Home > NRC Library > ADAMS Public Documents
Summary of 01/08/2002 license renewal meeting between the U.S. NRC staff and the NEI; Hatch Nuclear Plant, 1 & 2; Turkey Point, 3 & 4; Surry and North Anna Power Stations, 1 & 2; McGuire & Catawba Nuclear Stations, 1 & 2; and Peach Bottom Atomic Power.
Accession Number: ML020560022
Date Released: Friday, March 1, 2002
Package Contents
The following links on this page are to Adobe Portable Document Format (PDF) files. To obtain a free viewer for displaying this format, see our Plugins, Viewers, and Other Tools.
- ML020560058 - Summary of 01/08/2002 license renewal meeting between the U.S. NRC staff and the NEI; Hatch Nuclear Plant, 1 & 2; Turkey Point, 3 & 4; Surry and North Anna Power Stations, 1 & 2; McGuire & Catawba Nuclear Stations, 1 & 2; and Peach Bottom Atomic Power. (18 page(s), 2/21/2002)
- ML020530398 - Attachment to the 01/08/2002 mtg with NEI, Southern Nuclear Operating Company (SNC), Florida Power and Light Company (FPL), Virginia Electric and Power Company (VEPCO), Duke Energy Corporation (Duke), and Exelon Generation Company (Exelon). (48 page(s), 1/8/2002)