Home > NRC Library > ADAMS Public Documents
FY04 - 050293 PILGRIM Initial Exam (Oct '03) Fac/Dev UO1503
Accession Number: ML030420153
Date Released: Friday, June 20, 2003
Package Contents
The following links on this page are to Adobe Portable Document Format (PDF) files. To obtain a free viewer for displaying this format, see our Plugins, Viewers, and Other Tools.
- ML031640099 - NRC Ltr dated 6/13/03 - SENIOR REACTOR AND REACTOR OPERATOR INITIAL EXAMINATIONS - PILGRIM NUCLEAR POWER STATION. (4 page(s), 6/13/2003)
- ML032880197 - NRC Comments (Written). (6 page(s), 9/29/2003)
- ML032880205 - Draft Outlines. (31 page(s), 9/29/2003)
- ML032880208 - Draft RO & SRO Written All Questions Key. (200 page(s), 9/29/2003)
- ML033160342 - Draft Section A Operating. (35 page(s), 9/25/2003)
- ML033160348 - Draft Section B Operating. (108 page(s), 9/25/2003)
- ML032880216 - Draft Section C Operating. (33 page(s), 9/29/2003)
- ML032880223 - Final Outlines (Change Summaries - Optional). (25 page(s), 9/29/2003)
- ML032880228 - Final RO & SRO Written. (202 page(s), 9/29/2003)
- ML033160296 - Final Section A Operating. (33 page(s), 9/25/2003)
- ML033160298 - Final Section B Operating (101 page(s), 9/25/2003)
- ML032880234 - Final Section C Operating. (31 page(s), 9/29/2003)
- ML033090564 - Exam Notification Ltr dtd 11/04/03. (3 page(s), 11/4/2003)
- ML033160420 - Facility Request for Waiver w/o Enclosures dtd 12/23/2002. (3 page(s), 12/23/2002)
- ML033160423 - Final QA/Related Forms. (12 page(s), 9/25/2003)
- ML033220073 - IR Pilgrim Nuclear Power Station Operator and Senior Reactor Operator Initial Examination Report No. 05000293/2003-301, dtd 11/18/03. (7 page(s), 11/18/2003)
- ML033350031 - NRC Certificate Ltr dtd 12/01/03. (2 page(s), 12/1/2003)