Transmittal of 40 DOE documents (some reports and some drawings) that were recently acquired during visit to Yucca Mountain site. Requests entry of documents into PDR.
Accession Number: ML031480173
Date Released: Monday, June 9, 2003
Package Contents
The following links on this page are to Adobe Portable Document Format (PDF) files. To obtain a free viewer for displaying this format, see our Plugins, Viewers, and Other Tools.
- ML031480175 - Transmittal of 40 DOE documents (some reports and some drawings) that were recently acquired during visit to Yucca Mountain site. Requests entry of documents into PDR. (3 page(s), 1/11/1995)
- ML031480180 - ESF Test Coordination Office Work Plan WP 92-20A, "Geologic Mapping of the Ramps, MTL Drifts, and Alcoves." (15 page(s), 8/10/1994)
- ML031480188 - ESF Test Coordination Office Work Plan WP 92-20B, "Perched-Water Testing in the Ramps, MTL Drifts, and Alcoves." (13 page(s), 8/25/1994)
- ML031480190 - ESF Test Coordination Office Work Plan WP 92-20C, "Consolidated Sampling in the Ramps, MTL Drifts, and Alcoves." (14 page(s), 9/7/1994)
- ML031480196 - ESF Test Coordination Office Work Plan WP 92-20D, "Construction Monitoring in the Ramps, MTL Drifts, and Alcoves." (62 page(s), 8/10/1994)
- ML031480200 - Drawing OA-46-171, " Yucca Mountain Project Starter Tunnel - Exploratory Studies Facility Full - Periphery Geology Map." (1 page(s), 6/6/1994)
- ML031480213 - Test Planning Package 92-10, Rev. 2, "Geologic Mapping of the Exploratory Studies Facility." (13 page(s), 7/31/1994)
- ML031480223 - Test Planning Package 92-11, Rev. 2, "Perched-Water Testing in the Exploratory Studies Facility." (12 page(s), 8/31/1994)
- ML031480231 - Test Planning Package 92-14, Rev. 2, "Consolidated Sampling in the Exploratory Studies Facility." (54 page(s), 8/31/1994)