Home > NRC Library > ADAMS Public Documents
Davis-Besse, Amendment, Revises Technical Specification 3/4/10.2, "Special Test Exceptions - Physics Tests," to Increase Allowed Time Between Flux Channel Channel Functional Tests & Beginning of Mode 2 Physics Tests from 12 to 24 Hours.
Accession Number: ML053330562
Date Released: Tuesday, February 7, 2006
Package Contents
The following links on this page are to Adobe Portable Document Format (PDF) files. To obtain a free viewer for displaying this format, see our Plugins, Viewers, and Other Tools.
- ML053330561 - Davis-Besse, Amendment, Revises Technical Specification 3/4/10.2, "Special Test Exceptions - Physics Tests," to Increase Allowed Time Between Flux Channel Channel Functional Tests & Beginning of Mode 2 Physics Tests from 12 to 24 Hours. (10 page(s), 1/31/2006)
- ML060320072 - Davis-Besse, Technical Specifications, Revises Technical Specification 3/4/10.2, "Special Test Exceptions - Physics Tests," to Increase Allowed Time Between Flux Channel Channel Functional Tests & Beginning of Mode 2 Physics Tests from 12 to 24 Hours. (1 page(s), 1/31/2006)