Home > NRC Library > ADAMS Public Documents
Final response to FOIA request for documents.Records in App A-H encl & will be available in PDR.Portions of App C-H records withheld in part (ref FOIA exemptions 5,6 & 7C).App I-M records totally withheld (ref FOIA exemption 5).
Accession Number: ML082401288
Date Released: Thursday, October 24, 2024
Package Contents
The following links on this page are to Adobe Portable Document Format (PDF) files. To obtain a free viewer for displaying this format, see our Plugins, Viewers, and Other Tools.
- ML082520512 - Final response to FOIA request for documents.Records in App A-H encl & will be available in PDR.Portions of App C-H records withheld in part (ref FOIA exemptions 5,6 & 7C).App I-M records totally withheld (ref FOIA exemption 5). (52 page(s), 8/27/1996)
- ML082560071 - Final response to FOIA request for documents.Records in App A-H encl & will be available in PDR.Portions of App C-H records withheld in part (ref FOIA exemptions 5,6 & 7C).App I-M records totally withheld (ref FOIA exemption 5), Continuance of Response. (54 page(s), 8/27/1996)
- ML20129H766 - Transcript of 920507 interview of R Whitaker in Waynesboro, GA.Pp 1-34.Supporting documentation encl. (321 page(s), 5/7/1992)
- ML20129J136 - Notice of violation & proposed imposition of civil penalty in amount of $50,000.Noncompliance noted:licensee failed to provide adequate protection for documents & matls containing safeguards info as evidence by listed examples. (16 page(s), 2/5/1991)
- ML20129J031 - Rev 4 to Procedure PTDB-1 Tab 8.0, "Pictorial Aids." Supporting documentation encl. (5 page(s), 9/18/1990)
- ML20129H920 - Discusses allegation re errors made in plant,unit 1 shutdown margin calculation on 890119. (7 page(s), 7/30/1991)
- ML20129J129 - Forwards NOV & Proposed Imposition of Civil Penalty of $50,000 re insp repts 50-425/90-27 & 50-425/90-27 on 901016-17. (4 page(s), 2/5/1991)
- ML20129H888 - "Operations Shift & Daily Surveillance Logs." (23 page(s), 11/22/1988)
- ML20129H722 - Submits statement re sequence of events involving lost of RHR. (2 page(s), 10/28/1991)
- ML20134F010 - Partial deleted staff requirments memo re SECY-91-387, "Proposed Enforcement Action Against Georgia Power Co, Vogtle Electric Generating Plant units 1 & 2." (19 page(s), 12/27/1991)
- ML20134E682 - Responds to NRC 920327 ltr re violations noted in insp rept. Corrective actions:company implemented Positive Discipline Program & referred to outpatient rehabilitation program & to increase testing frequency. (3 page(s), 4/27/1992)
- ML20134E829 - Notification of investigation case 2-94-013R, "Alleged Falsification of Battery Cell Maint Data Sheet." (24 page(s), 4/20/1994)
- ML20134E909 - Partially deleted ltr forwarding allegation summary of concerns re failure to control & rept discovery of unsecured safeguards info & alleged inaacurate info provided to NRC. (12 page(s), 8/27/1992)
- ML20134E875 - Partially deleted transcript of 920513 enforcement conference re JD Davis in Atlanta,GA.Pp 1-46. (46 page(s), 5/13/1992)
- ML20134E729 - Rev 7 to procedure 14515-1, "Piping Penetration Area Filtration & Exhaust Sys Operability Test." (7 page(s), 5/14/1991)
- ML20134E883 - Informs that calcon switch issue scheduled to be panelled on 950111. (1 page(s), 1/10/1995)
- ML20134E819 - Discusses Vogtle response to enforcement action 91-141 re opening of chemical injection valves at Vogtle. (8 page(s), 7/28/1992)
- ML20129H699 - FOIA request for documents re all portions of certain documents maintained by NRC which contain info incorrect, inaccurate,irrelevant,untimely,incomplete & otherwise improper info to be amended. (13 page(s), 5/2/1995)
- ML20129J075 - Discusses allegation number RII-90-A-0124 re alleged failure to control & report discovery of unsecured safeguards info for plant,Unit 1 & 2. (8 page(s), 12/21/1990)
- ML20127B464 - Forwards LER re personnel error leading to unsecured safeguards info on 900829.Rept withheld. (1 page(s), 9/25/1990)
- ML20134E735 - "Procedures for Conducting Open Enforcement Conferences During the Agency Two-Year Trial Program." (21 page(s), 3/24/1994)
- ML20129J027 - Concurs w/900629 request for change to suppl request RII-90-02,so that separate & distinct investigation action could be initiated on change.Suppl request should be changed to RII-90-08. (10 page(s), 7/24/1990)
- ML20129H929 - "Operations Supervisor Relief Checklist." (1 page(s), 5/16/1988)
- ML20129H792 - "VCT Gas Control & RCS Chemical Addition." (30 page(s), 4/15/1988)
- ML20127B936 - Demand for info re allegation that plant intentionally placed in condition prohibited by TS to facilitate outage activities. (8 page(s), 6/3/1991)
- ML20129H696 - Investigation rept 2-90-001 on 960919.Noncompliance noted. Investigation substantiated allegation that TS 3.4.1.4.2 was knowingly & intentionally violated in October 1988,by plant Operation shift supervisors w/operation manager knowledge. (46 page(s), 3/19/1991)
- ML20134E999 - Forwards for review & concurrence,proposed closeout ltr for outstanding issue associated w/California Controls sensors used on EDG.W/o encl. (1 page(s), 4/3/1995)
- ML20134F520 - LER 90-08S-00:on 901011,eleven documents found unattended & unsecured in folder on desk being moved.Caused by cognitive personnel error.Safeguards documents returned to their approved storage container. (4 page(s), 11/9/1990)
- ML20129H646 - Requests that OI approval be provided for release of investigative synopsis for Case 2-90-001,for plant Units 1 & 2 to licensee,certain employees & PDR. (1 page(s), 4/29/1991)
- ML20134F026 - Partially deleted ltr requesting that ltr & encl in response to demand for info re possible violation of plant TS at unit 1 in Oct 1988,be withheld from public disclosure IAW 10CFR2.790. (13 page(s), 8/29/1991)
- ML20129H882 - Discusses proposed Director's Decision re matl false statement by GPC official during 890330 Commission meeting & whether or not NRC should take enforcement action against GPC. (24 page(s), 10/30/1991)
- ML20134E689 - Discusses plant meeting.B Uryc will be listening in. (1 page(s), 9/7/1993)
- ML20134E843 - Discusses NRR assessment & determination that by opening valves,plant in condition outside regulatory design basis as defined in 10CFR50.2 & reportable. (1 page(s), 7/31/1992)
- ML20129H981 - Partially deleted ltr informing that no further action will be taken due to insufficient evidence to support conclusion that actions relative to opening RMWST valves on 881012&13 were deliberate attempt to disregard & circumvent plant TS. (3 page(s), 12/31/1991)
- ML20134E724 - Discusses review of allegation RII-91-A-0216.Based on 911113 review of meeting agenda & meeting summary for other allegations scheduled,subject allegation discussed & be transmitted to OI for inclusion in ongoing review. (2 page(s), 5/6/1992)
- ML20134E886 - Partially deleted transcript of 920513 enforcement conference re M Wilkins in Atlanta,GA.Pp 1-48. (49 page(s), 5/13/1992)
- ML20134E847 - Informs Linda DRS has no comments re plant enforcement package. (1 page(s), 6/10/1994)
- ML20134E791 - Partially deleted ltr informing of consequences of violation of NRC requirements governing fitness for duty as licensed operator. (3 page(s), 3/27/1992)
- ML20134E804 - Partially deleted NOV from util 920212 ltr.Violation noted: licensee used marijuana as evidenced by confirmed positive test for that drug resulting from urine sample submitted on 920203. (11 page(s), 3/27/1996)
- ML20134F029 - Partially deleted ltr responding to demand for info sent to JH Sniezek on 910603. (25 page(s), 8/29/1991)
- ML082401286 - Requests OI approve release of synopses for Case 2-91-012, Watts Bar Nuclear Plant,Case 2-91-003,Vogtle Electric Generating Plant,Case 2-90-019,Sequoyah Nuclear Plant & Case 2-91-014,Alonso & Carus Ironworks,Inc. (1 page(s), 4/2/1992)
- ML20129H779 - "Control of Safety-Related Locked Valves." (102 page(s), 1/30/1988)
- ML20134F018 - Partiallly deleted ltr re J Sniezek 910603 ltr forwarding demand for info concerning participation in event which occurred at plant in Oct 1988. (22 page(s), 9/29/1991)
- ML20129H805 - FOIA request for documents re possible enforcement action against Georgia Power Co &/or plant & supporting documentation. (1 page(s), 6/7/1991)
- ML20134E963 - Forwards partially deleted draft documents named vogtle1.jrg. (53 page(s), 3/8/1994)
- ML20129H711 - Responds to 910322 ltr addressed to L Robinson,that requested NRC investigation. (3 page(s), 5/17/1991)
- ML20129H903 - "Unit Shift Supervisor Relief Checklist." (7 page(s), 10/24/1988)
- ML20134E855 - Informs that review did not turn up any similar violation to piping pen issue. (3 page(s), 6/14/1994)
- ML20134F088 - Discusses revised plant enforcement action. (1 page(s), 5/5/1994)
- ML20129H653 - Authorizes release of synopsis for Case 2-90-001,per 910429 request. (1 page(s), 5/3/1991)
- ML20129H952 - "Shutdown Margin Calculations." (33 page(s), 3/26/1989)
- ML20129J040 - Forwards draft insp repts 50-424/90-XX & 50-425/90-XX on 900806-17 & NOV. (51 page(s), 10/1/1990)
- ML20127B929 - Demand for info re allegation that plant was intentionally placed in condition prohibited by TS to facilitate outage activities. (4 page(s), 6/3/1991)
- ML20127B941 - Forwards demand for info re allegations that facility intentionally placed in condition prohibited by TS to facilitate outage activities. (2 page(s), 6/3/1991)
- ML20134E695 - Informs B Uryc of 930908 meeting re Vogtle. (1 page(s), 9/7/1993)
- ML20134E699 - Requests assistance to OI to interview w/I&C technicians. (5 page(s), 5/4/1992)
- ML20129H972 - Partial Director's Decision per 10CFR2.206 re alleged unauthorized transfer of plant operating license.Request for action denied. (52 page(s), 9/17/1991)
- ML20129J050 - Draft insp repts 50-424/90-XX & 50-425/90-XX on 900806-17. Violations noted.Major areas inspected:operational philosophy,policy,procedures & practices of facility operating staff & mgt re operational safety. (45 page(s), 9/28/1990)
- ML20129H939 - Submits proposed questions for Vogtle enforcement conferences. (2 page(s), 9/11/1991)
- ML20134E926 - Partial deleted ltr informing of activities that may occur as result of potential violation of NRC license issued under 10CFR55. (1 page(s), 9/21/1992)
- ML20127B329 - Forwards LER re personnel error leading to unsecured safeguards info.LER withheld. (1 page(s), 5/25/1990)
- ML20129H753 - Transcript of 920507 interview of RE Neal in Waynesboro,GA. Pp 1-40. (41 page(s), 5/7/1992)
- ML20127B932 - Forwards demand for info re allegation that facility intentionally placed in condition prohibited by TS to facilitate outage activities. (2 page(s), 6/3/1991)
- ML20129J099 - Requests investigation for allegation number RII-90-A-0124, to determine whether allegations that licensee mgt withheld pertinent info from staff during Enforcement Conference that resulted in escalated enforcement action. (6 page(s), 12/26/1990)
- ML20134E867 - Forwards copy of package signed today by Ebneter for Vogtle EA 94-087. (26 page(s), 6/16/1994)
- ML20129H747 - Confirms 920504 verbal request for assistance in conducting interviews re violation at plant that occurred on 920128 involving improper surveillance performed by two I&C technicians.List of interview questions encl. (80 page(s), 8/27/1996)
- ML20129H800 - Summary of 890919 plant review board meeting PRB-89-125 to discuss specifics of issue from last meeting on chemical addition tank valves. (3 page(s), 9/19/1989)
- ML20129H757 - Rev 1 to Procedure PTDB-1 Tab 8.0, "Pictorial Aids." Supporting documentation encl. (6 page(s), 5/12/1989)
- ML20129H706 - Forwards revised LER re 900320 event involving loss of offsite power leads to site area emergency.Rev necessary to correct info re number of successful DG starts subsequent to comprehensive test program discussed in original rept. (5 page(s), 8/27/1996)
- ML20134E947 - Partially deleted ltr responding to 911017 ltr expressing concern re ALARA practices at plant. (8 page(s), 11/25/1992)
- ML20134E794 - Responds to 920505 request re interviews of Vogtle I&C technicians case 2-92-019.Requests that accomplished matter closed unless addl investigation required. (2 page(s), 5/14/1992)
- ML20129H825 - Informs of 910619 telcon w/E Baker re status of Vogtle demand for info. (4 page(s), 6/19/1991)
- ML20134F071 - Partially deleted memo discussing info ref to OI re assignments for 2.206 petition re licensed facilities. (3 page(s), 12/21/1990)
- ML20129H914 - Notification of significant licensee meeting w/util on 911216 to discuss circumstances associated w/failure to provide accurate info to NRC during insp as documented in insp 50-424/90-19,50-425/90-19 & 50-424/90-19,Suppl I. (19 page(s), 11/27/1991)
- ML20127B945 - Demand for info re allegation that plant intentionally placed in condition prohibited by TS in order to facilitate outage activities. (5 page(s), 6/3/1991)
- ML20129H661 - Forwards rept of investigation re alleged intentional violation of TS by Vogtle operations manager,Case 2-90-001. (2 page(s), 3/26/1991)
- ML20129H861 - Forwards rev of Commission paper & proposed enforcement action resulting from staff review of OI rept 2-90-001, reflecting incorporation of comments received from NRR,OCG & Region II & requests review. (25 page(s), 11/18/1991)
- ML20129H897 - Forwards for info & action,anonymous allegation received in 900302 ltr.Requests that similarity to allegation referred in RFI RII-90-02 be incorporated in investigative activity being conducted in investigation Q2-90-001. (2 page(s), 8/27/1996)
- ML20129H834 - Forwards & discusses NOV & proposed imposition of civil penalty in amount of $40,000 re insp repts 50-424/90-16 & 50-425/90-16. (425 page(s), 10/19/1990)
- ML20129H678 - Discusses completed review of OI rept of investigation Case 2-91-003 & determined that no addl action required. (1 page(s), 3/31/1992)
- ML20129J035 - Submits comments on plant insp rept - draft 6. (3 page(s), 9/18/1990)
- ML20134E749 - Discusses Vogtle Commission Paper. (1 page(s), 4/19/1994)
- ML20129H642 - NRC Insp Manual Chapter 9900,Technical Guidance, "Maint Voluntary Entry into Limiting Conditions for Operation Action Statements to Perform Preventive Maint." (3 page(s), 4/18/1991)
- ML20129H728 - Requests that supplemental response to NRC demand for info be withheld from placement in PDR per 10CFR2.790 until decision is made in matter & responds to questions not previously addressed. (11 page(s), 10/1/1991)
- ML20129H771 - Forwards responses to Sections I-IV of additional suppl to 910708 suppl to 900911 petition of M Hobby & Mosbaugh. (80 page(s), 10/3/1991)
- ML20129H856 - Summarizes 910619 meeting w/G Hairston re current operating status of listed plants. (5 page(s), 7/3/1991)
- ML20134E902 - Discusses Calcon ltr already in signature circuit now. (2 page(s), 2/7/1995)
- ML20129J043 - Draft NOV from insp on 900806-17.Violation noted:licensee provided inaccurate info to insp team on three separate occasions. (5 page(s), 10/1/1990)
- ML20129H615 - Rev 7 to Procedure 10004-C, "Shift Relief." Supporting documentation encl. (4 page(s), 3/20/1991)
- ML20129H908 - Rev 3 to Procedure PTDB-1 Tab 8.0, "Pictorial Aids." Supporting documentation encl. (15 page(s), 4/16/1990)
- ML20129H872 - "Shutdown Margin Calculations." (8 page(s), 10/14/1988)
- ML20129H846 - Informs of 910627 telcon w/G Hairston re question raised during 910616 visit to Region II.Discusses similar situation w/Sequoyah that appeared to be handled differently by Region II. (1 page(s), 7/3/1991)
- ML20134E692 - Discusses JY Vorse 920424 telcon w/F Digiammarino,DOJ & Southern District of GA re I&C technicians willful violation of procedure,Case 2-92-005. (1 page(s), 4/28/1992)
- ML20129H820 - Responds to FOIA request for documents from B Smith re possible enforcement action against GAP &/or plant.Request captures pending enforcement action & would be exempt. (1 page(s), 6/12/1991)
- ML20134E745 - Partially deleted ltr issuing license SOP-20458-1 for JE Bowles.Issuance of license based upon exam of qualifications. (1 page(s), 1/24/1989)
- ML20129H776 - Forwards augmented insp team charter to reflect instructions given for insp of events associated w/facility degradation of decay heat removal on 911026. (4 page(s), 10/29/1991)
- ML20134E778 - Transcript of 920513 enforcement hearing in Atlanta,GA re Plant Vogtle.Pp 1-74. (74 page(s), 5/14/1992)
- ML20129J067 - Discusses allegation RII-90-A-024 re alleged failure to control & report discovery of unsecured safeguards info for plant,Units 1 & 2. (8 page(s), 12/12/1990)
- ML20129H664 - Discusses review of regional enforcement recommendation re Vogtle Nuclear Generating Plant,Units 1 & 2 & concur w/action proposed. (5 page(s), 3/23/1992)
- ML20129H879 - "Shutdown Margin Calculations." (10 page(s), 10/14/1988)
- ML20129H945 - Transcript of 911216 Enforcement Conference in Region II re GAP plant.Pp 1-114. (114 page(s), 12/16/1991)
- ML20134E977 - Partial deleted ltr informing that Region II Enforcement Panel meeting will be scheduled for 941209. (81 page(s), 12/7/1994)
- ML20134E773 - Forwards corrected copy of transcripts for RE Neal & RS Whitaker of 920507 OI interviews. (60 page(s), 5/12/1992)
- ML20134E904 - Requests details of circumstances pertaining to 920914 staff rept re NRC-licensed operator testing positive for marijuana following random drug test taken on 920907. (2 page(s), 9/21/1992)
- ML20129H867 - Notification of significant licensee meeting w/util on 910919 to obtain info to assist NRC in reaching enforcement decisions re apparent,improper conduct of senior licensed operations personnel during 881012-13 event at Vogtle. (2 page(s), 7/18/1991)
- ML20134B533 - Forwards rept re development of Vogtle enforcement action which contains conclusions & recommendations resulting from review of licensee & individual responses to proposed enforcement action issued to GAP on 940509. (1 page(s), 11/16/1994)
- ML20134E871 - Forwards draft of operator event at Vogtle,Unit 2 on 920807. (7 page(s), 8/13/1992)
- ML20129H874 - Submits summary of 910725 meeting re activities underway throughout agency concerning plant 2.206 corrdinating group. (29 page(s), 7/30/1991)
- ML20134E740 - Partially deleted ltr issuing license SOP-20467-1 for WF Kitchens.Issuance of license based upon exam of qualifications. (1 page(s), 9/6/1988)
- ML20134E851 - Discusses proposed reply to enforcement action 91-141,for Vogtle Electric Generating Plant,Units 1 & 2 re opening of chemical injection valves during modes that required them to be locked closed. (2 page(s), 7/31/1992)
- ML20129H741 - Forwards transcripts from enforcement conference held in Region II on 910919.W/o encl. (1 page(s), 10/2/1991)
- ML20129H995 - Transcript of 910919 enforcement conference re GAP plant. Pp 1-106. (106 page(s), 9/19/1991)
- ML20129H690 - Forwards results of investigation of Case 2-90-001 re allegations that SRO personnel willfully violated condition of nuclear plant TS & subsequently willfully failed to rept violation. (2 page(s), 3/26/1991)
- ML20134E715 - Notification of 920513 meeting w/Georgia Power Co in Atlanta GA to discuss events surrounding a surveillance performed on 920128 by two instrumentation & control technicians. (4 page(s), 5/5/1992)
- ML20129H840 - Requests investigation of allegation RII-90-A-0005 received in anonymous ltr,by plant on 900109.Investigation requested to determine if R Kitchens intentionally violated plant TS on 881013,by allegedly opening locked valves in RCS. (25 page(s), 1/19/1990)
- ML20134E755 - Partially deleted ltr issuing license SOP-20461-1 for JP Cash.Issuance of license based upon exam of qualifications. (7 page(s), 1/31/1989)
- ML20127B543 - Forwards LER 50-424/1990-08S re unsecured safeguards info due to personnel error. (1 page(s), 11/9/1990)
- ML20134E678 - Approves release of synopses of repts of investigation requested in 920402 memo if all civil remedies been concluded. (5 page(s), 4/2/1992)
- ML20129H933 - Discusses 910827 meeting of 2.206 coordinating group held in Atlanta,GA to discuss activities underway throuhgout agency re plant.List of individuals present submitted. (16 page(s), 9/4/1991)
- ML20134E932 - Responds to 920921 ltr requesting addl details of circumstances associated w/drug test taken on 920907. (4 page(s), 10/9/1992)
- ML20134E707 - Requests review of 920427 licensee response for acceptability re plant licensed operator. (2 page(s), 5/5/1992)
- ML20129H737 - Transcript of 920507 interview of JD Davis in Waynesboro, GA.Pp 1-44. (46 page(s), 5/7/1996)
- ML20129J107 - Submits OI response to status of plant 901226 RFI. (1 page(s), 1/9/1991)
- ML20129H851 - "Boration/Dilution Curves." (40 page(s), 10/6/1988)
- ML20129H961 - Discusses proposed Director's Decision issued IAW 10CFR2.206 re matl false statement during 890330 Commission meeting on plant,unit 2. (6 page(s), 9/16/1991)
- ML20129H893 - "Unit Cooldown to Cold Shutdown." (42 page(s), 11/25/1988)
- ML20129J296 - Rev 3 to Procedure 23985-1, "RCS Temporary Water Level Sys." (46 page(s), 9/13/1991)
- ML20129H830 - "Pictorial Aids." (7 page(s), 6/13/1988)
- ML20129H795 - Rev 14 to "Equipment Clearance & Tagging." (43 page(s), 5/23/1988)
- ML20129H989 - Informs of concurrence w/regional enforcement recommendation dtd 911227,re facility proposing three NRC violations w/o escalated enforcement due to AIT review of loss of decay heat removal capability occurring 911026. (2 page(s), 1/8/1992)
- ML20127B919 - Informs of NRC enforcement conference on improper actions re event which occurred at plant on 881012-13.NRC concerned that recipient may have intentionally disregarded TS to facilitate outage activities.Demand for info encl. (2 page(s), 6/3/1991)
- ML20129H814 - Forwards FOIA request from B Smith for copies of ltrs re possible enforcement action against Georgia Power Co &/or plant. (3 page(s), 6/11/1991)
- ML20134F517 - LER 90-07S-00:on 900829,safeguards info container observed unsecured & unattended in document file room.Caused by safeguards info coordinator failure to secure container before going to lunch.Coordinator counseled & reprimanded. (5 page(s), 9/25/1990)
- ML20129H789 - Summary of 890914 plant review board meeting PRB-89-124 to discuss policy to be followed when individual has problem, question or issue on reportability.Issues from 890913 Safety Review Board Meeting also discussed. (8 page(s), 9/14/1989)
- ML20129H985 - Transcript of 910919 enforcement conference re GAP plant. Pp 1-135. (135 page(s), 9/19/1991)
- ML20129J117 - Transcript of 960111 meeting in Rockville,MD re implementation of Southern Nuclear Operating Co.Pp 1-49. (51 page(s), 1/11/1991)
- ML20129H733 - Ack receipt of 910607 telephone call re article published in Augusta Chronicle concerning possible enforcement action against plant. (1 page(s), 6/7/1991)
- ML20134E814 - Forwards chronology of safeguard issues identified in Section 2.206 petition filed on behalf of Hobby/Mosbaugh former employees of Georgia Power Co. (5 page(s), 6/25/1992)
- ML20129H691 - Forwards updated Gantt chart depicting major milestones for 10CFR2.206 response by NRR dtd 910910,summary of plant status as of 910918 & updated draft of Partial Directors Decision dtd 910917 from fourth meeting on 910918. (9 page(s), 9/25/1991)
- ML20134E959 - Confirms arrangements made w/util re concerns of open enforcement conference to be conducted at Region II Ofc in Atlanta,GA on 940602. (5 page(s), 5/17/1994)