Home > NRC Library > ADAMS Public Documents
Docketing of Additional Information Pertaining to License Renewal Application of the Vermont Yankee Power Station (Tac No. MC9668)
Accession Number: ML060950189
Date Released: Monday, November 20, 2006
Package Contents
The following links on this page are to Adobe Portable Document Format (PDF) files. To obtain a free viewer for displaying this format, see our Plugins, Viewers, and Other Tools.
- ML060950195 - 2006/03/22-GALL AMP: Plant-Specific (Audit Worksheet - GALL Report AMP). (8 page(s), 3/22/2006)
- ML060950215 - 2006/03/22-GALL AMP: X.E1. Environmental Qualification (EQ) of Electric Components (Audit Worksheet GALL Report AMP). (10 page(s), 3/22/2006)
- ML060950218 - 2006/03/22-GALL AMP: X.M1, Metal Fatigue of Reactor Coolant Pressure Boundary (Audit Worksheet, GALL Report AMP). (6 page(s), 3/22/2006)
- ML060950220 - 2006/03/22-GALL AMP: X.S1, Concrete Containment Tendon Prestress (Audit Worksheet GALL Report AMP). (5 page(s), 3/22/2006)
- ML060950224 - 2006/03/22-GALL AMP: XI.E1, Electrical Cables and Connections Not Subject to 10 CFR 50.49 Environmental Qualification Requirements (Audit Worksheet GALL Report AMP). (6 page(s), 3/22/2006)
- ML060950235 - 2006/03/22-GALL AMP: XI.E2, Electrical Cables and Connections Not Subject to 10 CFR 50.49 Environmental Qualification Requirements Used in Instrumentation Circuits (Audit Worksheet GALL Report AMP) (7 page(s), 3/22/2006)
- ML060950250 - 2006/03/22-GALL AMP: XI.E3, Inaccessible Medium-Voltage Cables Not Subject to 10 CFR 50.49 Environmental Qualification Requirements (Audit Worksheet GALL Report AMP). (9 page(s), 3/22/2006)
- ML060950258 - 2006/03/22-GALL AMP: XI.E4, Metal Enclosed Bus (Audit Worksheet GALL Report AMP). (10 page(s), 3/22/2006)
- ML060950262 - 2006/03/22-GALL AMP: XI.E5, Fuse Holder (Audit Worksheet GALL Report AMP). (5 page(s), 3/22/2006)
- ML060950269 - 2006/03/22-GALL AMP: XI.E6, Electrical Cable Connections Not Subject to 10 CFR 50.49 Environmental Qualification Requirements (Audit Worksheet, GALL Report AMP). (8 page(s), 3/22/2006)
- ML060950271 - 2006/03/22-GALL AMP: XI.M1, ASME Section XI Inservice Inspection, Subsections IWB, IWC, and IWD (Audit Worksheet, GALL Report AMP) (5 page(s), 3/22/2006)
- ML060950277 - 2006/03/22-GALL AMP: XI.M2, Water Chemistry (Audit Worksheet, GALL Report AMP). (8 page(s), 3/22/2006)
- ML060950279 - 2006/03/22-GALL AMP: XI.M3, Reactor Head Closure Studs (Audit Worksheet, GALL Report AMP). (3 page(s), 3/22/2006)
- ML060950284 - 2006/03/22-GALL AMP: XI.M4, BWR Vessel ID Attachment Welds (Audit Worksheet GALL Report AMP). (7 page(s), 3/22/2006)
- ML060950290 - 2006/03/22-GALL AMP: XI.M5, BWR Feedwater Nozzle (Audit Worksheet, GALL Report AMP) (6 page(s), 3/22/2006)
- ML060950301 - 2006/03/22-GALL AMP: XI.M6, BWR Control Rod Drive Return Line Nozzle (Audit Worksheet GALL Report AMP). (4 page(s), 3/22/2006)
- ML060950311 - 2006/03/22-GALL AMP: XI.M7, BWR Stress Corrosion Cracking (Audit Worksheet GALL Report AMP). (5 page(s), 3/22/2006)
- ML060950323 - 2006/03/22-GALL AMP: XI.M8, BWR Penetrations (Audit Worksheet, GALL Report AMP). (8 page(s), 3/22/2006)
- ML060950328 - 2006/03/22-GALL AMP: XI.M9, BWR Vessels Internals (Audit Worksheet GALL Report AMP). (7 page(s), 3/22/2006)
- ML060950331 - 2006/03/22-GALL AMP: XI.M10, Boric Acid Corrosion (Audit Worksheet GALL Report AMP). (6 page(s), 3/22/2006)
- ML060950347 - 2006/03/22-GALL AMP: XI.M11A, Nickel Alloy Penetration Nozzles Welded to the Upper Reactor Vessel Closure Heads of Pressurized Water Reactors. (10 page(s), 3/22/2006)
- ML060950351 - 2006/03/22-GALL AMP: XI.M12, Thermal Aging Embrittlement of Cast Austenitic Stainless Steel (CASS) (Audit Worksheet GALL Report AMP). (6 page(s), 2/28/1998)
- ML060950356 - 2006/03/22-GALL AMP: XI.M13, Thermal Aging and Neutron Irradiation Embrittlement of Cast Austenitic Stainless Steel (CASS) (Audit Worksheet GALL Report AMP). (6 page(s), 3/22/2006)
- ML060950364 - 2006/03/22-GALL AMP: XI.M14, Loose Part Monitoring (Audit Worksheet GALL Report AMP). (6 page(s), 3/22/2006)
- ML060950370 - 2006/03/22-GALL AMP: XI.M15, Neutron Noise Monitoring (Audit Worksheet GALL Report AMP). (10 page(s), 3/22/2006)
- ML060950372 - 2006/03/22-GALL AMP: XI.M16, PWR Vessel Internals (Audit Worksheet GALL Report AMP). (5 page(s), 3/22/2006)
- ML060950375 - 2006/03/22-GALL AMP: XI.M17, Flow-Accelerated Corrosion (Audit Worksheet GALL Report AMP). (6 page(s), 3/22/2006)
- ML060950540 - 2006/03/22-GALL AMP: XI.M18, Bolting Integrity (Audit Worksheet GALL Report AMP). (6 page(s), 3/22/2006)
- ML060950549 - 2006/03/22-GALL AMP: XI.M19, Steam Generator Tube Integrity (Audit Worksheet GALL Report AMP). (8 page(s), 3/22/2006)
- ML060950559 - 2006/03/22-GALL AMP: XI.M20, Open-Cycle Cooling Water System (Audit Worksheet GALL Report AMP). (5 page(s), 3/22/2006)
- ML060950567 - 2006/03/22-GALL AMP: XI.M21, Closed-Cycle Cooling Water System (Audit Worksheet GALL Report AMP). (6 page(s), 3/22/2006)
- ML060950570 - 2006/03/22-GALL AMP: XI.M22, Boraflex Monitoring (Audit Worksheet GALL Report AMP). (5 page(s), 3/22/2006)
- ML060950573 - 2006/03/22-GALL AMP: XI.M23, Inspection of Overhead Heavy Load and Light Load (Related to Refueling) Handling Systems (Audit Worksheet GALL Report AMP). (5 page(s), 3/22/2006)
- ML060950579 - 2006/03/22-GALL AMP: XI.M24, Compressed Air Monitoring (Audit Worksheet GALL Report AMP). (8 page(s), 3/22/2006)
- ML060950582 - 2006/03/22-GALL AMP: XI.M25, BWR Reactor Water Cleanup System (Audit Worksheet GALL Report AMP). (8 page(s), 3/22/2006)
- ML060950587 - 2006/03/22-GALL AMP: XI.M26, Fire Protection (Audit Worksheet GALL Report AMP). (6 page(s), 3/22/2006)
- ML060950596 - 2006/03/22-GALL AMP: XI.M27, Fire Water System (Audit Worksheet GALL Report AMP). (5 page(s), 3/22/2006)
- ML060950606 - 2006/03/22-GALL AMP: XI.M28, Buried Piping and Tanks Surveillance (Audit Worksheet GALL Report AMP). (5 page(s), 3/22/2006)
- ML060950610 - 2006/03/22-GALL AMP: XI.M29, Aboveground Steel Tanks (Audit Worksheet GALL Report AMP). (5 page(s), 3/22/2006)
- ML060950620 - 2006/03/22-GALL AMP: XI.M31, Reactor Vessel Surveillance (Audit Worksheet GALL Report AMP). (10 page(s), 3/22/2006)
- ML060950624 - 2006/03/22-GALL AMP: XI.M32, One-Time Inspection (Audit Worksheet GALL Report AMP). (6 page(s), 3/22/2006)
- ML060950629 - 2006/03/22-GALL AMP: XI.M33, Selective Leaching of Materials (Audit Worksheet GALL Report AMP). (5 page(s), 3/22/2006)
- ML060950632 - 2006/03/22-GALL AMP: XI.M34, Buried Piping and Tanks Inspection (Audit Worksheet GALL Report AMP). (7 page(s), 3/22/2006)
- ML060950634 - 2006/03/22-GALL AMP: XI.M35, One-Time Inspection of ASME Code Class 1 Small Bore Piping (Audit Worksheet GALL Report AMP). (7 page(s), 3/22/2006)
- ML060950637 - 2006/03/22-GALL AMP: XI.M36, External Surfaces Monitoring (Audit Worksheet GALL Report AMP). (5 page(s), 3/22/2006)
- ML060950645 - 2006/03/22-GALL AMP: XI.M37, Flux Thimble Tube Inspection (Audit Worksheet GALL Report AMP). (5 page(s), 3/22/2006)
- ML061000078 - 2006/03/22-GALL AMP: XI.M38, Inspection of Internal Surfaces in Miscellaneous Piping and Ducting Components (Audit Worksheet GALL Report AMP). (5 page(s), 3/22/2006)
- ML061000090 - 2006/03/22-GALL AMP: XI.M39, Lubricating Oil Analysis Program (Audit Worksheet GALL Report AMP). (5 page(s), 3/22/2006)
- ML061000096 - 2006/03/22-GALL AMP: XI.S1, ASME Section XI, Subsection IWE (Audit Worksheet GALL Report AMP). (9 page(s), 3/22/2006)
- ML061000101 - 2006/03/22-GALL AMP: XI.S2, ASME Section XI, Subsection IWL (Audit Worksheet GALL Report AMP). (7 page(s), 3/22/2006)
- ML061000116 - 2006/03/22-GALL AMP: XI.S3, ASME Section XI, Subsection IWF (Audit Worksheet GALL Report AMP). (5 page(s), 3/22/2006)
- ML061000126 - 2006/03/22-GALL AMP: XI.S4, 10 CFR 50, Appendix J (Audit Worksheet GALL Report AMP). (5 page(s), 3/22/2006)
- ML061000134 - 2006/03/22-GALL AMP: XI.S5, Masonry Wall Progam (Audit Worksheet GALL Report AMP). (5 page(s), 3/22/2006)
- ML061000138 - 2006/03/22-GALL AMP: XI.S6, Structures Monitoring Program (Audit Worksheet GALL Report AMP). (6 page(s), 3/22/2006)
- ML061000143 - 2006/03/22-GALL AMP: XI.S7, RG 1.127, Inspection of Water-Control Structures Associated With Nuclear Power Plants (Audit Worksheet GALL Report AMP). (7 page(s), 3/22/2006)
- ML061000147 - 2006/03/22-GALL AMP: XI.S8, Protective Coating Monitoring and Maintenance Program (Audit Worksheet GALL Report AMP). (6 page(s), 3/22/2006)