station performance,Unit 2 Restart Plan & status of MC 0350. (5 page(s), 3/17/1995)
- ML20203C250 - Summary of 940420 MAP meeting at Millstone site re purpose of panel & licensees progress on previous PEP. (2 page(s), 2/20/1998)
- ML20203C648 - Summary of 960619 MOT meeting re licensee response to 10CFR50.54 f ltr for Unit 3 due on 960620 & Unit 3 Readiness for Restart Plan. (2 page(s), 6/19/1996)
- ML20203C744 - Summary of 970205 RAP meeting re insp program for restart of three Millstone units. (2 page(s), 2/5/1997)
- ML082460466 - Summary of 970501 RAP meeting at Millstone re developing restart model for Millstone,involvement of ACRS in final restart decision process & contacting licensee to inform that panel expects discussion of possible delays. (52 page(s), 5/1/1997)
- ML20203B883 - Notification of MAP meeting on 940420 in Waterford, Connecticut.Provides list of tentative activities for day. (2 page(s), 4/13/1994)
- ML20203C715 - Comments on Section C.1 on acceptable preconditioning, Section C.6.c on regulatory refs & ANSI 3.2-1982,section 5.3.10 on content of test & insp procedures. (1 page(s), 1/26/1998)
- ML20203B645 - FOIA request for all documents re NRC Millstone Assessment Panel (MAP) from inception to present time. (1 page(s), 12/1/1997)
- ML20203B803 - Summary of sixth MAP meeting on 921105 in Millstone Resident Inspectors Office re plant status,recent NRC activities, future MAP activities,public meeting on PEP following MAP meeting. (3 page(s), 12/10/1992)
- ML20203C403 - Refers to 950221 NRC meeting w/Millstone officials.Provides comments re Millstone.Advises that Millstone has become very good neighborhood to East Lyme & have been on-going & continuing part of community. (2 page(s), 2/23/1995)
- ML20203B679 - Summary of 920720 meeting w/Millstone Assessment Panel (MAP) re plant status,MAP issues list,content of evaluation rept on PEP,PEP review & agenda for subsequent meeting w/utlity. (3 page(s), 8/27/1992)
- ML20203B730 - Summary of fourth MAP meeting on 920901 in Region I re plant status,schedule for PEP review activities,proposed insp plan for PEP review,proposed ltrs to State & local communities, verification & validation process. (5 page(s), 10/9/1992)
- ML20203C378 - Summary of 950127 telcon re Millstone Unit Restart & NRC need to perform restart assessment team insp before restart of plant. (7 page(s), 1/27/1995)
- ML20203C595 - Summary of 950613 MAP meeting re status of emergency operating procedure update & associated operator performance issues. (3 page(s), 6/13/1995)
- ML20203B718 - Provides outline of tentative plan for reviewing NEUT PEP as requested by MAP. (7 page(s), 8/28/1992)
- ML20203C430 - Summary of 950504 MAP meeting re plant status,current restart planning & scheduling,current status of RATI,status of licensing issues that impact restart,restart meeting details & developing criteria for improving performance. (6 page(s), 5/4/1995)
- ML20203B873 - Provides summary of MAP meeting on 930113 w/NEUT at Millstone site re PEP.Meeting presentation slides encl. (61 page(s), 2/9/1993)
- ML20203B906 - Summary of 941102 MAP meeting held on site re general direction of MAP efforts,NRC actions re recent Unit 2 work standown by NEUT resulting from 4160V switchgear washdown & hydrogen piping events & Unit 2 insp efforts for SMM. (2 page(s), 11/2/1994)
- ML20203B835 - Informs that MAP has scheduled meeting on 930113 w/NEUT at Millstone site to discuss progress on implementing PEP & other performance improvements noted to date & work since Oct 1992 in areas of developing validation criteria. (2 page(s), 12/28/1992)
- ML20203C361 - Summary of 950105 MAP meeting held onsite at Millstone re current plant status,insp initiatives,open item status, enforcement strategy for severity level V violations, allegations,SMM recommendations & future MAP actions. (24 page(s), 1/5/1995)
- ML20203C485 - Summary of 950608-09 MAP meeting re findings of Readiness Assessment Team.Restart issues include electrical tagging error occured during maint of MOV,punch list items,SAT findings & ensuring key people are trained. (6 page(s), 6/8/1995)
- ML20203B778 - Summary of fifth MAP meeting on 921007 in Region I re plant status,PEP Review Team findings to date,remaining PEP Review Team activities,921105 public meeting preparations,Unit 2 S/G replacement outage progress & insp results. (4 page(s), 10/14/1992)
- ML20203C672 - Summary of 961007 MOT meeting re accountability for line items in Restart Assessment Plan.Discussed need for meeting w/NEUT recovery managers to establish course of action & schedules & need to update FSAR before restart. (3 page(s), 10/7/1996)
- ML20203B892 - Summary of 940525 MAP meeting re acceptance of proposed charter,current Unit 2 problems identified w/mispositioned control rod & incorrect emergency action level categorizations. (7 page(s), 5/25/1994)