Home > NRC Library > ADAMS Public Documents
Comments on near-term OL actions for listed plants in response to 850308 memo.Awaiting addl info on Watts Bar to confirm acceptability of operators.No open issues remain for Diablo Canyon Unit 2.
Accession Number: ML082410749
Date Released: Thursday, October 24, 2024
Package Contents
The following links on this page are to Adobe Portable Document Format (PDF) files. To obtain a free viewer for displaying this format, see our Plugins, Viewers, and Other Tools.
- ML082410748 - Requests that encl "Program Plan on LWR Regulatory Requirements in Limiting Risk" be forwarded to utils by 850125 along w/memo re planned visit to utils to obtain views on regulatory requirements. (26 page(s), 1/10/1985)
- ML082410750 - Provides status of reviews & outstanding issues re near-term licensing activities for listed facilities,per H Denton 850130 memo. (14 page(s), 2/11/1985)
- ML082410775 - Partial response to FOIA request for documents re Diablo Canyon.Records identified on App R forwarded & being made available in PDR. (17 page(s), 4/17/1987)
- ML083230799 - Comments on near-term OL actions for listed plants in response to 850308 memo.Awaiting addl info on Watts Bar to confirm acceptability of operators.No open issues remain for Diablo Canyon Unit 2. (1 page(s), 3/20/1985)
- ML20209A984 - Forwards Matls Engineering Branch safety evaluation suppl approving util 801223 request for relief from inservice insp & testing requirements of 10CFR50. (1 page(s), 3/6/1981)
- ML20209B531 - Informs that Dircks 840104 memo provided Commission w/status of NRC resolution of plant allegations & concerns re design, const & operation of plant. (2 page(s), 1/4/1984)
- ML20209B624 - Forwards listed documents re Allegations 40 & 45 concerning operation of plant,addressed in SSER 21 in response to 840112 request.Listed documents should not be withheld as classified,safeguards or proprietary info.W/o encls. (1 page(s), 1/19/1984)
- ML20209B724 - Staff requirements memo re Commission affirmation/discussion & vote on 840123 in Washington,DC approving order modifying Commission 861108 Order CLI-83-27,authorizing operation under Modes 4 & 3 in addition to Modes 6 & 5. (1 page(s), 1/25/1984)
- ML20209B847 - "App I,SER,Pump & Valve Inservice Testing Program." (77 page(s), 12/12/1984)
- ML20209B894 - Requests addl info re buried electrical conduits,including mechanical properties of conduit,per 841002-05 & 1107-08 design calculation audits.Info requested by 841231. (2 page(s), 12/14/1984)
- ML20209C000 - Informs that Generic Ltr 83-42 re control of heavy loads, pertains to Phase II,Multi-Plant Action C-15 of control of heavy loads near spent fuel although not specifically stated.Status of licensees responses to Phase I requested. (2 page(s), 2/15/1984)
- ML20209C131 - Notification of 840328 meeting in Bethesda,MD to discuss IT Yin concerns over issuance of low power license for plant. (1 page(s), 3/27/1984)
- ML20209C210 - Provides preliminary assessment of recent hypothesis re tectonics of central & southern California,per F Brady & D Hamilton 841206 rept.Seismic licensing condition for Diablo Canyon excellent vehicle for further assessment. (2 page(s), 1/3/1985)
- ML20209C225 - Submits daily highlight.Discusses 840418 issuance of Amend 9 to low power license,840414 order modifying license requiring licensee to verify or perform certain analyses for piping/piping supports & joint intervenors 840418 motion. (2 page(s), 4/19/1984)
- ML20209C292 - Submits daily highlight.On 840506,reactor tripped due to spurious trip signal from one instrumentation channel. Component replaced & tested.On 840508,reactor tripped due to SI resulting from opening of condenser steam dump valve. (1 page(s), 5/9/1984)
- ML20209C320 - Requests that util submit listed addl info re Generic Ltr 83-28,including specific details concerning post-trip review program & description of equipment classsification program for all safety-related components. (3 page(s), 1/8/1985)
- ML20209C516 - Annotated ltr requesting that author be brought up to date on plant for Udall June 14 briefing. (1 page(s), 5/29/1984)
- ML20209C643 - SSER supporting util response to Phase I of NUREG-0612, "Control of Heavy Loads at Nuclear Power Plants" (ref Generic Task A-36).Response to Phase II will be subj to future evaluation. (2 page(s), 7/16/1984)
- ML20209C669 - Forwards "Control of Heavy Loads at Nuclear Power Plants (Phase II),Diablo Canyon Unit 2," draft technical evaluation rept based on applicant response to NUREG-0612 & 801222 generic ltr. (1 page(s), 1/9/1984)
- ML20209C675 - "Control of Heavy Loads at Nuclear Power Plants (Phase II), Diablo Canyon Unit 2," draft technical evaluation rept. (27 page(s), 12/31/1983)
- ML20209C698 - Informs of earthquake on 840123 near Monterey,CA.Util repts earthquake not felt in facility control room & did not trigger std strong motion instruments or supplemental instruments.Tapes will be replayed & results communicated. (1 page(s), 1/24/1984)
- ML20209C705 - Confirms J Lee telcon request for transcript of 840125 meeting in Bethesda,MD to discuss certain allegations re facility. (1 page(s), 1/25/1984)
- ML20209C710 - Requests that listed subjs identified at ACRS 840119 meeting be prepared for presentation at ACRS 840210 full committee meeting.Input on subjs requested by 840208. (3 page(s), 2/6/1984)
- ML20209C715 - Requests attendance to ACRS 840210 meeting re RHR pumps common mode failure,main turbine overspeed protection, electrical cable installation & protection against interaction & operator training & qualifications. (2 page(s), 2/9/1984)
- ML20209C720 - Forwards SSER 23 for concurrence by 840210.W/o encl. (1 page(s), 2/8/1984)
- ML20209C722 - Notification of Commission 840802 meeting to discuss full power license for plant.Attendance required.Summary statement to Commission & final version of rept encl.W/o rept. (5 page(s), 7/30/1984)
- ML20209C836 - Provides input to OL review mgt rept.Div has no open issues for plants to be licensed in next 180 days.Two noted deletions should be made to HR Denton 840213 memo. (1 page(s), 3/22/1984)
- ML20209C847 - Discusses G Bruno 830711 ltr expressing concern w/serious erosion problems along facility transmission line corridor. Complaint should be directed to president of Public Utils Commission of State of CA. (2 page(s), 4/5/1984)
- ML20209C848 - Requests input by 840926 to NRR SALP evaluation on facility for Jan 1983 - June 1984.Lists of activities & criteria for evaluation & format requested for input encl. (5 page(s), 9/20/1984)
- ML20209C876 - Advises of results of review of limited hot operating experience of util licensed operators acquired during initial test program.Loss of offsite power w/simultaneous loss of turbine generator test should be conducted. (1 page(s), 3/23/1984)
- ML20209C881 - Discusses 840329 staff requirements memo which directed staff to conduct special insp of performance of operating crews at facility & effectiveness of integration & use of shift advisors during initial criticality to 5% power. (1 page(s), 4/6/1984)
- ML20209C908 - Forwards Util Advisor Evaluation Team rept on qualification & training of shift advisors & NRC Evaluation Team rept on shift advisor program.Repts recommended as board notification items. (1 page(s), 4/24/1984)
- ML20209C921 - Summary of 830913 meeting w/util in Bethesda,MD re facility. Internal review & QA programs,allegations,design activities & schedules addressed.Meeting notification,list of attendees,viewgraphs & related info encl. (55 page(s), 9/21/1984)
- ML20209C969 - Forwards,for approval,SSER 23.W/o encl. (1 page(s), 5/21/1984)
- ML20209C975 - Requests safety evaluation completing Multi-Plant Action B-66 re natural circulation cooldown by 840630. (1 page(s), 5/30/1984)
- ML20209C981 - Forwards in camera transcript of 840522 meeting in San Francisco,CA.Rept being issued as in camera document to protect confidentiality of individual.W/o encl. (1 page(s), 6/1/1984)
- ML20209C993 - Forwards SSER 23,for concurrence by 840605.W/o encl. (1 page(s), 6/4/1984)
- ML20209D004 - Recommends issuance of 840524 ACRS meeting transcript,per board notification procedures. (1 page(s), 6/18/1984)
- ML20209D012 - Summarizes 840620 earthquake 20 miles west of Santa Maria, CA.Earthquake plotted on encl map & located 22 miles south of facility.Earthquake felt in control room & triggered sensitive secondary strong motion instruments. (3 page(s), 6/22/1984)
- ML20209D018 - Forwards request for addl info re NUREG-0737,Item II.D.1 concerning preformance testing of relief & safety valves at facilities,per EG&G review.Request should be transmitted to applicant for response. (3 page(s), 6/22/1984)
- ML20209D030 - Requests preparation of initial checklist of issues to be addressed prior to licensing decisions by 840626,per 840622 discussion. (1 page(s), 6/25/1984)
- ML20209D038 - Requests FR publication of notices of consideration of issuance of amends to License DPR-76 & proposed NSHC determination & opportunity for hearing re mechanical & hydraulic snubbers & administrative controls. (1 page(s), 6/19/1984)
- ML20209D044 - Notification of 840620 meeting w/util in San Luis Obispo,CA to discuss plant readiness & full power licensing matters. (1 page(s), 6/18/1984)
- ML20209D045 - SSER for Section 5.2.4, "Fracture Toughness," supporting util matl & surveillance programs,per 10CFR50,Apps G & H. (2 page(s), 11/1/1984)
- ML20209D071 - Submits daily highlight.License DPR-80 issued to facility on 841102.Full power operation expected in approx 2 months. (2 page(s), 11/2/1984)
- ML20209D089 - Summarizes 840619 & 22 geological reconnaissance of site vicintiy & 840620 public meeting. (4 page(s), 7/6/1984)
- ML20209D094 - Advises that Item 4.3 of Generic Ltr 83-28 re shunt trip needs separate technical assistance contract (TAC) for Tech Spec changes.Existing TAC for Item 4.3 may be closed out provided Tech Specs only open issue. (1 page(s), 7/3/1984)
- ML20209D114 - Discusses K Manoly assistance in reviewing & resolving allegations re facility pipe supports.K Manoly anticipated availability schedule from 840514-0628 listed. (2 page(s), 5/18/1984)
- ML20209D127 - Forwards draft repts of Diablo Canyon Peer Review Group evaluation for consideration.Piping & supports & programmatic issues will be addressed at 840711 & 13 meetings.Committee views requested.W/o encl. (1 page(s), 7/6/1984)
- ML20209D130 - Summarizes issues discussed at 840620-21 meeting believed to be relevant to operational readiness including safety injection pump room drains,lighting & safety vs plant security. (3 page(s), 7/12/1984)
- ML20209D135 - Forwards revised license condition to reevaluate seismic design basis.Rev based on NRC discussions w/util on 840508 & ACRS on 840524 & 0614. (3 page(s), 7/13/1984)
- ML20209D139 - Forwards update to 840509 memo re full power license matters & schedule.SSERs will be issued re IDVP matters,allegations & piping & supports.Draft SSERs will be completed by 840706 & final SSER by 840713. (5 page(s), 7/3/1984)
- ML20209D146 - Forwards Auxiliary Sys Branch SSER w/technical evaluation rept incorporated re control of heavy loads.Condition to OL requested re Phase II portion that NUREG-0612 be satisfied prior to startup. (3 page(s), 7/16/1984)
- ML20209D154 - Requests evaluation of encl util 840702 ltr re training of licensed operators & supervisors during low power test program to determine acceptability of training program.W/o encl. (1 page(s), 7/18/1984)
- ML20209D211 - Discusses util 840608 ltr re startup test program.Loss of offsite power,coincident w/turbine trip test,may be omitted for Unit 1.Test should be performed on Unit 2 if similar low power testing not conducted. (1 page(s), 6/27/1984)
- ML20209D218 - Initial NSHC determination & noticing action re util 840608 request for amend to License DPR-76,revising Tech Specs re emergency/security plan audit frequency,staff work hours & notification of failure of PORVs & safety valves. (2 page(s), 7/17/1984)
- ML20209D224 - Forwards list of Westinghouse & B&W plants required to submit rept describing mods to reactor trip sys,per Item 4.3 of Generic Ltr 83-28 & status of item review.Requests licensee be contacted for needed info. (7 page(s), 7/20/1984)
- ML20209D230 - Forwards,for concurrence,SSER 27 supporting issuance of full power license.Requests specific review of seismic design bases revalidation program,jet impingement & piping & piping supports.W/o encl. (5 page(s), 7/26/1984)
- ML20209D235 - Forwards publications release forms for SSERs 25,26 & 27. Comments integrated & approved for issuance.Approval for printing requested.W/o encl. (1 page(s), 7/27/1984)
- ML20209D240 - Forwards RL Rothman,RB McMullen,L Reiter & SJ Brocoum 840801 affidavit in response to Joint Intervenor motion to reopen record on seismic issues. (1 page(s), 8/3/1984)
- ML20209D246 - Joint affidavit of RL Rothman,RB McMullen,L Reiter & SJ Brocoum re evaluation of seismological & geological info provided by Joint Intervenors affecting seismic design basis. (27 page(s), 8/1/1984)
- ML20209D252 - Forwards SSER 26 re status of allegations,based on input for listed sections.W/o encl. (3 page(s), 7/27/1984)
- ML20209D272 - Forwards request for addl info on small & large bore piping supports.Info required for full power review of License Condition 7. (2 page(s), 8/21/1984)
- ML20209D292 - Notifies of completion of review of util 840808 submittal of proposed changes to initial test program.Proposed changes & justifications acceptable. (1 page(s), 8/31/1984)
- ML20209D298 - Requests confirmatory review of supplemental info re safety parameter display sys to ensure info responds to NRC request & design complies w/Commission approved requirements in NUREG-0737,Suppl 1.Conclusions requested within 30 days. (1 page(s), 9/18/1984)
- ML20209D304 - Forwards list of questions & comments on draft Test Procedure 42.7 re natural circulation & boron mixing tests. Items addressed need to be resolved prior to approval of test procedure. (3 page(s), 9/19/1984)
- ML20209D324 - Forwards util 831006 & 840731 ltrs describing util efforts & program for Unit 2,significant differences between units & internal review program,for review in preparation for 840913 meeting w/util to discuss internal review plan. (2 page(s), 9/10/1984)
- ML20209D332 - Trip rept of 840816-22 visits to LASL & plant re DHR & Unresolved Safety Issue A-45. (19 page(s), 9/21/1984)
- ML20209D427 - Advises that no further review of Unit 2 mechanical & electrical sys by Auxiliary Sys & Power Sys Branches necessary.Unit 2 licensing program indicates that Unit 1 IDVP findings being considered for Unit 2. (1 page(s), 10/9/1984)
- ML20209D430 - Submits review & closeout plan for Multi-plant Action Items F-08 (TMII.D.1) re detailed control room design review & F-09 (TMI Item I.D.2) re safety parameter display sys. (2 page(s), 10/10/1984)
- ML20209D438 - Advises of potential slip in fuel load schedule.Latest date of late Nov 1984 overly optimistic.Div of Engineering does not expect to complete effort before mid-Dec 1984.SSER issue date of mid-Jan more realistic. (1 page(s), 10/17/1984)
- ML20209D455 - Forwards review status of facilities omitted from H Denton 840924 memo re near-term OLs.Procedures & Sys Review Branch review of Wolf Creek incomplete pending responses to FSAR Chapter 14 amend info requests. (2 page(s), 10/19/1984)
- ML20209D460 - Informs that proposed Unit 2 Tech Specs will be same as Unit 1,except for design differences,per HR Denton 840723 NRR Ofc Ltr 38.Review not required. (2 page(s), 10/19/1984)
- ML20209D465 - Informs of review of Tech Specs 3/4.7.12, "UHS" & 3/4.7.13, "Flood Protection." Limiting conditions for operation, surveillance requirements & bases of Tech Specs acceptable. (1 page(s), 10/22/1984)
- ML20209D470 - Requests addl info for equipment qualification review re pump & valve operability assurance & electric equipment important to safety. (2 page(s), 10/18/1984)
- ML20209D475 - Discusses requested action plan required to fulfill Commission 841005 order authorizing extension of OL. Extension,in form of immediate effective order,will be prepared by 841029. (1 page(s), 10/24/1984)
- ML20209D484 - Forwards ltr to be issued to selected licenses,requesting info re procedures & training for seismic events.Ltrs should be issued within next 2 wks.Responses should be sent to Jenkins. (1 page(s), 10/22/1984)
- ML20209D489 - Forwards for consideration,EG&G comments on inservice testing program for pumps & valves.Valves identified in encl EG&G Rept EGG-EA-6354 not tested per 10CFR50,App J.W/o rept. (2 page(s), 10/31/1984)
- ML20209D495 - Notifies that review of summary statements of allegations yields no items that would preclude issuance of full-power OL. (2 page(s), 11/1/1984)
- ML20209D507 - Forwards SSER for Section 5.2.4,concluding that,due to rev in Apps G & H,10CFR50,matls & surveillance program now in compliance. (4 page(s), 11/1/1984)
- ML20209D527 - Forwards request for addl info re designs of piping & pipe supports in order to complete audit intiated during wk of 841022-26. (2 page(s), 11/7/1984)
- ML20209D537 - Forwards SSER input re qualification & training of shift advisors & reactor operators working in control room shared by both units.Encl license condition re startup testing recommended. (4 page(s), 11/6/1984)
- ML20209D541 - Forwards summary of review activities that structural team plans to undertake during plant reevaluation.Next audit scheduled for 841106-09. (3 page(s), 11/7/1984)
- ML20209D580 - Forwards summary table for licensing decisions scheduled in near future.Requests all necessary steps be taken to ensure issues resolved & certification received,per listed schedule.Summary table of key dates encl. (3 page(s), 11/26/1984)
- ML20209D592 - Forwards info re shunt trip mods for Westinhouse plants & expected completion dates,per Commissioner Zech request. Project managers should obtain listed data to complete tables. (4 page(s), 11/26/1984)
- ML20209D618 - Notification of 841211 meeting w/util in Bethesda,MD to discuss probabilistic risk analysis & deterministic studies for seismic reevaluation program. (3 page(s), 11/21/1984)
- ML20209D622 - Forwards draft ltr to licensees transmitting safety evaluation closing out NUREG-0737,Item II.K.2.13, "Thermal-Mechanical Rept." (15 page(s), 5/30/1984)
- ML20209D624 - Responds to 841127 request for review of SER Section 4.0 re identification of vital areas.Facility has auxiliary saltwater sys not svc water sys. (1 page(s), 12/4/1984)
- ML20209D636 - Requests participation of K Manoly in facility pipe & pipe support audit be extended to include 1 addl wk in early Jan 1985. (1 page(s), 12/7/1984)
- ML20209D655 - Informs that transcript of NRR 841127 interview of alleger re aspects of plant design & analysis & any info related to individual considered confidential & provided on need to know basis. (1 page(s), 12/4/1984)
- ML20209D660 - Confirms telcon request for preparation of transcript of 841127 investigative interview in San Francisco,CA. (1 page(s), 11/27/1984)
- ML20209D669 - Forwards list of allegations for which branch responsible & corresponding applicability code,per 841130 request.Licensee should provide info for review re RHR sys low flow alarms. Review of Tech Specs necessary to correct deficiencies. (2 page(s), 12/10/1984)
- ML20209D674 - Forwards SSER on inservice testing program for pumps & valves.Item 13 re check valves in safety injection sys RHR sys requires rev to Tech Specs. (14 page(s), 12/12/1984)
- ML20209D697 - Forwards completed & updated Tech Specs for confirmation,per B Sheron 841101 memo re inconsistencies between FSAR analysis & Tech Specs based on review of other near-term OL Westinghouse Tech Specs.Response requested by 850107. (3 page(s), 12/17/1984)
- ML20209D712 - Responds to request to answer question re applicability of Unit 1 SER for control of heavy loads (NUREG-0612,Phase I) to Unit 2.Info identical for both units.Separate SER for Unit 2 will not be submitted. (2 page(s), 12/21/1984)
- ML20209D722 - Discusses Auxiliary Sys Branch confirmatory review of listed Tech Specs in response to 841217 request.No comments provided. (2 page(s), 12/21/1984)
- ML20209D728 - Forwards request for addl info re small bore piping loads on civil structures.Response due by 850111 to maintain SSER schedule. (2 page(s), 1/3/1985)
- ML20209D736 - Discusses review of Tech Spec sections re chemistry,boration sys,fire detection instrumentation,fire suppression sys,fire barrier penetrations & review & audit.Minor comments discussed & resolved w/C Moon. (1 page(s), 1/4/1985)
- ML20209D741 - Advises that Tech Spec Table 3.4-1 re check valves in safety injection & RHR sys should be revised to incorporate check valves identified during review of Unit 1 inservice testing program for pumps & valves. (1 page(s), 11/13/1984)
- ML20209D747 - Forwards marked-up changes to updated Tech Specs.Tech Specs acceptable w/exception of changes.Changes based on Unit 2 design which utilizes only one hydrogen monitor in radwaste sys. (5 page(s), 1/8/1985)
- ML20209D752 - Submits review of Section 3/4.4.9, "Pressure Temp Limits," & bases,per 841217 memo.Section acceptable,except heatup & cooldown curves,Figures 3.4.2 & 3.4.3,applicability must be reduced up to 5 EFPY. (2 page(s), 1/8/1985)
- ML20209D759 - Notifies that Licensee Qualifications Branch has reviewed operator staffing & experience levels at 10 plants scheduled to open in 1985,based primarily on operating shift 1984 experience tables. (3 page(s), 1/7/1985)
- ML20209D766 - Notifies of fuel load date in mid-Feb 1985.Reviews should be complete re design verification effort,piping & supports, open items & allegations.Status of staff action on items encl. (6 page(s), 1/11/1985)
- ML20209D801 - Responds to 841217 request for Containment Sys Branch review of Tech Specs to assure that Tech Specs consistent w/FSAR. Section 3/4.6 acceptable w/encl exceptions.Section 3/4.6.2.2, "Spray Additive Sys" not in branch review area. (3 page(s), 1/22/1985)
- ML20209D804 - Discusses intent of Generic Ltr 84-24.Certification addressing all IE bulletins & info notices expected to consist of only few sentences.Response by end of Jan acceptable. (1 page(s), 1/15/1985)
- ML20209D811 - Outlines items to be addressed in order to ensure timely implementation of Generic Ltr 83-28 & consistency w/Unit 2. Item 1.1 requests specific details re post-trip review program.Response of 840201 only refs procedure. (2 page(s), 1/15/1985)
- ML20209D817 - Forwards results of Instrument & Control Sys Branch preliminary review of applicant responses to listed items in Generic Ltr 83-28.Many responses inadequate for review. Results used to prepared encl request for addl info. (2 page(s), 1/22/1985)
- ML20209D822 - Concurs w/util 841226 justification not to perform special low power test program.Participation by operating staff of both units during special low power testing on Unit 1 satisfies I.G.1 requirements.SSER encl. (2 page(s), 1/22/1985)
- ML20209D828 - Forwards list of correspondence between Region V & util re allegations on facility.Disagrees w/Region V suggestion that documents be issued as Board notifications since correspondence already provided to svc list. (2 page(s), 1/16/1985)
- ML20209D842 - Forwards 841116 ltr from anonymous engineer to director of IE re shear stress calculations for welds & members performed by Bechtel-Gaithersburg using Bechtel-San Francisco procedures.Encl withheld. (1 page(s), 1/22/1985)
- ML20209D853 - Forwards results of survey re compliance w/RSB 5-1 natural circulation test criterion for Westinghouse PWRs. (2 page(s), 1/30/1985)
- ML20209D858 - Requests incorporation of stated condition in OL to ensure timely implementation of Generic Ltr 83-28 re generic implications of Salem ATWS events.Condition reflects applicant 850124 commitment. (2 page(s), 2/1/1985)
- ML20209D875 - Forwards Instrumentation & Control Sys Branch SER re conformance to Reg Guide 1.97.Design acceptable.Review based on licensee 830418,0909 & 840904 submittals & encl EG&G technical evaluation rept. (2 page(s), 1/31/1985)
- ML20209D880 - "Conformance to Reg Guide 1.97,Diablo Canyon Nuclear Power Plant Units 1 & 2." (14 page(s), 10/31/1984)
- ML20209D891 - Forwards Fermi 2 & Diablo Canyon 1 SSERs for inservice testing program for pumps & valves,issued 840906 & 1212, respectively. (1 page(s), 1/30/1985)
- ML20209D910 - Forwards SSER input re masonry wall issue.License condition re applicant use of energy-balance technique to qualify 42 masonry walls recommended. (1 page(s), 2/11/1985)
- ML20209D915 - Forwards QA Branch SSER input re QA program design verification in response to 850111 request.QA program reflects description before issuance of CP in 1970 & acceptable. (2 page(s), 2/12/1985)
- ML20209D921 - Forwards evaluation of 10CFR50 App R Sections III.G,III.J & III.O deviations,per applicant 841206 request.Proposed alternate fire protection configuration acceptable. Deviation areas that should be granted listed. (34 page(s), 2/12/1985)
- ML20209D941 - Forwards addl input for SSER re need for jet impingement shields for protection of certain auxiliary feedwater sys valves against moderate energy line breaks.Applicant resolution acceptable. (3 page(s), 2/13/1985)
- ML20209D946 - Forwards marked-up Tech Spec Section 3/4.8 re electrical power sys identifying differences between FSAR analysis & Rev 4 to NUREG-0452,in response to 841217 request for review. (25 page(s), 1/14/1985)
- ML20209D967 - Forwards current schedule for remaining plants subj to Multi-Plant Action B-82,Item 4.3, "Actuations of Shunt Trip Attachment." All related correspondence requested. (2 page(s), 2/15/1985)
- ML20209D980 - Forwards allegation summary sheets for Allegations 1452 & 1454.Allegations assigned Code E. (3 page(s), 2/19/1985)
- ML20209D999 - Forwards Auxiliary Sys Branch SSER input re Section 9.1.5, "Overhead Heavy Load Handling Sys." Objective,identified in NUREG-0612 for providing max practical defense in depth, satisfied w/o further action.License condition removed. (2 page(s), 2/25/1985)
- ML20209E008 - Advises that documents used to support resolution of facility allegation must be filed in PDR.Supporting documents for allegation will not be placed in PDR before resolution of allegation filed. (2 page(s), 2/14/1985)
- ML20209E041 - Informs that review responsibility of Allegations 1009,1021, 1270,1381,1397 & 1399 transferred back to Region V. (1 page(s), 2/25/1985)
- ML20209E047 - Forwards details for GAP 840621 Allegations 1228,1229,1230, 1231 & 1232 re NUREG-0737,Items II.B.3,II.K.3.30 & II.K.3.31,II.B.2 & III.D.1.1,respectively.Evaluation by 850131 requested.Encl withheld. (2 page(s), 1/23/1985)
- ML20209E054 - Forwards second operational readiness rept for facility prior to issuance of OL.Rept includes only sections needing updating rather than total historical profile included in first rept. (1 page(s), 1/24/1985)
- ML20209E058 - "Supplemental Summary Rept for Regional Evaluation." (11 page(s), 1/15/1985)
- ML20209E057 - Forwards final draft of SSER 29 for review & concurrence. Draft contains evaluation of util internal review program & specific technical resolution of concerns.List of open issues & principal contributors encl.W/o SSER. (88 page(s), 3/5/1985)
- ML20209E070 - Recommends deletion of all info & refs to Unit 1 for Unit 2 Tech Specs.Reissuance of Tech Specs at later date w/rev to Unit 1 after Sholly process complete recommended. (2 page(s), 1/15/1985)
- ML20209E086 - Forwards branch review of natural circulation boron mixing test procedure mods based on util 850225 submittal.Procedure acceptable.Licensee committed to submit post-test rept for review. (4 page(s), 3/14/1985)
- ML20209E098 - Requests assistance to review mass & energy release for facility.Review of valve house pressure & temp response due to main steam line break that produces super heated steam. (1 page(s), 3/19/1985)
- ML20209E103 - Discusses proposed review plan for util 850130 long-term seismic program.Formation of NRR Div of Engineering review group to review plan & interact w/util during 3-yr execution & program implementation recommended. (4 page(s), 3/20/1985)
- ML20209E109 - Forwards safety evaluation re acceptability of SPDS isolators,per util response to Generic Ltr 82-33.Isolators acceptable. (1 page(s), 3/19/1985)
- ML20209E112 - Submits daily highlight.NRC advised by util that unit will be ready for fuel load by 850331 instead of late Feb 1985,as previously scheduled.Delay due to turnover from const to operations & completion of const activities. (1 page(s), 1/3/1985)
- ML20209E117 - Forwards request for addl info re Tech Specs,for transmittal to util.Items numbered as additions to 850306 request. (4 page(s), 3/20/1985)
- ML20209E124 - Forwards Mechanical Engineering Branch SSER re inservice testing program for pumps & valves as input to next SSER. SER provides interim approval of inservice testing program for 2-yr period from OL issuance date. (3 page(s), 3/22/1985)
- ML20209E139 - Discusses proposed review plan for util long-term seismic program.Div of Engineering should provide staff position re seismic hazard curves & component/structure fragility due to heavy involvement. (1 page(s), 3/22/1985)
- ML20209E146 - Requests review of startup experience (LERs) compared w/average plant & most recent SALP results.Evaluation of licensee readiness to assume two unit operation requested by 850408. (1 page(s), 3/27/1985)
- ML20209E173 - Forwards draft OL for mods & concurrence within 1 wk of ltr date.SSER inputs on listed items required by 850329 to support license issuance.Draft FR notice also encl. (13 page(s), 3/21/1985)
- ML20209E199 - Submits status rept re natural circulation boron mixing test.SS Diab will witness test at San Luis Obispo,CA scheduled for 850329.Trip rept & seminar re observations will be prepared. (2 page(s), 3/25/1985)
- ML20209E218 - Forwards SSER re adequacy of shift staffing,need for shift advisors & need for license conditions,in response to H Schierling request. (1 page(s), 4/1/1985)
- ML20209E224 - Notifies that util fulfilled all Radiological Assessment Branch FSAR outstanding info requirements.No addl info required.Marked-up SER Section 3-8 encl. (2 page(s), 3/14/1985)
- ML20209E228 - Forwards SSER input supporting "Thermal Mechanical Rept, NUREG-0737,II.K.2.13." Proposed license conditions for resolution of steam generator tube rupture design basis event & Tech Specs encl. (7 page(s), 4/5/1985)
- ML20209E234 - Discusses review of status of inputs to SSER re plant shielding,per HL Thompson 850328 memo.Encl SSER identifies & indicates acceptability of util submittals re NUREG-0737, TMI Item II.B.2.No further info required. (3 page(s), 4/3/1985)
- ML20209E242 - Forwards Human Factors Engineering Branch SSER 31 closing out NUREG-0737,Item I.D.1 re control room design review. Requirement for detailed control room design review will be made license condition. (2 page(s), 4/8/1985)
- ML20209E250 - Forwards SER re util reanalysis of compartmental temp response due to main steam line break outside containment. Based on evaluation,facility produces insignificant amount of super heated steam. (2 page(s), 4/9/1985)
- ML20209E254 - Informs that App B to environ protection plan appropriate for issuance for facility,per Nov 1984 review. (1 page(s), 4/10/1985)
- ML20209E259 - Forwards SSER 28 re allegations received through 850301,for comments & concurrence.W/o encl. (2 page(s), 4/4/1985)
- ML20209E281 - Forwards SSER input re NUREG-0737,Item II.K.3.30 on small break LOCA methods & Item II.K.3.31 on plant-specific calculations,per request.No need to condition license on issues. (2 page(s), 4/11/1985)
- ML20209E289 - Responds to C Grimes request re operating experience. Nonsecurity & nonseismic-related reportable events reviewed from 831115-850228.Operational performance during low power & initial full power periods acceptable. (5 page(s), 4/11/1985)
- ML20209E293 - Requests addl info re steam generator tube rupture design basis event.Previous assumptions re conservativeness of radioactive releases & environ conditions in error. (5 page(s), 4/12/1985)
- ML20209E311 - Forwards SSER re SPDS.Concerns identified re adequacy of containment integrity data.Hydrogen concentration should be displayed within SPDS,per proposed license condition.Unit 1 SPDS will also add requirement. (2 page(s), 4/16/1985)
- ML20209E319 - Requests CRESS overtime on 850413-14 for personnel to complete SSER 28.Documents needed by 850415 to support issuance of Unit 2 license. (1 page(s), 4/12/1985)
- ML20209E324 - Forwards observation & synopsis of util 850328 natural circulation test at Unit 1.Test designed to address requirements of Branch Technical Position RSB 5-1.Post-test rept being prepared by util & Westinghouse. (7 page(s), 4/17/1985)
- ML20209E331 - Submits SER re containment isolation dependability by demonstration of containment purge & vent valve operability. Util shall limit 12-inch vacuum/overpressure relief valve opening to less than or equal to 50 degrees. (2 page(s), 4/16/1985)
- ML20209E338 - Notifies of licensing status for low power license,in response to HR Denton 850322 memo.Subj to inclusion of four noted conditions,Div of Human Factors Safety has completed review & concurs w/issuance of license. (2 page(s), 4/15/1985)
- ML20209E347 - Forwards Auxiliary Sys Branch SSER re Tech Spec requirements for auxiliary feedwater sys,per NUREG-0737 Item II.E.1.1. Review of Tech Spec restrictions on cranes will be evaluated by Structural & Geotechnical Engineering Branch. (2 page(s), 4/22/1985)
- ML20209E353 - Forwards Equipment Qualification Branch SSER 31 input re environ qualification of electrical equipment important to safety.Applicant environ qualification program acceptable. (1 page(s), 4/22/1985)
- ML20209E360 - Advises that util 850222 inservice insp program for first 10-yr insp interval inconsistent w/requirements of 10CFR50.55a(g)(4).Exemption may be required.SSER encl. (2 page(s), 4/22/1985)
- ML20209E370 - Accepts radiological effluent Tech Specs as presently modified w/exception of partially illegible diagram of Figure 5.1-3.Diagram should be replaced w/master copy of diagrams for Figures 5.1-1 & 5.1-2. (2 page(s), 4/19/1985)
- ML20209E376 - Forwards Tech Specs (NUREG-1132) for incoporation into OL. NUREG-1132 reflects design differences & new regulatory requirements not in STS,per NUREG-0452. (1 page(s), 4/25/1985)
- ML20209E383 - Advises that status of TMI Action Item I.D.1 not closed. Status requirements pending util submittal & NRC review & evaluation of detailed control room design review suppl summary rept. (1 page(s), 4/26/1985)
- ML20209E394 - Forwards final draft Tech Specs for transmittal to applicant for review & certification of consistency w/FSAR,SER & as-built plant.Combined Tech Specs for Units 1 & 2 will be prepared prior to full power licensing of Unit 2. (17 page(s), 4/23/1985)
- ML20209E400 - Requests info re operability of 12-inch vacuum/overpressure relief valves per TMI Item II.E.4.2.Util should choose opening angle to demonstrate operability.Info demonstrating ability of valve to close against LOCA requested. (2 page(s), 4/29/1985)
- ML20209E406 - Concurs w/issuance of SSER 31 w/deletion of SPDS hydrogen indication license condition.Plant-specific emergency response guidelines & detailed control room design reviews incomplete.Revised input to SSER 31 encl. (4 page(s), 4/26/1985)
- ML20209E415 - Forwards sample corrected draft technical evaluation rept & issuing ltr for Ft Calhoun per Generic Ltr 83-28,Item 1.2. Project managers should work w/T Bournia to schedule & conduct followup conferences. (2 page(s), 4/30/1985)
- ML20209E421 - Submits daily highlight.On 850426,low power license issued, per Commission 850423 authorization. (1 page(s), 4/29/1985)
- ML20209E429 - Recommends that encl draft board notification advising of issuance of SSER 28 be sent to ASLAB.WJ Dircks 850422 memo to Commission forwarding SSER 28 encl. (2 page(s), 4/25/1985)
- ML20209E434 - Submits daily highlight.On 850426,low power license issued as authorized by Commission on 850423.Fuel load will not begin until 850501.Criticality expected in late June. (1 page(s), 4/29/1985)
- ML20209F324 - SER re util 830418 response to Generic Ltr 82-33 re conformance of post-accident monitoring instrumentation to Rev 2 of Reg Guide 1.97.Response acceptable. (3 page(s), 1/31/1985)
- ML20209F410 - SSER re util 840926 evaluation of masonry walls in response to IE Bulletin 80-11.Plant may be safely operated while issues resolved in accordance w/stated license condition. (4 page(s), 2/11/1985)
- ML20209F711 - Notifies that marked-up SSER 29 containing comments & corrections being sent to H Schierling,per 850305 request. Mods to SSER will be provided when addl info re open items transmitted by util. (1 page(s), 3/5/1985)
- ML20209F791 - Safety evaluation re util 830802 SAR & 840904 addl info re SPDS,provided as part of emergency response facility data sys.Submittals acceptable per NUREG-0737. (3 page(s), 3/19/1985)
- ML20209F911 - SSER re adequacy of shift staffing & need for shift advisors & license conditions,per recent concerns.Util has adequate number of qualified operators & need for shift advisors & license conditions not evident. (6 page(s), 4/1/1985)
- ML20209G099 - Submits daily highlight.On 850405,Vendor Program Branch completing insp of Cardinal Industrial Poducts,Inc re matls provided to util & contractor for plant,per IE Bulletin 84-52 & GAP 850314 supplemental 2.206 petition. (1 page(s), 4/5/1985)
- ML20209G162 - SSER 31 re performance of DCRDR per Suppl 1 to NUREG-0737, Item 1.D.1.Satisfactory implementation of of control room improvements required for licensing,per util 850208 commitment,will minimize potential for operator error. (2 page(s), 4/8/1985)
- ML20209G204 - Recommends listed changes to facility licensing package, including addition of ref condition on vent & purge valve operability. (2 page(s), 4/11/1985)
- ML20209G431 - SSER re util submittal of addl info concerning SPDS,per Suppl 1 to NUREG-0737.Listed license condition,adding hydrogen concentration as important sympton of severe accident to be displayed on SPDS,recommended. (7 page(s), 4/16/1985)
- ML20209G459 - SSER re environ qualification of electric equipment important to safety.Util program consistent w/10CFR50.49 & acceptable,based on review of listed submittals. (4 page(s), 4/22/1985)
- ML20209G470 - SSER re util 801223 request for relief from 10CFR50a(g)(4)(i) requirements concerning inservice insp & testing requirements.NRC concurs w/licensee in specifying ref ASME Code as applicable code for initial insp. (3 page(s), 3/6/1981)