Home > NRC Library > ADAMS Public Documents
FOIA/PA-2001-0012 - Resp 6 - Partial.
Accession Number: ML010820285
Date Released: Thursday, March 29, 2001
Package Contents
The following links on this page are to Adobe Portable Document Format (PDF) files. To obtain a free viewer for displaying this format, see our Plugins, Viewers, and Other Tools.
- ML010820080 - FOIA/PA-2001-0012 - Resp 6 - Partial (5 page(s), 3/21/2001)
- ML010820084 - Note to Scott Sparks to release OI Report 2-98-027, from William McNutty, (1 page(s), 5/17/1999)
- ML010820086 - ARB MEETING AGENDA-12/09/1998 Review at ARB to determine further action re NRR-1998-A-0011 Watts Bar (1 page(s), 12/9/1998)
- ML010820090 - Exhibit 8: Case 2-1998-027 In the Matter of Interview of Vernon P. Law, Thursday, January 14, 1999. (13 page(s), 1/14/1999)
- ML010820095 - Handwritten note of Interview of Joseph Edware Englehardt. (2 page(s), 1/15/1999)
- ML010820097 - Handwritten note of Interview of Paul L. Pace (1 page(s), 1/14/1999)
- ML010820103 - Handwritten note of interview with Doug Jackson (1 page(s), 1/15/1999)
- ML010820106 - Handwritten note of interview with Robert Bruce Rieber (1 page(s), 1/15/1999)
- ML010820112 - Handwritten note of Interview with Thomas Frederick Huth, Reactor Eng. (1 page(s), 1/15/1999)
- ML010820118 - Handwritten note of Interview of Sammy Lee Linginfelter, System Eng. (2 page(s), 1/14/1999)
- ML010820126 - Handwritten note of Interview of Landy Leon McCormick Computer Eng. Supp. since 1996. (3 page(s), 1/14/1999)
- ML010820136 - Handwritten note of Interview of Craig Steven Faulkner, Reactor Eng, Section Supervisor and Acting Oper. Supp. Superintendent. (2 page(s), 1/14/1999)
- ML010820145 - Handwritten note of Interview of Gary Williams, System Eng. (1 page(s), 1/14/1999)
- ML010820150 - Handwritten note of Interview of Edward David Gentry, System Eng. (1 page(s), 1/14/1999)
- ML010820092 - Handwritten note of Interview of John William Fergeson, System Eng. (1 page(s), 1/14/1999)
- ML010820108 - Handwritten note of Interview of Charles Edward Wood, Jr., Thermol Performance Eng. (1 page(s), 1/14/1999)
- ML010820143 - Handwritten note of Interview with Margaret Elizabeth Swlewski, System Engineer. (1 page(s), 1/14/1999)
- ML010820148 - Handwritten note of Interview with Vernon Paul Law, System Eng. (1 page(s), 1/14/1999)
- ML010820153 - Interview of Jose Javier Ortiz Primary Containment Leak Plate Eng. (1 page(s), 1/14/1999)
- ML010820157 - Handwritten note of Interview of Steven Daniel Swindlehurst, 965 Tech Support. (1 page(s), 1/14/1999)
- ML010820158 - Spoke with Mr. Warren said he would look for information, may have thrown duty planner From "95" awat. (1 page(s), 3/4/1999)
- ML010820161 - Letter to David A. Lochbaum of Union of Concerned Scientists refers to Allegation RIII-98-A-0011, public meeting on 01/12/98 related to activities at the D. C. Cook, Watts Bar, and McGuire nuclear power plants. (5 page(s), 1/27/1998)
- ML010820181 - Letter to thank David A. Lochbaum for his concen that the staff inappropriately closed 10CFR Part 21 Westinghouse reportability concern of allegation NRR-98-A-0011. (1 page(s), 8/24/1998)
- ML010820221 - NRR Allegation Review Board met with the ARB members on 09/28/98 with a list of issues and concerns were discussed. (6 page(s), 9/28/1998)
- ML010820243 - RESPONSE TO WESTINGHOUSE REPLY TO NOTICE OF VIOLATION AND NOTICE OF NONCONFORMANCE NRC INSPECTION REPORT 99900404/98-02. (6 page(s), 12/14/1998)
- ML010820248 - Ice Condenser Issues and Resolution. (9 page(s), 1/27/1999)
- ML010820162 - NRR Allegation Review Board reconvened to discuss the status of issues,. (4 page(s), 3/29/1998)
- ML010820169 - TENNESSEE VALLEY AUTHORITY SEQUOYAH NUCLEAR PLANT UNITS, 1 & 2, WATTS BAR NUCLEAR PLANT UNIT 1, DUKE POWER COMPANY, CATAWBA NUCLEAR PLANT UNITS, 1& 2, AND MCGUIRE NUCLEAR PLANT UNITS, 1 & 2 STATEMENT OF CONCERNS. (1 page(s), 4/27/1998)
- ML010820176 - ARB Summary reason re: Information obtained by fax on 04/21/98, from RGN-III Allegation Coordinator to discuss the approach for closure of this allegation. (2 page(s), 4/27/1998)
- ML010820179 - LETTER TO A. IGNATONIS ALLEGATION NUMBER RII-1998-A-0025. (1 page(s), 4/3/1998)
- ML010820186 - Follow-up letter to the subject Allegation RII1998-A-0025 to Mr. Brent Clayton NRC/RGN-III. (1 page(s), 3/31/1998)
- ML010820200 - REGION II ICE CONDENSER (IC) INSPECTION PLAN (6 page(s), 7/9/1998)
- ML010820208 - Ol REPORT 2-98-027; RE: WATTS BAR NUCLEAR PLANT; ALLEGED IMPROPER INSTRUCTION OF WATTS BAR ENGINEERS NOT TOWRITE PROBLEM EVALUATION REPORTS. (1 page(s), 4/22/1998)
- ML010820227 - Partially withheld CASE CHRONOLGY, OI CASE 2-1998-027 (2 page(s), 12/21/1998)
- ML010820242 - WATTS BAR NUCLEAR PLANT: ALLEGED IMPROPER INSTRUCTION OF WATTS BAR ENGINEERS NOT TO WRITE PROBLEM EVALUATION REPORTS (NRR-1998-A-OO1 1/ RII- 1 998-A-O 168). (11 page(s), 4/5/1999)
- ML010820250 - ALLEGED IMPROPER INSTRUCTION OF WATTS BAR ENGINEERS NOT TO WRITE PROBLEM EVALUATION REPORTS. (1 page(s), 12/21/1998)
- ML010820256 - Investigation Status Record, Allegation NRR-1998-A-0011. (2 page(s), 12/21/1998)
- ML010820262 - EXHIBIT 1 ALLEGED IMPROPER INSTRUCTION OF WATTS BAR ENGINEERS NOT TO WRITE PROBLEM EVALUATION REPORTS (PERS.) (2 page(s), 12/21/1998)
- ML010820267 - EXHIBIT 3 INTERVIEW OF CURTIS OVERALL. (20 page(s), 2/11/1999)
- ML010820271 - Exhibit 9 to OI 2-1998-027, Interviews with Tennessee Valley Athority Employees. (4 page(s), 1/14/1999)
- ML010820275 - Allegation RII-1997-A-0148. (2 page(s), 3/21/2001)
- ML010820278 - ARB MEETING AGENDA JULY 1, 1997 (1 page(s), 7/1/1997)