FOIA/PA-2004-0362 - Resp 1 - Partial.
Accession Number: ML043020467
Date Released: Monday, October 18, 2004
Package Contents
The following links on this page are to Adobe Portable Document Format (PDF) files. To obtain a free viewer for displaying this format, see our Plugins, Viewers, and Other Tools.
- ML043020475 - FOIA/PA-2004-0362 - Resp 1 - Partial. (5 page(s), 10/7/2004)
- ML041450020 - 2004/05/28-Vermont Yankee - Request for additional information - extended power uprate. (23 page(s), 5/28/2004)
- ML042090103 - 2004/07/02- Vermont Yankee Nuclear Power Station Proposed Technical Specification Change No. 263 Extended Power Uprate - Supplement No. 8 Response to Request for Additional Information. (209 page(s), 7/2/2004)
- ML043020491 - 2004/10/07-Informal staff calculation of risk of losing containment overpressure. (20 page(s), 10/7/2004)
- ML043020494 - NRR Work Request to IEPB-A. (1 page(s), 12/24/2003)
- ML043020499 - NRR Work Request to SPSB-C. (1 page(s), 12/24/2003)
- ML043020501 - Memo R. Dennig, NRR, to D. Roberts, NRR, Re: Response to December 8, 2003 Letter from State of Vermont. (10 page(s), 2/17/2004)
- ML043020504 - E-mail N. Hasan, NRR, to D. Roberts, NRR, Re: Response to December 8, 2003 Letter from State of Vermont. (1 page(s), 2/18/2004)
- ML043020508 - E-mail R. Ennis, NRC, to B. Sienel and D. Pelton, NRC, Re: Request to confirm info for response to Sherman Letter. (1 page(s), 3/15/2004)
- ML043020510 - E-mail R. Ennis, NRC, to R. Daflucas, Entergy, Re: Confirmation of info regarding Bill Sherman Letter. (1 page(s), 3/18/2004)
- ML043020516 - E-mail R. Ennis, NRC, to R. Lobel, NRR, Re: Yellow ticket - Response to Vermont. (1 page(s), 3/24/2004)
- ML043020521 - E-mail R. Ennis, NRR, to R. Lobel, NRR, Re: Revised paragraph. (1 page(s), 3/24/2004)
- ML043020527 - E-mail R. Dennig, NRR, to M. Johnson, NRR, et al., Re: State of Vermont VY Uprate/NPSH Questions. (1 page(s), 5/3/2004)
- ML043020532 - E-mail R. Dennig, NRR, to M. Johnson, NRR, Re: Response to Sherman- NPSH. (1 page(s), 5/4/2004)
- ML043070017 - Markup of draft response to 12/08/03 letter from W. Sherman w/handwritten comments. (21 page(s), 5/4/2004)
- ML043070018 - E-mail R. Ennis, NRR, to B. Sheron, NRR, Re: Response to Sherman-NPSH. (16 page(s), 5/4/2004)
- ML043070019 - E-mail R. Ennis, NRR, to B. Sheron, NRR, Re: Latest letter to Bill Sherman- NPSH. (35 page(s), 5/17/2004)
- ML043020535 - E-mail M. Johnson, NRR, to S. Black, NRR, R4: Proposed plan for NPSH overpressure issue. (4 page(s), 5/26/2004)
- ML043020539 - 2004/05/27-E-mail M. Johnson, NRR, to R. Dennig, NRR, et al., Re: Credit for Overpressure. (1 page(s), 5/27/2004)
- ML043020459 - 2004/06/04-E-mail M. Stutzke,NRR, to B. Mozafari, NRR, Re: VY Containment Overpressure Risk Assessment. (2 page(s), 6/4/2004)
- ML043020488 - 2004/06/08-E-mail R. Ennis, NRR, to R. Lobel, NRR, Re: Overpressure & Appendix J. (1 page(s), 6/8/2004)
- ML043070021 - E-mail R. Ennis, NRR, to R. Lobel & R. Dennig, NRR, Re; Sherman letter redline/strikeout. (19 page(s), 6/8/2004)
- ML043020492 - E-mail R. Ennis, NRR, to A. Howe, NRR, et al, Re: State of Vermont comments on EPU and AST. (1 page(s), 6/9/2004)
- ML043070022 - E-mail R. Ennis, NRR, to C. Anderson and D. Florek, NRR, Re: Sherman letter. (17 page(s), 6/9/2004)
- ML043020497 - 2004/06/09-Briefing Slides: Credit for Accident Pressure in Calculated NPSH for ECCS and Containment Heat Removal Pumps. (13 page(s), 6/9/2004)
- ML043030228 - E-mail R. Ennis, NRR, to R. Lobel, NRR, Re: Containment Overpressure Briefing. (1 page(s), 6/17/2004)
- ML043030231 - E-mail R. Dennig, to R. Ennis, NRR, Re: any word on MPSH Briefings for DECO/ EDO/NRROD? (1 page(s), 6/21/2004)
- ML043030234 - 2004/06/22-Briefing Slides: Credit for Accident Pressure in Calculated NPSH for ECCS and Containment Heat Removal Pumps. (21 page(s), 6/22/2004)
- ML043030245 - 2004/06/23-Briefing Slides: Credit for Accident Pressure in Calculated NPSH for ECCS and Containment Heat Removal Pumps. (21 page(s), 6/23/2004)
- ML043030254 - 2004/06/24-E-mail S. Black, NRR, to F. Eltawila, RES, Re: VY calculations. (1 page(s), 6/24/2004)
- ML043070023 - 2004/06/24-E-mail R. Dennig, NRR, to S. Black, Re: Meeting with Jim Dyer 06/29 at 3:00 PM - Sherman letter comments. (24 page(s), 6/24/2004)
- ML043030259 - E-mail R. Ennis, NRR, to R. Lodel, NRR, Re: Vermont Yankee audit calculations. (7 page(s), 6/24/2004)
- ML043070024 - 2004/06/28- E-mail R. Ennis, NRR, to J. Dyer, NRR, Re: changes to Sherman letter. (33 page(s), 6/28/2004)
- ML043030265 - E-mail R, Jasinski, NRR, to R. Borchardt, NRR, Re: Vermont PSB Slides & Scripts with attachment (1) 06/28/04 Slides: Vermont Yankee Power Uprate; (2) Vermont Board Meeting on Extended Power Uprate. (52 page(s), 6/28/2004)
- ML043030269 - 2004/06/29-Briefing Slides: Credit for Accident Pressure in Calculated NPSH for ECCS and Containment Heat Removal Pumps. (16 page(s), 6/29/2004)
- ML043030274 - 2004/06/29-Briefing Slides: Credit for Accident Pressure in Calculated NPSH for ECCS and Containment Heat Removal Pumps. (13 page(s), 6/29/2004)
- ML043030277 - Briefing Slides: Credit for Accident Pressure in Calculated NPSH for ECCS and Containment Heat Removal Pumps. (16 page(s), 6/29/2004)
- ML043030281 - Briefing Slides: Credit for Accident Pressure in Calculated NPSH for ECCS and Containment Heat Removal Pumps. (21 page(s), 6/22/2004)