NRC Logo

Home > NRC Library > ADAMS Public Documents

Davis-Besse, Amendment, Revises Technical Specification 3/4/10.2, "Special Test Exceptions - Physics Tests," to Increase Allowed Time Between Flux Channel Channel Functional Tests & Beginning of Mode 2 Physics Tests from 12 to 24 Hours.

Accession Number: ML053330562

Date Released: Tuesday, February 7, 2006

Package Contents

The following links on this page are to Adobe Portable Document Format (PDF) files. To obtain a free viewer for displaying this format, see our Plugins, Viewers, and Other Tools.

Privacy Policy | Site Disclaimer