Home > NRC Library > ADAMS Public Documents
03/23/2005, Summary of Meeting with Duke Energy Corp re: McGuire Units 1 & 2 on Measurement Uncertainty Recapture Power Uprate (Tac No. MC6239, MC6240).
Accession Number: ML051010310
Date Released: Monday, April 11, 2005
Package Contents
The following links on this page are to Adobe Portable Document Format (PDF) files. To obtain a free viewer for displaying this format, see our Plugins, Viewers, and Other Tools.
- ML050930029 - 03/23/2005, Summary of Meeting with Duke Energy Corp re: McGuire Units 1 & 2 on Measurement Uncertainty Recapture Power Uprate. (5 page(s), 4/1/2005)
- ML051010314 - 03/23/2005, Attachment 1, ASME Wall Tap Flow Nozzles for MUR Uprate re: Summary of Meeting with Duke Energy Corp on Measurement Uncertainty Recapture Power Uprate (Tac No. MC6239, MC6240). (35 page(s), 4/1/2005)
- ML051010323 - 03/23/2005, Attachment 2, Bill of Material - QA Condition 4, Drawing D-4737-2A,18-900# SCH ASME PIC-6 Primary Feedwater Flow Sectionre: Summary of Meeting with Duke Energy Corp on Measurement Uncertainty Recapture Power Uprate (Tac No. MC6239, MC6240). (1 page(s), 4/1/2005)