Change Notice 03-016

Issue Date: 5/23/03


 

 

All Files in ZIP Format cn 03-016.zip
 

This page includes links to files in non-HTML format. See Plugins, Viewers, and Other Tools for more information.

 
 
DELETED:
Number

Date
TRANSMITTED:
Number
 
 

Date
1. IP 95001 01/17/02 IP 95001 05/23/03
2. IP 95002 01/17/02 IP 95002 05/23/03
3. IMC 0612, Exh 3 04/01/03 IMC 0612, Exh 3 05/23/03


 
TRAINING:

The following training is required for IP 95001 and IP 95002 in this change notice:

INSPECTORS MUST READ THE FOLLOWING INFORMATION BEFORE IMPLEMENTING THESE PROCEDURES

The revisions to these procedures incorporated changes on assessing the extent of condition. Inspection requirements contained in Section 03.02d of both procedures have been clarified and a new term, "extent of cause," has been added. "Extent of cause" more directly addresses what might have been previously called �generic implications.'

These changes also provide guidance for determining whether credit should be given as an old design issue under IMC 0305. The new section, 02.04 in IP 95001 and 02.05 in IP 95002, should only be implemented if the licensee is requesting credit under the "old design issue" provisions of IMC 0305.

REMARKS:

IP 95001 (Inspection For One Or Two White Inputs In A Strategic Performance Area) clarify guidance on extent of condition review and add guidance for evaluating whether credit should be given for "old design issues."

IP 95002 (Inspection For One Degraded Cornerstone Or Any Three White Inputs In A Strategic Performance Area) clarify guidance on extent of condition review and add guidance for evaluating whether credit should be given for "old design issues."

IMC 0612, Exh 3 (Sample Reactor Inspection Report) Exhibit 3 has been revised to not require licensee identified NCV's be put in the PIM.

DISTRIBUTION: Standard

END

Page Last Reviewed/Updated Thursday, April 09, 2020