Home > NRC Library > ADAMS Public Documents
Partial response to FOIA request for documents re Sequoyah pressure transmitter.Forwards App F documents.App F documents also available in PDR.
Accession Number: ML082310192
Date Released: Thursday, October 24, 2024
Package Contents
The following links on this page are to Adobe Portable Document Format (PDF) files. To obtain a free viewer for displaying this format, see our Plugins, Viewers, and Other Tools.
- ML082310316 - Partial response to FOIA request for documents re Sequoyah pressure transmitter.Forwards App F documents.App F documents also available in PDR. (2 page(s), 2/26/1988)
- ML082490196 - Summary of 850228 meeting w/util re power sys concerns. (3 page(s), 3/8/1985)
- ML20147C151 - Annotated ltr forwarding preliminary comments & questions from review of 83-37 & draft. (16 page(s), 3/22/1984)
- ML20147D318 - Forwards 851015 meeting notes between BD Liaw & H Myers. Package includes chronology of TVA welding issues.Chronology annotated w/Myers comments & questions on various aspects of issues. (1 page(s), 10/18/1985)
- ML082490188 - Summary of 840907 meeting w/util & Westinghouse re Tech Specs.Util requested to respond to Questions 2b,3a,3b,4a,4b, 4c,4d,6a,6b,8a,9,11,13,17a,17b,18,25,27 & 28 of NRC 840822 ltr. (110 page(s), 9/12/1984)
- ML20147C164 - Forwards final statements of work & mod for FIN A-6819, "Evaluation of Selected NRC Items Before Plant Fuel Load." (1 page(s), 10/5/1984)
- ML082310321 - Notification of 840829 meeting w/util in Bethesda,MD to discuss App R requirements,per intervening combustibles & sprinkler sys at Units 1 & 2. (1 page(s), 8/22/1984)
- ML082490191 - Notification of 841114 meeting w/util in Bethesda,MD to discuss util 841015 fire protection appeal. (1 page(s), 11/9/1984)
- ML082490236 - Notification of 850228 meeting w/TVA in Bethesda,MD to discuss resolution of concerns raised by power sys branch. (1 page(s), 2/27/1985)
- ML082310318 - Forwards list prepared by plant project manager of meetings NRR held w/TVA onsite from Jan 1984 to present,per 850318 request.List of meetings w/TVA on other listed sites also encl.Meeting summaries also provided. (1 page(s), 3/20/1985)
- ML082310320 - Summary of 840329 meeting w/TVA & NRC re TVA proposed changes to nuclear safety review board.List of attendees & agenda encl. (5 page(s), 4/11/1984)
- ML20147C834 - Summary of 841213 meeting w/TVA re stability-related aspects of single loop operation. (8 page(s), 12/13/1984)
- ML082490189 - Summary of 840905 meeting w/util & INEL re environ equipment qualification program.List of attendees & list of specific concerns resulting from review encl.Applicant committed to respond by 841001. (10 page(s), 9/12/1984)
- ML20147C644 - Forwards list of meetings NRR held w/TVA on plant from Jan 1984 to present.Handwritten trip rept of 840307 meeting at util re analog transmitter malfunctions encl. (6 page(s), 3/19/1985)
- ML20147D261 - Forwards info re requirements of AWS D1.1 & 10CFR50,App B concerning steel welds at plant. (11 page(s), 6/12/1985)
- ML20149B807 - Discusses Myers 850514 ltr containing questions re Chairman Palladino 850510 ltr to Congressman Udall on pressure transmitters used at facilities.Answer to Item 5.B re when util mgt became aware of nonconformance repts encl. (32 page(s), 7/15/1985)
- ML082310322 - Notification of 840905 meeting w/util in Bethesda,MD to discuss resolution of open items resulting from review of environ qualification of equipment rept at Units 1 & 2. (1 page(s), 9/5/1984)
- ML082310323 - Notification of 850305 meeting w/util in Silver Spring,MD to discuss compensatory measures for plants physical security plans.Agenda & viewgraphs encl. (46 page(s), 3/5/1985)
- ML082310194 - Notification of 850308 meeting w/util in Bethesda,MD to discuss util responses on hydrogen & main steam line break issues. (1 page(s), 3/7/1985)
- ML20147C663 - Forwards regional trip rept outlining plant interim post- accident sampling sys.Licensee representatives appear to understand NRC position re need for improvements in sys. (1 page(s), 6/13/1984)
- ML082310324 - Submits notes on 851017 meeting w/H Myers re welding problems experienced at plant & NRC response to problems. Chronology of TVA weld issues developed by H Myers encl. (23 page(s), 10/17/1985)
- ML082310191 - Notification of 840409 meeting w/util & Black & Veatch in Bethesda,MD to discuss findings & conclusions re independent design review. (2 page(s), 3/23/1984)
- ML082490234 - Notification of 840913 meeting w/util in Bethesda,MD to discuss criteria to be used in modifying fire protection sys at Units 1 & 2. (5 page(s), 9/12/1984)
- ML082310319 - Forwards list of meetings w/TVA on listed plants,per request.List provides meeting subj & meeting summary date. (2 page(s), 3/20/1985)
- ML082490235 - Summary of 840829 meeting w/TVA to discuss concerns raised as result of 840716-20 fire protection audit at Units 1 & 2. (31 page(s), 10/3/1984)
- ML082490195 - Notification of 850307 meeting w/util in Bethesda,MD to discuss NRC position re installation of Tcold parameter in auxiliary control room. (1 page(s), 3/6/1985)