Home > NRC Library > ADAMS Public Documents
McGuire, Units 1 & 2, Issuance of Amendment Nos. 211 and 192, Respectively, Revising the TSs to allow a One- Time Change in Appendix J, Type A Containment Integrated Leakage Rate Test Interval From Currently Required 10-Year Test Interval to 15 Years.
Accession Number: ML030760033
Date Released: Thursday, March 20, 2003
Package Contents
The following links on this page are to Adobe Portable Document Format (PDF) files. To obtain a free viewer for displaying this format, see our Plugins, Viewers, and Other Tools.
- ML030760032 - McGuire, Units 1 & 2, Issuance of Amendment Nos. 211 and 192, Respectively, Revising the TSs to allow a One- Time Change in Appendix J, Type A Containment Integrated Leakage Rate Test Interval From Current Required 10-Year Test Interval to 15 Years. (15 page(s), 3/12/2003)
- ML030770249 - McGuire Tech Spec Pages for Amendment Nos. 211 and 192, Respectively, allowing a one-time change in the Appendix J, Type A containment integrated leakage rate test. (1 page(s), 3/12/2003)