G20050674 - Ltr from Representative Dennis Kucinich re Effectiveness of Radiological Emergency Response Plans for Nuclear Power Plants.
Accession Number: ML052870489
Date Released: Thursday, December 1, 2005
Package Contents
The following links on this page are to Adobe Portable Document Format (PDF) files. To obtain a free viewer for displaying this format, see our Plugins, Viewers, and Other Tools.
- ML052870483 - G20050674 - Representative Dennis Kucinich ltr. re Effectiveness of Rad Emergency Response Plans for Nuclear Power Plants (1 page(s), 11/1/2005)
- ML053260464 - Enclosure A, Davis-Besse Nuclear Power Station (DBNPS) Emergency Plan, dated February 23, 2004, DBNPS Emergency Plan Implementing Procedure RA-EP-02245, effective June 8, 2005 & DBNPS Emergency Plan Offnormal Occurrence Procedure RA-EP-02870.... (233 page(s), 2/23/2004)
- ML053110427 - Enclosure B, Section 6.0, Emergency Measures, of the Perry Emergency Plan, Page 6-3 of the Perry Evacuation Time Estimate Study Perry Operations Manual Emergency Plan Implementing Instruction, Protective Actions & Guides, dated December 8, 2004.... (61 page(s), 12/8/2004)
- ML053260469 - Enclosure C, Section J, Protective Response, of the Fermi II Radiological Emergency Response Plan, Fermi 2 RERP Plan Implementing Procedure, Protective Action Recommendations, Fermi 2 RERP Plan Implementing Procedure, Assembly & Accountability & Onsite. (42 page(s), 12/14/2004)
- ML053260471 - Enclosure D, Appendix C, Population Distribution & Evacuation Time Estimates, of Palisades Nuclear Plant Site (Palisades) Emergency Plan, Palisades Emergency Implementing Procedure, Protective Action Recommendations for Offsite Populations, dtd 9/19/05. (75 page(s), 9/19/2005)
- ML053260473 - Enclosure E, Section J, Protective Response, of the D.C. Cook Emergency Plan & Emergency Response Procedure PMP-2080-EPP-100, effective June 30, 2005. (49 page(s), 6/22/2005)
- ML053260475 - Enclosure F, Part 6, Emergency Measures, of the Point Beach Nuclear Plant (PBNP) Emergency Plan Manual, dtd March 4, 2004, Appendix J, Evacuation Time Estimates for the Area Surrounding the PBNP, of the PBNP Emergency Plan Manual, dtd August 12, 2005... (62 page(s), 3/4/2004)
- ML053260478 - Enclosure G, Section 6, Emergency Measures, of the Kewaunee Emergency Plan, Appendix H, Evacuation Time Estimates, of the Kewaunee Emergency Plan & Kewaunee Nuclear Power Plant Emergency Plan Implementing Procedure, Determining Protective Action.... (33 page(s), 11/1/2005)
- ML053260480 - Enclosure H, Pages 45-50 of the Ginna Station Emergency Plan, Appendix G, Analysis of Evacuation Travel Times, of the Ginna Station Emergency Plan, and Ginna Station Discretionary Actions for Emergency Conditions, effective April 28, 2005. (57 page(s), 11/1/2005)
- ML053260483 - Enclosure I, Appendix F Evacuation Time Estimates for the James A. FitzPatrick/Nine Mile Point Emergency Planning Zone (Nine Mile Point Nuclear Station and James A. FitzPatrick Nuclear Station are collocated therefore, this evaluation is identical.... (85 page(s), 8/31/2003)
- ML053260487 - Enclosure J, Entergy Nuclear Operations, Inc., James A. FitzPatrick Nuclear Power Plant Emergency Plan Implementing Procedure, Dose Assessment Calculations EAP-4, effective December 3, 2003. (16 page(s), 11/25/2003)