Home > NRC Library > ADAMS Public Documents
Further response to FOIA requests for documents generated or prepared by V Stello.Apps D & E documents encl & available in PDR.Apps E & F documents partially & completely withheld (ref FOIA Exemptions 2,4,5 & 6).
Accession Number: ML082421065
Date Released: Thursday, October 24, 2024
Package Contents
The following links on this page are to Adobe Portable Document Format (PDF) files. To obtain a free viewer for displaying this format, see our Plugins, Viewers, and Other Tools.
- ML082421063 - Further response to FOIA requests for documents generated or prepared by V Stello.Apps D & E documents encl & available in PDR.Apps E & F documents partially & completely withheld (ref FOIA Exemptions 2,4,5 & 6). (11 page(s), 8/12/1986)
- ML20214K938 - Informs that JW Rose designated to serve as Acting Director for EDO on 860130 & 31. (1 page(s), 1/29/1986)
- ML20214K902 - Forwards resumes of managers & engineers for review.W/o encls. (1 page(s), 2/6/1986)
- ML20197J304 - Discusses addl procedures needed to ensure legally permissable interpretation of NRC regulations,identification of need for new rulemaking & compilation of regulatory history for each major rule,per 841220 request. (5 page(s), 2/15/1985)
- ML20214K910 - Trip rept of Technical Advisory Group 851104-08 meetings for Steam Generator Group Project in Lyon,Chalon,Le Creusot & Cadarache,France.Agenda & list of attendees encl. (9 page(s), 3/27/1986)
- ML20210L564 - Forwards draft GAO rept, "Intl Efforts to Reduce Availability of Nuclear Weapons-Grade U," for info.GAO requested NRC comments by 860424.W/o encl. (1 page(s), 3/25/1986)
- ML20210C258 - Summarizes developments & submits recommendations re evaluation of need for rulemaking to tailor 10CFR50 regulations to specific power levels,increasing Director of NRR flexibility in determining regulatory applications. (4 page(s), 3/3/1986)
- ML20214K949 - Partially withheld memo re 850801 expiration of facility CP. Related info encl. (8 page(s), 1/30/1986)
- ML20214K908 - Partially withheld memo re responses to COMM TR 85-7.Staff comments not adopted in 860123 response. (1 page(s), 2/3/1986)
- ML20214K932 - Partially withheld request for 20-day extension to complete development of thermal hydraulics,power plant maint,aging & decommissioning plans for pilot efforts at technical integration,per Dircks 851125 memo. (1 page(s), 1/30/1986)
- ML082421067 - Forwards TVA 860320 response to 10CFR50,App B requirements. W/o encl.Related info encl. (2 page(s), 3/21/1986)
- ML20214K940 - Forwards vote display on proposals outlined in COMNP-85-17 re Ofc of Investigations & Ofc of Inspector & Auditor referrals to DOJ. (3 page(s), 5/14/1985)
- ML20214K945 - Approves BNL funding for FIN A-3282, "Operational Safety Reliability Research," for completion of draft rept,due by 860430.RES,NRR & IE should submit needs for implementation of reliability assurance by 860630. (2 page(s), 2/26/1986)
- ML20214K957 - Partially withheld memo recommending that debt collection procedures be initiated against two NRR employees for personal long distance telcons on FTS.Employees issued ltrs of reprimand. (3 page(s), 3/4/1986)
- ML20214K905 - Partially withheld results of NRR investigation & evaluation of 10 licensed operators involved in TMI-2 pre-accident RCS leak rate testing irregularities.Ofc of Investigations Rept 1-84-022 will be forwarded. (4 page(s), 4/1/1986)
- ML20214K913 - Partially withheld response to 860121 ltr re NRC personnel moving costs.NRC waiting for Comptroller General decision on waiver of debt. (2 page(s), 2/27/1986)
- ML20214K899 - Partially withheld memo re new procedures for staff interaction w/Commission,Ofc of General Counsel & Ofc of Policy Evaluation. (1 page(s), 2/3/1986)
- ML20214K929 - Submits approved guidelines for referrals to DOJ.Ofc of Investigations & Ofc of Inspector & Auditor will continue to make decisions re referrals. (2 page(s), 8/14/1985)
- ML20214K952 - Informs of EDO request for review of NRC contracting process & recommendations for improvement by 860225.W/o draft memo. Related info encl. (3 page(s), 2/19/1986)
- ML20214K922 - Partially withheld response to 860128 memo re AEOD case study rept, "Therapy Misadministrations Reported to NRC Pursuant to 10CFR35.42." Requests reconsideration of recommendations re QA & beam modifiers. (5 page(s), 4/8/1986)
- ML20214K974 - Forwards quarterly status rept of GAO assignments that involve contact w/NRC as of 860401. (2 page(s), 4/1/1986)
- ML20210J516 - Responds to 860313 ltr re staff actions to investigate allegations listed in 860204 2.206 petition submitted by Schlemmer on behalf of Western Reserve Alliance.Release of info concerning plant safety GAP responsibility. (3 page(s), 3/31/1986)
- ML20214K916 - Partially withheld memo revising Commission tracking rept. Forwards list re tasks that should not be allowed to slip. (8 page(s), 1/29/1986)
- ML20214K959 - Requests extension for completion of design threat decision paper to 860328 due to activities associated w/Kerr-McGee accident.W/o listed staff requirements memo. (1 page(s), 3/14/1986)
- ML20214K911 - Expresses appreciation for 851230 interview re containment objective & requests corrections of encl draft interview rept by 860124.W/o encl. (1 page(s), 1/8/1986)
- ML20214K946 - Partially withheld memo informing of Commission commitment to provide more detailed response to Congressman Dingell concerns re NRC actions leading to TVA shutdown of operating plants in 1985. (1 page(s), 2/6/1986)
- ML20214K969 - Forwards preliminary outline of NRC Human Resources Plan, per Commission 860121 staff requirements memo.Oak Ridge Associated Univs will be used to gather & interpret relevant manpower info. (4 page(s), 3/14/1986)
- ML20214K976 - Partially withheld request for initiation of debt collection procedures for repayment of cost of unofficial calls on FTS, per DC Dambly legal opinion & recommendation. (1 page(s), 3/11/1986)
- ML20197J342 - Discusses proposed changes to Commission regulations to allow Director of NRR to determine if regulation applicable to power level involved.Recommended alternatives requested. (1 page(s), 2/22/1985)
- ML20214K897 - Partially withheld response to SR Connelly 851031 investigative rept re NRC employees FTS abuse.Employees officially reprimanded & required to make restitution. (1 page(s), 3/17/1986)
- ML20214K935 - Forwards staff evaluation of DOE proposal for monitored retrievable storage (NUREG-1168).W/o rept. (1 page(s), 4/9/1986)
- ML20210C000 - Forwards draft Commission paper re rulemaking options for adoption of DOE EIS concerning issuance of const authorization & license for geologic repository.NMSS reviewed & concurs w/paper. (11 page(s), 1/28/1986)
- ML20116P032 - Responds to request for comments on alternative methods for phasing in implementation of regulations,other than by issuance of exemptions from requirements for full power operation,at time of fuel load or low power operations. (2 page(s), 4/24/1985)