Home > NRC Library > ADAMS Public Documents
10/30/2002 & 10/31/2002 Summary of Public Meeting Re Mitigating Systems Performance Index (MSPI) & Reactor Oversight Process (ROP) MSPI/ROP Topics.
Accession Number: ML023120319
Date Released: Friday, November 15, 2002
Package Contents
The following links on this page are to Adobe Portable Document Format (PDF) files. To obtain a free viewer for displaying this format, see our Plugins, Viewers, and Other Tools.
- ML023100211 - 10/30/2002 & 10/31/2002 Summary of Public Meeting Re Mitigating Systems Performance Index (MSPI) & Reactor Oversight Process (ROP) MSPI/ROP Topics. (5 page(s), 11/6/2002)
- ML023110326 - Status of the Shutdown SDP Tools - Attachment 3. (5 page(s), 10/30/2002)
- ML023110340 - Risk-Informed Inspection Template for a BWR During Shutdown, Draft - Attachment 4. (59 page(s), 10/24/2002)
- ML023110347 - Risk-Informed Inspection Template for a PWR During Shutdown, Draft - Attachment 5. (62 page(s), 10/24/2002)
- ML023110349 - Enhanced PWR Appendix G, Phase 1 to be Used by Inspectors and SRAs; Shutdown Operations Significance Determination Process, Draft - Attachment 6. (27 page(s), 10/29/2002)
- ML023110352 - PWR Sample Problem 1, Shutdown Cooling Flow Perturbations, Attachment 7. (12 page(s), 10/30/2002)
- ML023110353 - NRC's Proposed Responses to FAQs - Draft, Attachment 8. (1 page(s), 9/25/2002)
- ML023110380 - FAQ' Log, Draft - Attachment 9. (21 page(s), 10/28/2002)
- ML023110384 - 1995 Loss of Feedwater Flow Initiating Events - Attachment 10. (7 page(s), 11/6/2002)
- ML023110385 - Proposal for Definitions to be Used in the Scrams with Loss of Normal Heat Removal PI - Attachment 11. (8 page(s), 11/6/2002)
- ML023110387 - Unplanned Scrams & Unplanned Scrams w/ Loss of Normal Heat Removal by Year - Attachment 12. (1 page(s), 11/6/2002)
- ML023110388 - MC 0609 Appendix B, Emergency Preparedness, Seciton 5.3, Draft - Attachment 13. (4 page(s), 10/31/2002)