Home > NRC Library > ADAMS Public Documents
Report to the Library of Congress, 04/08 & 05/08 - ACRS.
Accession Number: ML080701054
Date Released: Friday, September 5, 2008
Package Contents
The following links on this page are to Adobe Portable Document Format (PDF) files. To obtain a free viewer for displaying this format, see our Plugins, Viewers, and Other Tools.
- ML081710295 - ACRS Committee and Consultant Report 04/08 & 05/08. (6 page(s), 7/22/2008)
- ML081280129 - Summary Report - 551st Meeting of the Advisory Committee on Reactor Safeguards, April 10-12, 2008, and Other Related Activities of the Committee (6 page(s), 5/7/2008)
- ML081050636 - Digital Instrumentation and Control Systems Interim Staff Guidance (5 page(s), 4/29/2008)
- ML081050422 - Hope Creek Generating Station Extended Power Uprate Application (6 page(s), 5/2/2008)
- ML081120305 - Response to Your April 7, 2008 Letter Regarding State-of-the-Art Reactor Consequences Analyses (SOARCA) Project (2 page(s), 4/21/2008)
- ML081140067 - Proposed Regulatory Guides/Withdrawal of Certain Regulatory Guides. (3 page(s), 4/23/2008)
- ML081150118 - Regulatory Guide 1.210, "Qualification of Safety-Related Battery Chargers, and Inverters for Nuclear Power Plants," Considered During 551st ACRS Meeting, but Not Reviewed. (2 page(s), 4/23/2008)
- ML081150091 - Proposed Stretch Power Uprate to Millstone Power Station, Unit 3. (1 page(s), 4/23/2008)
- ML081150104 - ACRS Review of Power Uprates. (3 page(s), 4/23/2008)
- ML081480487 - Summary Report - 552nd Meeting of the Advisory Committee on Reactor Safeguards, May 8-10, 2008, and Other Related Activities of the Committee (6 page(s), 6/10/2008)
- ML081330429 - Draft Report NUREG/CR-6962, "Approaches for Using Traditional Probabilistic Risk Assessment Methods for Digital Systems," and Related Matters (3 page(s), 5/19/2008)
- ML081330474 - PHEBUS Fission Product (PHEBUS-FP) Program (3 page(s), 5/30/2008)
- ML081330447 - Interim Letter 3: Chapters 4, 6, 15, 18, and 21 of the NRC Staff's Safety Evaluation Report with Open Items Related to the Certification of the ESBWR Design (7 page(s), 5/23/2008)
- ML081330434 - Response to the January 17, 2008, EDO Letter Regarding Susquehanna Steam Electric Station Units 1 and 2 Extended Power Uprate (3 page(s), 6/3/2008)
- ML081330356 - Multiple Draft Regulatory Guides to be Issued as Final. (2 page(s), 5/15/2008)
- ML081330531 - Withdrawal of Regulatory Guide 3.42. (2 page(s), 5/15/2008)
- ML081330459 - Draft Regulatory Guides 1178, 1190, 1198, and 1200. (2 page(s), 5/15/2008)
- ML081330408 - Draft Regulatory Guides 3024 and 3033. (2 page(s), 5/15/2008)