Vogtle ESP SER
Accession Number: ML071581032
Date Released: Friday, September 14, 2007
Package Contents
The following links on this page are to Adobe Portable Document Format (PDF) files. To obtain a free viewer for displaying this format, see our Plugins, Viewers, and Other Tools.
- ML072400469 - Letter, Vogtle Safety Evaluation Report for the Vogtle Early Site Permit Application. (7 page(s), 8/30/2007)
- ML072250471 - Vogtle Early Site Permit Safety Evaluation Report, Abstract, Table of Contents, Appendices, Figures, Tables. and Executive Summary. (27 page(s), 8/30/2007)
- ML071800270 - Vogtle Early Site Permit Safety Evaluation Report, 2.0 Site Characteristics, Sections 2.1 - 2.3. (86 page(s), 8/30/2007)
- ML072040363 - Vogtle Early Site Permit Safety Evaluation Report, Section 2.4, Hydrologic Engineering. (85 page(s), 8/30/2007)
- ML072010363 - Vogtle Early Site Permit Safety Evaluation Report, Part 1 to Section 2.5, Geology, Seismology, and Geotechnical Engineering - Continue. (181 page(s), 8/30/2007)
- ML072010274 - Vogtle Early Site Permit Safety Evaluation Report, Part 2 to Section 2.5, Geology, Seismology, and Geotechnical Engineering - End. (51 page(s), 8/30/2007)
- ML071580992 - Vogtle Early Site Permit Safety Evaluation Report, 3.0 Site Safety Assessment, Section 3.5.1.6, Aircraft Hazards. (4 page(s), 8/30/2007)
- ML071770255 - Vogtle Early Site Permit Safety Evaluation Report, 11.0 Radiological Effluent Release Dose Consequences from Normal Operations. (7 page(s), 8/30/2007)
- ML071970283 - Vogtle Early Site Permit Safety Evaluation Report, 13.0 Conduct of Operations. (147 page(s), 8/30/2007)
- ML071580614 - Vogtle Early Site Permit Safety Evaluation Report, 15.0 Accident Analysis. (5 page(s), 8/30/2007)
- ML071580636 - Vogtle Early Site Permit Safety Evaluation Report, 17.0 Early Site Permit Quality Assurance Measures. (42 page(s), 8/30/2007)
- ML072250593 - Vogtle Early Site Permit Safety Evaluation Report, 18.0 Review By the Advisory Committee on Reactor Safeguards. (1 page(s), 8/30/2007)
- ML072250595 - Vogtle Early Site Permit Safety Evaluation Report, 19.0 Conclusions. (1 page(s), 8/30/2007)
- ML072260173 - Vogtle Early Site Permit Safety Evaluation Report, Appendix A, Permit Conditions, COL Action Items, Site Characteristics, Bounding Parameters, and Inspections, Tests, Analyses, and Acceptance Criteria Tables. (55 page(s), 8/30/2007)
- ML072220065 - Vogtle Early Site Permit Safety Evaluation Report, Appendix B, Chronology. (24 page(s), 8/30/2007)
- ML072220271 - Vogtle Early Site Permit Safety Evaluation Report, Appendix C, References. (22 page(s), 8/30/2007)
- ML072250444 - Vogtle Early Site Permit Safety Evaluation Report, Appendix D, Principal Contributors. (1 page(s), 8/30/2007)