Home > NRC Library > ADAMS Public Documents
NEI 94-01, Revision 1j, Industry Guideline for Implementing Performance-Based Option of 10 CFR Part 50, Appendix J, and EPRI Report No. 1009325, Revision 1, December 2005, Risk Impact Assessment of Extended Integrated Leak Rate Testing Intervals.
Accession Number: ML053550404
Date Released: Thursday, January 5, 2006
Package Contents
The following links on this page are to Adobe Portable Document Format (PDF) files. To obtain a free viewer for displaying this format, see our Plugins, Viewers, and Other Tools.
- ML053550405 - Dup Transmittal of NEI 94-01, Rev 1j, "Industry Guideline for Implementing Performance-Based Option of 10 CFR Part 50, Appendix J," and EPRI Rpt No. 1009325, Rev 1, December 2005, "Risk Impact Assessment to Extended Integrated Leak Rate Testing Intervals (1 page(s), 12/19/2005)
- ML053550418 - Duplicate of NEI 94-01, Rev 1j, "Nuclear Energy Institute - Industry Guideline for Implementing Performance-Based Option of 10 CFR Part 50, Appendix J" (44 page(s), 12/8/2005)
- ML053550424 - Duplicate of EPRI Report 1009325, Rev 1, "Risk Impact Assessment of Extended Integrated Leak Rate Testing Intervals" (220 page(s), 12/30/2005)