Home > NRC Library > ADAMS Public Documents
FOIA/PA-2004-0277 - Resp 2 - Partial.
Accession Number: ML042580283
Date Released: Monday, September 20, 2004
Package Contents
The following links on this page are to Adobe Portable Document Format (PDF) files. To obtain a free viewer for displaying this format, see our Plugins, Viewers, and Other Tools.
- ML042580280 - FOIA/PA-2004-0277 - Resp 2 - Partial. (5 page(s), 9/10/2004)
- ML040690618 - IR 05000269-04-010, 05000270-04-010 and 05000287-04-010 on 02/17-18/2004, Oconee Nuclear Station. Non-Cited Violations Noted. (11 page(s), 3/9/2004)
- ML040270002 - IR 05000260-03-005 and 05000296-03-005, on 09/28/03 to 12/27/03, Browns Ferry Nuclear Plant. (28 page(s), 1/26/2004)
- ML040430224 - IR 05000321-03-006, & IR 05000366-03-006, Edwin I Hatch Nuclear Plant, Response to Inspection Report. (9 page(s), 2/5/2004)
- ML033220585 - IR 05000321-03-006, 05000366-03-006, Edwin I. Hatch Nuclear Plant - Response to Inspection Report. (3 page(s), 11/18/2003)
- ML033140577 - IR 05000335-03-013, IR 05000389-03-013, On 07/14/2003 - 11/06/2003, for St. Lucie Nuclear Plant, Units 1 and 2; Significance Determination of Fire Protection Inspection Findings. (14 page(s), 11/7/2003)
- ML033020363 - IR 05000302-03-005, on 06/29/2003 - 09/27/2003; Crystal River Unit 3; Fire Protection and Event Followup. (27 page(s), 10/27/2003)
- ML041450096 - IR 05000390-04-006 & IR 05000391-04-006, on 03/29/04 through 04/02/04 & 04/12/04 through 04/16/04, for Watts Bar Nuclear Plant units 1 & 2; Triennial Fire Protection. (28 page(s), 5/20/2004)
- ML040890083 - IR 05000250-04-007 and IR 05000251-04-007, on 01/26 - 30/2004 and 02/09 - 13/2004 for Turkey Point, Units 3 and 4, Triennial Fire Protection Inspection. (38 page(s), 3/26/2004)
- ML033220576 - IR 05000260-03-007, IR 05000296-03-007, on 09/08-09/12/2003 & 09/29-10/03/2003, Browns Ferry Nuclear Plant, Units 2 & 3, Triennial Fire Protection. (29 page(s), 11/17/2003)
- ML032591209 - IR 05000321-03-006, IR 05000366-03-006, On 07/07-11/2003 & 07/21-25/2003, E. I. Hatch Nuclear Plant, Units 1 and 2; Triennial Fire Protection. (72 page(s), 9/1/2003)
- ML032200393 - Errata Letter for McGuire Nuclear Station - NRC Triennial Fire Protection Inspection Report. (33 page(s), 8/5/2003)
- ML031840774 - IR 05000369-03-007 & 05000370-03-007 on 05/05-09/2003 and 05/19-23/2003; Duke Energy Corporation; McGuire, Units 1 and 2; Triennial Fire Protection. (31 page(s), 7/3/2003)
- ML031840351 - IR 05000338-03-006 & 05000339-03-006, on May 5-9, 2003 & May 19-23, 2003, North Anna Power Station. Triennial Fire Protection. (35 page(s), 7/2/2003)
- ML041830225 - IR 05000280-03-008 & 05000281-03-008, on 04/21/03 through 01/07/04, for Virginia Electric & Power Company, Surry, VA; Significance Determination of Unresolved Items from Triennial Fire Protection Inspection. (26 page(s), 2/2/2004)
- ML033380523 - IR 05000400-03-007, Shearon Harris, on 02/01/03 - 10/21/03, Significance Determination of Fire Protection Findings. (21 page(s), 11/18/2003)
- ML040220491 - LER 03-003-00 for H. B. Robinson Steam Electric Plant, Unit N0. 2, Regarding Discovery of Two New Appendix R Safe Shutdown Vulnerabilities. (10 page(s), 1/20/2004)
- ML040340478 - 01/07/04 Meeting Summary with Progress Energy and NRC to Discuss Fire Protection Initiatives. (10 page(s), 2/3/2004)
- ML032680876 - LER 02-004-02 for Shearon Harris, Unit 1 Regarding Unanalyzed Condition Due to Inadequate Separation of Associated Circuits. (9 page(s), 9/19/2003)
- ML041110930 - LER 02-004-03, Harris, Unit 1 Unanalyzed Condition Due to Inadequate Separation of Associated Circuits. (11 page(s), 4/12/2004)
- ML033010295 - 07/31/2003 Slides for Harris Nuclear Plant Safe Shutdown Validation Fire Protection Project Plan Meeting. (24 page(s), 7/31/2003)
- ML032200274 - Harris Nuclear Plant Safe Shutdown Validation Fire Protection Project Plan. (24 page(s), 7/31/2003)
- ML041980127 - 04/20/2004 Summary of Public Meeting With Carolina Power & Light Company re Update of Status of Shearon Harris Fire Protection Safe Shutdown Validation Project. (28 page(s), 4/27/2004)
- ML031430425 - IR 05000277-03-009, IR 05000278-03-009, on 04/07/2003-04/25/2003; Peach Bottom Atomic Power Station Units, 2 and 3; Fire Protection. (26 page(s), 5/22/2003)
- ML030860750 - IR 05000272-03-002 and IR 05000311-03-002, on 02/10-14 and 24-28/03, Salem Unit 1 and Unit 2, Fire Protection. (26 page(s), 3/27/2003)
- ML032550518 - IR 05000293-03-005, on 7/14-18 and 28-31/03, Entergy Nuclear, Pilgrim Nuclear Power Station, Fire Protection. (24 page(s), 9/12/2003)
- ML032950012 - IR 05000346-03-003(DRS); Davis-Besse Nuclear Power Station; 01/13/2003 - 09/09/2003; System Health Assurance Follow-up Inspection. (40 page(s), 10/21/2003)
- ML040490220 - Davis-Besse, Unit 1, Response to Task Interface Agreement (TIA) 2003-06 (TAC No. MC1676). (7 page(s), 2/6/2004)
- ML040631105 - 02/12/2004 6:00 p.m. Transcript of Public Meeting Between NRC and FirstEnergy Nuclear Power Operating Company re: results of Follow-up Restart Readiness Assessment Team Inspection and Follow-up Management and Human Performance Team Inspection. (161 page(s), 2/12/2004)
- ML040650270 - 03/04/2004 NRC Response to NIRS Letter Concerning Fire Protection Requirements at Davis Besse. (8 page(s), 3/4/2004)
- ML040680070 - IR 05000346-03-010(DRS); 03/17/2003 - 01/07/2004; Davis-Besse Nucler Power Station; Corrective Action Program Implementation Effectiveness. (172 page(s), 3/5/2004)
- ML040840254 - Davis Besse 0350 Oversight Panel Restart Action Matrix Public Release Memorandum. (1 page(s), 3/23/2004)
- ML033320054 - Monticello, Exemption Request from the Requirements of 10 CFR 50, Appendix R Section III.G.2 for Fire Area IX/Fire Zone 23A - Intake Structure Pump Room. (22 page(s), 11/17/2003)
- ML023180599 - SECY-03-0100 - Rulemaking Plan on Post-Fire Protection Manual Actions (8 page(s), 6/17/2003)
- ML023180613 - SP03-0100Atch - Rulemaking Plan on Post-Fire Protection Manual Actions, Revision to Appendix R of 10 CFR Part 50 (16 page(s), 6/17/2003)
- ML032550222 - SRM-SECY-03-0100 - Rulemaking Plan on Post-Fire Operator Manual Actions. (1 page(s), 9/12/2003)
- ML032580856 - VR-SECY-03-0100 - "Rulemaking Plan on Post-Fire Operator Manual Actions." (8 page(s), 9/12/2003)
- ML033420147 - 01/05/04 - Status of Staff Actions on Interim Enforcement Guidance and the Proposed Rule for Post-Fire Operator Manual Actions - Memo to Commission from W. Travers. (3 page(s), 1/5/2004)