Home > NRC Library > ADAMS Public Documents
Forwards listed DOE/weld evaluation project group closure statement evaluation repts on welding.Repts not finally approved for closure by DOE/weld evaluation project.
Accession Number: ML073540709
Date Released: Sunday, June 1, 2008
Package Contents
The following links on this page are to Adobe Portable Document Format (PDF) files. To obtain a free viewer for displaying this format, see our Plugins, Viewers, and Other Tools.
- ML073540708 - Forwards listed DOE/weld evaluation project group closure statement evaluation repts on welding.Repts not finally approved for closure by DOE/weld evaluation project. (2 page(s), 1/20/1987)
- ML073540710 - Rev 0 to Employee Concern Group Closure EC-SP-1, "Cracked Welds in Unit-1 Pipe Whip Restraints in North Valve Room." (3 page(s), 11/21/1986)
- ML073540711 - Rev 0 to Employee Concern Group Closure EC-SP-5, "Non-Vendor Welds in Safety-Related Sys Buried Below Unit 1 Reactor Bldg." (3 page(s), 11/19/1986)
- ML073540712 - Rev 0 to Employee Concern Group Closure EC-SP-7, "18-Inch Carbon Steel Pipe Located in Reactor Bldg at 713-Ft Elevation Near Personnel/Equipment Hatch." (3 page(s), 11/20/1986)
- ML073540713 - Rev 0 to Quality Indicator Group Closure QI-SP-3, "Improper Signatures on NDE Repts for Visual Exam (VT) & Penetrant Exam (PT)." (3 page(s), 11/21/1986)
- ML073540714 - Rev 0 to Quality Indicator Group Closure QI-SP-14, "ANSI B31.1 Pressure Test Used in Lieu of ASME Section III Hydro Test on Reworked Pipe Welds." (3 page(s), 11/25/1986)
- ML073540715 - Rev 0 to Quality Indicator Group Closure QI-SP-15, "Suspect Weld on Diesel Air Dryer,Dryer 1A-1." (2 page(s), 11/22/1986)