Part 21 Report - 1995-005
ACCESSION #: 9501040173
TELEPHONE (815) 727-2600
POST OFFICE BOX 3339
JOLIET, IL 60434
CRANE NUCLEAR OPERATIONS
CRANE VALVES 104 NORTH CHICAGO STREET JOLIET, IL 60431
December 28, 1994
Document Control Desk
U.S. Nuclear Regulatory Commission
Washington, DC 20555
SUBJECT: INTERIM REPORT #4 of 10CFR Part 21 Evaluation
REFERENCE: Crane Letter Dated May 16, 1994
Gentlemen:
This letter is a follow-up to the referenced letter, in which Crane Valves
Nuclear Operations advised that we were undertaking an investigation to
determine if data supplied in the mid-1980's was used by Nuclear Utilities
to set torque switches in Motor Operated Valves.
As described in the May correspondence, over 600 issues of Engineering
calculations have been generated and the scope of that evaluation is even
greater than we initially anticipated. As of this date, we have uncovered
no contractual evidence to support the fact that Crane supplied erroneous
data to Utilities, since most orders do not specify the objective of our
earlier evaluations.
It is expected that the evaluation will be completed within the next 30
days. Any questions can be directed to my attention at 815-740-7571.
Sincerely,
Henry G.L. McCullough, P.E.
Manager Engineering/
Quality Assurance
HGMcC/cs