Summary of June 27, 2007, Public Meeting Regarding FENOC's Re-analysis of the Time Line and Root Causes for the 2002 Davis-Besse Reactor Pressure Vessel Head Degradation Event.
Accession Number: ML072070184
Date Released: Wednesday, August 15, 2007
Package Contents
The following links on this page are to Adobe Portable Document Format (PDF) files. To obtain a free viewer for displaying this format, see our Plugins, Viewers, and Other Tools.
- ML072070145 - Summary of June 27, 2007, Public Meeting Regarding FENOC's Re-analysis of the Time Line and Root Causes for the 2002 Davis-Besse Reactor Pressure Vessel Head Degradation Event. (12 page(s), 8/7/2007)
- ML071710346 - 06/27/2007 Revised Notice of Meeting with FirstEnergy to Discuss Response to NRC's 05/14/2007, Demand for Information Regarding FENOC's Re-analysis of the Timeline and Root Causes for the 2002 Davis-Besse Reactor Pressure Vessel Head Degradation Event. (9 page(s), 6/21/2007)
- ML071790596 - 06/27/2007 Slides from Public Meeting between NRC and FENOC Regarding Response to May 14, 2007, Demand for Information. (24 page(s), 6/27/2007)
- ML071240254 - Assessment of Exponent Report Project Number BN63097.001, "Review & Analyses of The Davis-Besse March 2002 Reactor Pressure Vessel Head Wastage Event," To Ensure Current Reactor Pressure Vessel Head Inspection Requirements Are Adequate To Prevent.... (9 page(s), 5/4/2007)
- ML071340333 - First Energy Nuclear Operating Company (FENOC) {Davis-Besse Nuclear Power Plant; Perry Nuclear Power Plant; Beaver Valley Nuclear Plant, Units 1 and 2} - Demand for Information. (7 page(s), 5/14/2007)
- ML071340325 - Anthony Alexander Ltr. re: Order Demand for Information (DFI). (5 page(s), 5/14/2007)
- ML071640480 - Cynthia Carpenter Ltr. re: Response to Demand for Information (DFI). (63 page(s), 6/13/2007)