On this page:Publication InformationAbstractDownload complete documentNUREG/CR-7154, Volume 1 (PDF - 1.69 MB)Publication InformationManuscript Completed: October 2012Date Published: January 2013Prepared by: M. Azarm, T. Gitnick, S. Herrick, J. Kratchman, M. Morell-Gonzalez, R....
On this page:Publication InformationAbstractDownload complete documentNUREG/CR-7154, Volume 2 (PDF - 6.51 MB)Publication InformationManuscript Completed: October 2012Date Published: January 2013Prepared by: M. Azarm, T. Gitnick, S. Herrick, J. Kratchman, M. Morell-Gonzalez, R....
(a) Upon completion of a hearing, the Commission will issue a written opinion including its decision on the license application, the reasons for the decision and any dissenting views.(b) While the Commission will consider fully the hearing record, the licensing decision will b...
(a) Validity test results. Each validity test result for a specimen that the HHS-certified laboratory reports to the MRO as adulterated, substituted, dilute, or invalid must be based on performing an initial validity test on one aliquot and a confirmatory validity test on a se...
Each operating nuclear power plant must include a standard emergency classification and Emergency Action Level (EAL) scheme in its emergency plans. EALs are pre-determined, site-specific, observable triggers for placing the plant in a classification such as an Unusual Event, A...
FileTitleVolume 1Risk Informing Emergency Preparedness Oversight: Evaluation of Emergency Action Levels – A Pilot Study of Peach Bottom, Surry and Sequoyah (Main Report, Appendices A and B)Volume 2Risk Informing Emergency Preparedness Oversight: Evaluation of Emergency Action ...
The licensee, applicant for a license, certificate holder, and applicant for a CoC shall establish measures to ensure that conditions adverse to quality, such as failures, malfunctions, deficiencies, deviations, defective material and equipment, and nonconformances, are prompt...
The Commission will incorporate in the notice of adoption of a regulation a concise general statement of its basis and purpose, and will cause the notice and regulation to be published in the Federal Register or served upon affected persons.
This page provides links to the overall plan and the completed tasks for the four action plans that were developed to address the High Priority recommendations for the Lessons Learned Task Force (LLTF). On this page:Overall PlanStress Corrosion Cracking Action PlanOperati...
If an incident at a nuclear power plant could result in a radiation dose exceeding the Environmental Protection Agency's protective action guides, responsible plant personnel evaluate the situation and then make protective action recommendations (PARs) for public safety to...
The system by which a utility finds and fixes problems at the nuclear plant. It includes a process for evaluating the safety significance of the problems, setting priorities in correcting the problems, and tracking them until they have been corrected.
This page includes links to files in non-HTML format. See Plugins, Viewers, and Other Tools for more information.Saint Joseph Regional Medical Center (EAF-RIII-2025-0014)On May 27, 2025, the NRC issued a notice of violation (Notice) to Saint Joseph Regional Medical Center (lic...
NRR Action Plans are used to manage the resolution of safety, generic, significant, complex, or long term issues. They also focus on compliance activities, and complement NUREG-0933, "Resolution of Generic Safety Issues."On this page: Action Plan Updates - OpenAction Plan Upda...
Brief DescriptionThe NRC determines its regulatory response in accordance with an Action Matrix that provides for a range of actions commensurate with the significance of the performance indicator (PI) and inspection results as described in IMC 0305, "Operating Reactor Assessm...
(a) If a hearing is not required by the Act or this chapter, and if the Commission has not found that a hearing is in the public interest, it will, before acting thereon, publish in the Federal Register, as applicable, or on the NRC's Web site, http://www.nrc.gov, or both, at ...
Licensee attainment of defined objectives and results without detailed direction from the NRC on how these results are to be obtained. (See the Communication Plan for Performance-Based Regulation by using accession number ML021120533 in ADAMS.)
The licensee, certificate holder, and applicant for a CoC shall establish measures to assure that conditions adverse to quality, such as deficiencies, deviations, defective material and equipment, and nonconformances, are promptly identified and corrected. In the case of a sig...
General§ 51.100 Timing of Commission action.(a)(1) Except as provided in § 51.13 and paragraph (b) of this section, no decision on a proposed action, including the issuance of a permit, license, or other form of permission, or amendment to or renewal of a permit, license, or o...
(a) Upon completion of a hearing, the Commission will issue a written opinion including its decision on the license transfer application and the reasons for the decision.(b) The decision on issues designated for hearing under § 2.309 will be based on the record developed at he...
(a) Whenever, under the provisions of § 10.28(i), (j), or (l) an individual has not been afforded an opportunity to confront and cross-examine witnesses who have furnished information adverse to the individual and an adverse recommendation has been made by the Deputy Executive...
(a) Initial drug testing. (1) HHS-certified laboratories shall apply the following cutoff levels for initial testing of specimens to determine whether they are negative or positive for the indicated drugs and drug metabolites, except as specified in paragraph (a)(2) of this se...
The NRC determines its regulatory response in accordance with a Construction Action Matrix that provides for a range of actions commensurate with the significance of the inspection results as described in IMC 2505, "Periodic Assessment of Construction Inspection Program R...
In connection with each application filed after January 7, 1983, for a license or an amendment to a license to expand the spent nuclear fuel storage capacity at the site of a civilian nuclear power plant, for which the Commission has not found that a hearing is required in the...
On March 27, 2012, the NRC issued a Confirmatory Action Letter (CAL) to SCE, to confirm the actions the licensee committed to take prior to returning Units 2 and 3 to power operation. The CAL specifies that prior to restart of either unit, the licensee will identify the cause(...