Home > NRC Library > ADAMS Public Documents
Responds to FOIA request for const completion dates for nuclear plants currently under const & analyses containing estimates based on inclusion of Caseload Forecast Panel meetings.Forwards App A,B & C documents.
Accession Number: ML082380886
Date Released: Thursday, October 24, 2024
Package Contents
The following links on this page are to Adobe Portable Document Format (PDF) files. To obtain a free viewer for displaying this format, see our Plugins, Viewers, and Other Tools.
- ML082380885 - Handwritten notes & calculations re const schedule activities & fuel load preparation.Related info encl. (12 page(s), 10/31/1983)
- ML082890803 - Responds to FOIA request for const completion dates for nuclear plants currently under const & analyses containing estimates based on inclusion of Caseload Forecast Panel meetings.Forwards App A,B & C documents. (19 page(s), 10/31/1983)
- ML20079E005 - Recommends that review schedule be based on 810918 prospective decision date,which also should be used as basis for fuel load date.Summary of 790226 telcon w/applicant encl. (3 page(s), 2/28/1979)
- ML20079E130 - Discusses 790612 meeting w/util re estimated const completion date.Targeting for May 1980 but author suggests late 1980 as possible date.Critical areas are electrical work & hangers. (2 page(s), 6/29/1979)
- ML20079F108 - Summary of 810915 NRC caseload forecast panel meeting & site visit to assess const completion date. (2 page(s), 10/29/1981)
- ML20079F119 - Summary of 811019-21 caseload forecast panel meetings w/util at site re progress of engineering & const. (1 page(s), 11/5/1981)
- ML20079F306 - Trip rept of 820316-19 visit of caseload forecast panel to facility re determination of fuel load dates.Load dates estimated to be Nov 1983,Nov 1984 & Nov 1985 for Units 1, 2 & 3,respectively. (4 page(s), 3/30/1982)
- ML20079P665 - Forwards revised NRC estimates for reactor const completion (fuel load) as of Apr 1983.Review & concurrence requested. (10 page(s), 4/15/1983)
- ML20080D183 - Submits draft rept of 830325 crane accident at plant site. Crane collapsed while lifting 400-ton form assembly for containment shield bldg roof.Cause undetermined. Investigation in progress.Related info encl. (4 page(s), 10/31/1983)
- ML20080D196 - Submits 129th project performance rept for Mar 1983.Related info encl. (22 page(s), 4/20/1983)
- ML20080D205 - Submits 123rd project performance rept for Sept 1982.Related info encl. (6 page(s), 10/25/1982)
- ML20080D208 - Project Performance Rept 109 for Jul 1981.Related info encl. (26 page(s), 7/31/1981)
- ML20080D226 - Forwards proposed schedule for Caseload Forecast Panel site visits.Schedule developed considering licensing review effort & const status & last panel site visit date. (2 page(s), 7/30/1981)
- ML20080D232 - Forwards Caseload Forecast Panel site visit schedule. Schedule developed considering licensing review effort & const status,last panel site visit date & project manager inputs. (2 page(s), 8/25/1981)
- ML20080D246 - Forwards updated listing of recommended Caseload Forecast Panel visits for CY82,per 811214 request.Continued use of applicant date for Bevill schedule purposes expected.Related info encl. (7 page(s), 1/5/1982)
- ML20080D250 - Handwritten graph & calculations re const activities. (3 page(s), 2/22/1983)
- ML20080D255 - Marked-up draft summary of trip rept of Caseload Forecast Panel 830222-24 meetings re const progress review & mgt decision on allocation of staff resources during licensing review. (39 page(s), 3/18/1983)
- ML20080D263 - Draft trip rept of Caseload Forecast Panel 830222-24 site visits re const progress review & estimating resource needs for licensing activities. (4 page(s), 10/31/1983)
- ML20080D277 - Trip rept of 830622-24 Caseload Forecast Panel site visit re plant status review.Projected fuel load date comparisons listed. (2 page(s), 10/31/1983)
- ML20080D286 - Handwritten graphs,calculations & notes re const activities & fuel load preparation.Related info encl. (9 page(s), 10/28/1980)
- ML20080D297 - Summary of 830622-24 Caseload Forecast Panel site visit re plant status review. (7 page(s), 7/27/1983)
- ML20080D306 - Comments on review schedule.Results expected for release in mid-Nov 1982.Projected fuel load date is Nov 1983. (2 page(s), 9/22/1982)
- ML20080D318 - Handwritten notes & calculations re const activities & fuel load preparation. (2 page(s), 4/25/1979)
- ML20080D331 - Comments on 790618 meeting re estimated fuel load date.Util requested site visit & evaluation of const schedule & fuel load date as soon as possible.Related info encl. (8 page(s), 6/18/1979)
- ML20080D335 - Handwritten graphs re const activities.Related info encl. (4 page(s), 6/28/1983)
- ML20080D339 - Marked-up trip rept of 820811-13 Caseload Forecast Panel site visits re const & preoperational testing status.Related info encl. (6 page(s), 10/31/1983)
- ML20080D343 - Handwritten notes re facility fuel load preparation. (7 page(s), 10/31/1983)
- ML20080D346 - Handwritten notes & calculations re const activities & fuel load preparation. (5 page(s), 10/7/1981)
- ML20080D350 - Forwards revised NRC estimates for reactor const completion (fuel load) as of Jul 1983.Review & concurrence requested. Related info encl. (18 page(s), 7/26/1983)
- ML20080D358 - Handwritten notes re fuel load preparation & const activities. (7 page(s), 4/12/1978)
- ML20080D362 - Summary of 790322 meeting w/util in Bethesda,MD re estimated fuel load date for Unit 1.Related info encl. (81 page(s), 4/2/1979)
- ML20080D368 - Graph re const activities. (3 page(s), 10/31/1983)
- ML20080D375 - Responds to 820616 request for const schedule exam.NRC agrees w/1985 fuel load date.Design work & site preparation substantially completed before actual const.Related info encl. (5 page(s), 7/14/1982)
- ML20080D379 - Summarizes 800613 meeting w/util re NRC review of OL application.Related info encl. (9 page(s), 6/13/1980)
- ML20080D381 - Handwritten notes & graph re tests concerning const activities & fuel load dates. (2 page(s), 8/1/1983)
- ML20080D387 - Handwritten notes & calculations re fuel load preparation & const activities. (1 page(s), 8/13/1981)
- ML20080D392 - Handwritten notes & calculations re const & fuel load preparation. (4 page(s), 4/23/1980)
- ML20080D397 - Trip rept of Caseload Forecast Panel 791127-30 site visits re const status.Related info encl. (14 page(s), 1/7/1980)
- ML20080D409 - Forwards T Abell notes re SD Freeman ltr,T Abell marked-up ltr & 780427 trip rept.Realistic fuel load date forecast important. (5 page(s), 6/6/1978)
- ML20080D413 - Requests meeting in June to discuss regulations or methods of operation changed to improve schedules & costs of nuclear plants w/o sacrificing safety concerns.Meeting on 780412-13 re estimated fuel load date summarized. (3 page(s), 5/25/1978)
- ML20080D416 - Handwritten charts,notes & calculations re const activities & estimated const completion.Related info encl. (50 page(s), 8/4/1980)
- ML20080D422 - Summary of 780412-13 meetings at site w/util re const scheduling & observation of in-progress const activities. Projected fuel load dates are Jul 1981 & 1982 for Units 1 & 2,respectively. (7 page(s), 4/27/1978)
- ML20080D425 - Handwritten calculations re const activities.Related info encl. (80 page(s), 8/26/1981)
- ML20080D432 - Handwritten notes & calculations re facility const.Related info encl. (48 page(s), 10/31/1983)
- ML20080D461 - Trip rept of 780418-19 site visit re in-progress const activity observation,const & startup schedules & estimated fuel load date. (2 page(s), 6/9/1978)
- ML20080D465 - Advises of 810303-05 Caseload Forecast Panel site visit results.Const completion scheduled for Oct 1985.Related info encl. (10 page(s), 3/17/1981)
- ML20080D469 - Handwritten notes & calculations re const activities & fuel load preparation.Related info encl. (27 page(s), 4/19/1983)
- ML20080D480 - Handwritten notes & calculations re const activities.Related info encl. (20 page(s), 10/21/1980)
- ML20080D491 - Handwritten notes & calculations re const activities. (3 page(s), 10/31/1983)
- ML20080D497 - Draft trip rept of 780321-22 site visits re const schedules & in-progress const activities observation.Fuel load dates for Units 1 & 2 are Nov 1981 & Nov 1980,respectively. Related info encl. (11 page(s), 10/31/1983)
- ML20080D514 - Trip rept of Caseload Forecast Panel 810929-1001 site visits re const status observation & scheduled completion date. Related info encl. (8 page(s), 11/24/1981)
- ML20080D546 - Handwritten notes & calculations re const & fuel load preparation. (10 page(s), 5/31/1978)
- ML20080D558 - Handwritten notes & calculations re const activities & fuel load preparation. (9 page(s), 8/22/1979)
- ML20080D570 - Handwritten notes & calculations re const activities. (10 page(s), 2/17/1983)
- ML20080D582 - Handwritten notes & calculations re const activities. (5 page(s), 4/5/1983)
- ML20080D586 - Trip rept of 830330-31 Caseload Forecast site visits re current status of const & observation of in-progress activities.Const progress will be reviewed at end of FY83. (13 page(s), 10/31/1983)
- ML20080D590 - Trip rept of Caseload Forecast Panel 800326-27 site visits re const status observation & const completion & fuel load schedules. (2 page(s), 4/9/1980)
- ML20080D596 - Summary of 780726 meeting w/util on site re const completion plans & schedules,const status & scheduled fuel load date. Related info encl. (5 page(s), 8/2/1978)
- ML20080D601 - Responds to DW Hayes request for projected fuel load date evaluation.Licensee projected fuel load date is 790701,while NRC Caseload Forecast Panel projects Dec 1979 as date. (6 page(s), 2/13/1979)
- ML20080D608 - Trip rept of Caseload Forecast Panel 800909-11 site visits re const schedule review. (2 page(s), 10/6/1980)
- ML20080D612 - Trip rept of Caseload Forecast Panel site visit re const status review & projected fuel load date.Related info encl. (24 page(s), 8/9/1978)
- ML20080D618 - Corrected trip rept of Caseload Forecast Panel 791119 site visit re const status & schedule & startup test program. (2 page(s), 1/21/1980)
- ML20080D622 - Handwritten graphs & notes re const activities. (4 page(s), 4/14/1983)
- ML20080D631 - Handwritten notes & calculations re const activities & fuel load preparation. (5 page(s), 7/24/1979)
- ML20080D638 - Handwritten notes & calculations re const activities. (5 page(s), 10/31/1982)
- ML20080D641 - Handwritten calculations & graphs re const activities & preoperational & acceptance testing.Related info encl. (6 page(s), 9/16/1981)
- ML20080D644 - Handwritten notes & calculations re const activities & fuel load preparation. (4 page(s), 5/8/1980)
- ML20080D651 - Handwritten notes & calculations re const activities & fuel load preparation. (7 page(s), 2/27/1979)
- ML20080D656 - Trip rept of Caseload Forecast Panel 820811-13 site visits re status of const & preoperational testing evaluation. Related info encl. (5 page(s), 8/19/1982)
- ML20080D659 - Handwritten notes & calculations re const activities & fuel load date projection.Related info encl. (5 page(s), 9/26/1978)
- ML20080D665 - Trip rept of 780405-06 site visits re const schedule.Related info encl. (7 page(s), 8/9/1978)
- ML20080D685 - "Midland Startup Sequence." Related info encl. (23 page(s), 10/31/1983)
- ML20080D689 - Handwritten calculations & graphs re const schedule. (2 page(s), 10/31/1983)
- ML20080D761 - Handwritten notes & calculations re const schedule & fuel load preparation.Related info encl. (5 page(s), 10/15/1979)
- ML20080D771 - Handwritten graph re const schedule. (1 page(s), 5/26/1983)
- ML20080D780 - Handwritten calculations re const activities & schedule. (1 page(s), 5/16/1979)
- ML20080D790 - Handwritten notes,calculations & graphs re const activities & fuel load date preparation. (11 page(s), 9/19/1978)
- ML20080D794 - Trip rept of 780504-05 site visits re const scheduling & preoperational testing & const status observation.Related info encl. (4 page(s), 8/22/1978)
- ML20080D803 - Handwritten graph & calculations re preoperational testing & const activities. (4 page(s), 5/17/1983)
- ML20080D818 - Requests comments on encl draft rept of Caseload Forecast Panel 810113-15 site visits re facility const status. (8 page(s), 1/27/1981)
- ML20080D825 - Trip rept of Caseload Forecast Panel 790925 site visit to review & discuss const progress.Related info encl. (3 page(s), 11/30/1979)
- ML20080D886 - Handwritten notes & calculations re const activities.Related info encl. (3 page(s), 10/31/1980)
- ML20080D931 - Trip rept of Caseload Forecast Panel 780613-15 site visits re const status assessment & projected completion date evaluation.Related info encl. (6 page(s), 9/28/1978)
- ML20080D969 - Handwritten notes re estimated & official fuel load date. (1 page(s), 10/19/1981)
- ML20080D983 - Trip rept of Caseload Forecast Panel 800226 site visits re factors affecting const schedule & const activity observation.Related info encl. (6 page(s), 4/24/1980)
- ML20080D997 - Handwritten graph & calculations re const activities. (3 page(s), 9/1/1982)
- ML20080E014 - Handwritten notes & calculations re const activities & fuel load preparation. (6 page(s), 2/24/1981)