Home > NRC Library > ADAMS Public Documents
Duane Arnold Dec 2007 Initial Exam.
Accession Number: ML080230602
Date Released: Wednesday, July 29, 2009
Package Contents
The following links on this page are to Adobe Portable Document Format (PDF) files. To obtain a free viewer for displaying this format, see our Plugins, Viewers, and Other Tools.
- ML080230606 - SRO/RO Written Initial Examination for the Duane Arnold - December 2007. (80 page(s), 12/17/2007)
- ML080380321 - ER 05000331/2007301(DRS); 12/10/2007 - 12/14/2007; FPL Energy Duane Arnold, LLC, Duane Arnold Energy Center, Initial License Examination Report. (11 page(s), 1/31/2008)
- ML081420441 - Final As-Administered Administrative JPMS for the Duane Arnold Initial Examination - December 2007, "Generate a Fire Impairment for an Appendix R Barrier". (48 page(s), 2/27/2008)
- ML081420467 - Final As-Administered Control Room JPMS for the Duane Arnold Initial Examination - December 2007, "Perform Required Actions for Resetting a Recirc MG Scoop Tube Lockup (Faulted)." (84 page(s), 2/27/2008)
- ML081420496 - Final As-Administered In Plant JPMS for the Duane Arnold Initial Examination - December 2007, "Perform Required Actions for Placing RHR in Torus Cooling from 1C388." (37 page(s), 2/27/2008)
- ML081420538 - Final As-Administered Scenarios for the Duane Arnold Initial Examination - December 2007, Appendix D Scenario Outline. (47 page(s), 2/27/2008)
- ML081420549 - Proposed Administrative JPMS for the Duane Arnold Initial Examination - December 2007, "Generate a Fire Impairment for an Appendix R Barrier." (47 page(s), 2/27/2008)
- ML081420555 - Proposed Control Room JPMS for the Duane Arnold Initial Examination - December 2007, "Perform Required Actions for Resetting a Recirc MG Scoop Tube Lockup (Faulted)". (84 page(s), 2/27/2008)
- ML081420559 - Proposed In-Plant JPMs for the Duane Arnold Initial Examination - December 2007, "Perform Required Actions for Placing RHR in Torus Cooling from 1C388". (37 page(s), 2/27/2008)
- ML081420563 - Proposed Scenarios for the Duane Arnold Initial Examination - December 2007, "Examination Scenario Guide (ESG)". (74 page(s), 2/27/2008)
- ML081420568 - Proposed Written Exam for the Duane Arnold Initial Examination - December 2007. (108 page(s), 2/27/2008)
- ML081910293 - Examination Outline Submittal and Comments for the Duane Arnold Energy Center Initial Examination December 2007. (23 page(s), 12/10/2007)
- ML081910301 - Proposed Examination Cover Letter and Checklists for the Duane Arnold Energy Center Initial Examination December 2007. (9 page(s), 12/10/2007)
- ML081910313 - NRC Comments to the Proposed Written Examination, ES-401-9 for the Duane Arnold Energy Center Initial Examination December 2007. (7 page(s), 12/10/2007)
- ML081910322 - Miscellaneous Correspondence for the Duane Arnold Energy Center Initial Examination December 2007. (15 page(s), 12/10/2007)
- ML081910325 - Facility Post-Examination Comments for the Duane Arnold Energy Center Initial Examination December 2007. (2 page(s), 12/10/2007)
- ML081910332 - Exam Changes Requested by NRC and Incorporated into the December 2007 Operating Exam for the Duane Arnold Energy Center Initial Examination December 2007. (3 page(s), 12/10/2007)
- ML082660503 - Various Checklists for The Duane Arnold Energy Center Initial Examination December 2007. (19 page(s), 12/10/2007)