Home > NRC Library > ADAMS Public Documents
Transmittal of the Draft Ground Water Compliance Plan for the New Rifle UMTRA Project Site.
Accession Number: ML031470728
Date Released: Wednesday, June 4, 2003
Package Contents
The following links on this page are to Adobe Portable Document Format (PDF) files. To obtain a free viewer for displaying this format, see our Plugins, Viewers, and Other Tools.
- ML031410769 - Transmittal of the Draft Ground Water Compliance Plan for the New Rifle UMTRA Project Site. (1 page(s), 4/30/2003)
- ML031410772 - "Draft Ground Water Compliance Action Plan for the New Rifle, Colorado, UMTRA Project Site," Contents Through Appendix B. (65 page(s), 4/30/2003)
- ML031470712 - "Draft Ground Water Compliance Action Plan for the New Rifle, Colorado, UMTRA Project Site," Appendix B, Attachment A. (16 page(s), 4/30/2003)
- ML031470718 - "Draft Ground Water Compliance Action Plan for the New Rifle, Colorado, UMTRA Project Site," Uranium - Well 0670 Through NO3 - Well 0195. (15 page(s), 4/30/2003)
- ML031470722 - "Draft Ground Water Compliance Action Plan for the New Rifle, Colorado, UMTRA Project Site," Appendix B, Attachment C. (17 page(s), 4/30/2003)
- ML031470724 - "Draft Ground Water Compliance Action Plan for the New Rifle, Colorado, UMTRA Project Site," Drawing U0181100-03 Through Appendix B, Attachment C. (19 page(s), 4/30/2003)
- ML031410783 - "Draft Ground Water Compliance Action Plan for the New Rifle, Colorado, UMTRA Project Site," Appendix B, Appendix D. (53 page(s), 4/30/2003)
- ML031410796 - Map - Vanadium Plume at New Rife Site for 1998. (1 page(s), 4/30/2003)
- ML031410797 - Map - Vanadium Plume at New Rifle Site for 2002. (1 page(s), 4/30/2003)