NRC Logo

Home > NRC Library > ADAMS Public Documents

Clinton Power Station, Unit 1 - Issuance of Amendment increasing Technical Specification allowed outage time from 3 to 14 days for a single inoperable Division 1 or 2 diesel generator.

Accession Number: ML013170061

Date Released: Friday, November 16, 2001

Package Contents

The following links on this page are to Adobe Portable Document Format (PDF) files. To obtain a free viewer for displaying this format, see our Plugins, Viewers, and Other Tools.

Privacy Policy | Site Disclaimer