Home > NRC Library > ADAMS Public Documents
Diablo Canyon Power Plant, Unit No. 1, License Amendment, Issuance of Exigent Amendment No. 190 Re: Revision to TS Section 3.8.4, "DC Sources - Operating" to Extend the Completion Time to Restore an Inoperable Station Battery (TAC MD3334).
Accession Number: ML063140004
Date Released: Thursday, November 23, 2006
Package Contents
The following links on this page are to Adobe Portable Document Format (PDF) files. To obtain a free viewer for displaying this format, see our Plugins, Viewers, and Other Tools.
- ML063140003 - Diablo Canyon Power Plant, Unit No. 1, License Amendment, Issuance of Exigent Amendment No. 190 Re: Revision to TS Section 3.8.4, "DC Sources - Operating" to Extend the Completion Time to Restore an Inoperable Station Battery (TAC MD3334). (21 page(s), 11/15/2006)
- ML063190540 - Diablo Canyon Power Plant, Unit No. 1, Technical Specifications, Issuance of Exigent Amendment No. 190 Re: Revision to TS Section 3.8.4, "DC Sources - Operating" to Extend the Completion Time to Restore an Inoperable Station Battery (TAC MD3334). (3 page(s), 11/15/2006)