Home > NRC Library > ADAMS Public Documents
"Technical Evaluation Rept on IPE Front-End Submittal," dtd 940907.
Accession Number: ML073230698
Date Released: Monday, September 1, 2008
Package Contents
The following links on this page are to Adobe Portable Document Format (PDF) files. To obtain a free viewer for displaying this format, see our Plugins, Viewers, and Other Tools.
- ML082320705 - "Technical Evaluation Rept on IPE Front-End Submittal," dtd 940907. (56 page(s), 9/7/1994)
- ML082320706 - "Step 1 Technical Evaluation Rept of Watts Bar Unit 1, IPE Back End Submittal," dtd 930402. (21 page(s), 4/2/1993)
- ML082320707 - "Technical Evaluation Rept of (Initial) IPE Submittal Human Reliability Analysis,Final Rept," dtd 940731. (27 page(s), 7/31/1994)
- ML073230696 - Forwards staff evaluation of util 920901 response to GL 88-20, "IPE for Severe Accident Vulnerabilities." Concludes that util meets intent of GL 88-20.Technical evaluation repts encl. (27 page(s), 10/5/1994)