Home > NRC Library > ADAMS Public Documents
Responds to FOIA request for daily staff notes for 820111-0217.Forwards App A documents.Documents being placed in PDR.App B documents partially withheld (ref FOIA Exemption 5).
Accession Number: ML082340286
Date Released: Thursday, October 24, 2024
Package Contents
The following links on this page are to Adobe Portable Document Format (PDF) files. To obtain a free viewer for displaying this format, see our Plugins, Viewers, and Other Tools.
- ML082340285 - Responds to FOIA request for daily staff notes for 820111-0217.Forwards App A documents.Documents being placed in PDR.App B documents partially withheld (ref FOIA Exemption 5). (4 page(s), 2/10/1986)
- ML20154R762 - Submits daily staff notes for 820120.Lawrence,Ks passed ordinance prohibiting transprotation of certain types of radioactive matls through city limits. (1 page(s), 1/21/1982)
- ML20154R732 - Submits daily staff notes for 820115.Advises of NRC/INPO Info Exchange 820119 meeting in Bethesda,MD.Various PNOs issued. (1 page(s), 1/18/1982)
- ML20154S216 - Partially withheld daily staff notes for 820126.Enforcement conference scheduled for 820128 w/Boston Edison Co to discuss 820118 enforcement action. (2 page(s), 1/27/1982)
- ML20154S111 - Submits daily staff notes for 820202.PNO issued to RE Ginna re steam generator tube repture. (1 page(s), 2/3/1982)
- ML20154S144 - Submits addendum to daily staff notes for 820216.On 820216, 5% power OL issued for San Onofre Unit 2. (1 page(s), 2/17/1982)
- ML20154S132 - Submits daily staff notes for 820208.Ruptured tube in Ginna steam generator inspected using fiber optics.Ruptured tube being plugged.Fiber optics will be used to inspect ruptured tube from secondary side. (3 page(s), 2/9/1982)
- ML20154R770 - Submits daily staff notes for 820122.Advises of 820125 meeting w/INPO in Bethesda,MD.PNO issued to Dairyland Power Cooperative re palnt scram w/loss of offsite power. (1 page(s), 1/25/1982)
- ML20154R736 - Submits daily staff notes for 820118.PNO issued re reported inventory difference at NFS Erwin,TN. (1 page(s), 1/19/1982)
- ML20154R781 - Submits daily staff notes for 850125.Advises of media interest in seismic activities on 820120 60 miles east/north east of Arkansas plant.Seismic monitoring equipment not activited. (1 page(s), 1/26/1982)
- ML20154S221 - Partially withheld daily staff notes for 820211.GPU held press conference to discuss status of & plans for correcting corrosion problem w/steam generator tubes.Util evaluating two repair methods. (3 page(s), 2/12/1982)
- ML20154S140 - Submits daily staff notes for 820210.Advises of 820216 meeting w/Honeywell in Bethesda,MD to discuss SPDS & emergency response. (2 page(s), 2/11/1982)
- ML082340287 - Partially withheld daily staff notes for 820216.Commissioner Roberts & Region II,Director,Div of Engineering & Technical Programs will tour Oconee Nuclear Station to review plant operations & steam generator repair activities. (2 page(s), 2/17/1982)
- ML20154S125 - Submits daily staff notes for 820205.Ruptured tube in Ginna steam generator inspected in May 1981.ECT results showed 20% penetration 3 to 6 inches above tubesheet.No sludge pile located in area. (1 page(s), 2/8/1982)
- ML20154R828 - Submits daily staff notes for 820127.Summarizes 820127 meeting w/Region IV & Houston Lighting & Power Co re transition of AE & contractor & Region IV Special Insp Program. (1 page(s), 1/28/1982)
- ML20154R837 - Submits daily staff notes for 820128.WS Lee elected chairman of board & chief executive officer of Duke Power Co.On 820129,Region III & NRR will meet w/Illinois Power Co to discuss development of QA program. (1 page(s), 1/29/1982)
- ML20154S098 - Submits daily staff notes for 820129.Advises of 820208,09, & 10 meetings in Bethesda,MD re CRBR. (1 page(s), 2/1/1982)
- ML20154S212 - Partially withheld staff notes for 820121.On 820120,ASLB held hearings to discuss emergency planning at VC Summer. Record closed on all contentions.Decision date projected in Bevill schedule is Apr 1982. (3 page(s), 1/22/1982)
- ML20154S104 - Submits daily staff notes for 820201.JG Keppler will testify on 820202 in Midland,MI before ASLB re soil settlement at Midland const site.Advises of 820203 meeting w/PG&E in Bethesda,MD re 811204 submittal. (2 page(s), 2/2/1982)
- ML20154R722 - Submits daily staff notes for 820113-14.On 820115,Region III will conduct briefing & tour Perry for state of OH Representative B Bonanno. (1 page(s), 1/15/1982)
- ML20154R709 - Submits daily staff notes for 820112.Region III met w/CPC to review recent changes to QA organization at Mid land const site & ongoing soil settlement.PNOs issued to TVA re reactor trip & safety injection. (1 page(s), 1/13/1982)
- ML20154S120 - Submits daily staff notes for 820204.PNO issued to Florida Power & Light re alleged onsite use of drugs. (1 page(s), 2/5/1982)
- ML20154S203 - Submits daily staff notes for 820217.On 820218,Region III will meet w/ACRS subcommittee in Cincinnati,OH to review findings of investigation into QA problems at Zimmer & status of quality confirmation program for completed work. (1 page(s), 2/18/1982)
- ML20154S226 - Partially withheld daily staff notes for 820212.IE issued Enforcement Notice EN-82-03 for licensees not meeting 820201 date for completion of prompt public notification sys. (2 page(s), 2/16/1982)
- ML20154S136 - Submits daily staff notes for 820209.On 820209,Region II conducted enforcement conference w/Florida Power & Light Co re welding problems at ST Lucie 2.Region V mobile lab will be used to conduct special insp re measurement techniques. (1 page(s), 2/10/1982)
- ML20154S117 - Submits daily staff notice for 820203.Duke Power Co formally withdrew CP application for Perkins Nuclear Plant.Region III & IE will meet w/Comm ED on 820204 re findings on drug use at Zion Nuclear Power Statim. (2 page(s), 2/4/1982)
- ML20154R749 - Submits daily staff notes for 820119.During Dec 1981, Operator Licensing Branch issued 36 new reactor operator & 16 new senior reactor operator licenses.Asian clams found in Loop II of svc water sys at Arkansas. (2 page(s), 1/20/1982)