Home > NRC Library > ADAMS Public Documents
06/28/01 Letter to Administrative Judges enclosing 05/04/01 ltr from C. J. Cowgill to R. P. Necci re Millstone 2 & 3 Inspection Reports and 06/04/01 ltr from R. R. Bellamy to R. P. Necci re Millstone 1 Inspection Report
Accession Number: ML011840461
Date Released: Thursday, August 9, 2001
Package Contents
The following links on this page are to Adobe Portable Document Format (PDF) files. To obtain a free viewer for displaying this format, see our Plugins, Viewers, and Other Tools.
- ML011830398 - Millstone 3 06/28/01 Letter to Administrative Judges-Inspection 0500024/2000018, Dominion Nuclear Connecticut, Inc., Millstone Nuclear Power Station, Unit 1, Waterford, and Millstone Units 2 & 3 - NRC Inspection Report 05000336/2001-002 and 05000423/2001 (2 page(s), 6/28/2001)
- ML011560643 - Inspection 05000245/2000018, Dominion Nuclear Connecticut, Inc., Millstone Nuclear Power Station, Unit 1, Waterford, CT. (56 page(s), 6/4/2001)
- ML011270232 - IR 05000336/2001-002; on 02/11-03/31/01; Dominion Nuclear Connecticut, Inc., Millstone Nuclear Power Station; Unit 2. Operator Work-Arounds, Licensee Identified Violations. IR 05000423/2001-002; on 02/11-03/31/01; Dominion Nuclear Connecticut, Inc., (42 page(s), 5/4/2001)
- ML020370501 - Commission Memorandum and Order (CLI-02-05) (5 page(s), 2/6/2002)