Event Notification Report for November 21, 2008

U.S. Nuclear Regulatory Commission
Operations Center

Event Reports For
11/20/2008 - 11/21/2008

** EVENT NUMBERS **


44670 44671 44672

To top of page
General Information or Other Event Number: 44670
Rep Org: FISHER CONTROLS INTERNATIONAL, LLC
Licensee: FISHER CONTROLS INTERNATIONAL, LLC
Region: 3
City: MARSHALLTOWN State: IA
County:
License #:
Agreement: Y
Docket:
NRC Notified By: DAVE SUK
HQ OPS Officer: MARK ABRAMOVITZ
Notification Date: 11/20/2008
Notification Time: 17:20 [ET]
Event Date: 10/28/2008
Event Time: [CST]
Last Update Date: 11/20/2008
Emergency Class: NON EMERGENCY
10 CFR Section:
21.21 - UNSPECIFIED PARAGRAPH
Person (Organization):
EUGENE GUTHRIE (R2)
PART 21 GROUP ()

Event Text

PART 21 - 18" VALVE ASSEMBLY BEARINGS NOT DEDICATED PARTS

The following report was received via facsimile:

"Items provided to Duke Energy - Oconee per Fisher Order Number 033-B800163810, Items 010A- 10L (Duke Energy Order DP16655). This equipment included 18" CL150 Fisher A31A valve assemblies (quantity 12). The equipment is identified by Fisher Serial Numbers 16986219 through 16986230 (Duke Energy Item Number DMV-1409).

"Fisher Controls has determined that the subject items were provided with parts that were not properly processed per active valve requirements specified by the Duke Energy Order DP16655. Specifically, Fisher provided commercial grade bearings and thrust bearings instead of commercial grade dedicated items per EPRI 5652.

"We are reviewing the situation and will pursue a corrective action investigation to prevent problems like this in the future.

"Arrangements have been made with Duke Energy to retrofit the correctly processed parts on the subject serial numbers. This is a formal notification; Duke Energy was notified of this situation on October 28, 2008."

To top of page
Power Reactor Event Number: 44671
Facility: COOPER
Region: 4 State: NE
Unit: [1] [ ] [ ]
RX Type: [1] GE-4
NRC Notified By: RANDY KOUBA
HQ OPS Officer: MARK ABRAMOVITZ
Notification Date: 11/20/2008
Notification Time: 18:24 [ET]
Event Date: 11/20/2008
Event Time: 12:30 [CST]
Last Update Date: 11/20/2008
Emergency Class: NON EMERGENCY
10 CFR Section:
50.72(b)(3)(v)(D) - ACCIDENT MITIGATION
Person (Organization):
CHUCK CAIN (R4)

Unit SCRAM Code RX CRIT Initial PWR Initial RX Mode Current PWR Current RX Mode
1 N Y 100 Power Operation 100 Power Operation

Event Text

CONTROL ROOM EMERGENCY FILTRATION SYSTEM INOPERABLE

"On 20 Nov 08 at 1230, the Control Room Emergency Filtration System (CREFS) was declared inoperable due to a report that a non-running Control Room supply fan discharge damper was found partially open. Per the System Operating Procedure, the idle fan's discharge damper must be fully closed to assure operability. With the damper not closed, reasonable assurance that CREFS would fulfill its safety function could not be established.

"With the Idle Control Room supply fan discharge damper not in the closed position, some portion of the air discharged from the operating Control Room supply fan will go backwards through the idle supply fan to the suction side of both supply fans. The CREFS fan discharges to the Control Room supply fan suctions. With CREFS in this as-found line-up, there is no assurance that the flow through CREFS is high enough to meet the design requirements assumed in control room occupant dose calculations.

"The Control Room supply fans and discharge dampers are required support features for CREFS at CNS. This is a single train system and per 10CFR50.72(b)(3)(v)(D) an 8 hour report is required due to the fact that at the time of discovery this condition could have prevented the fulfillment of the safety function of an SSC that is required to mitigate the consequences of an accident.

"The licensee notified the NRC Resident Inspector.

"The damper was returned to a fully closed position at the time of discovery, and CREFS was returned to operable status."

To top of page
Power Reactor Event Number: 44672
Facility: PILGRIM
Region: 1 State: MA
Unit: [1] [ ] [ ]
RX Type: [1] GE-3
NRC Notified By: JOHN WHALLEY
HQ OPS Officer: HOWIE CROUCH
Notification Date: 11/20/2008
Notification Time: 21:21 [ET]
Event Date: 11/20/2008
Event Time: 16:57 [EST]
Last Update Date: 11/20/2008
Emergency Class: NON EMERGENCY
10 CFR Section:
50.72(b)(3)(v)(D) - ACCIDENT MITIGATION
Person (Organization):
JAMES DWYER (R1)

Unit SCRAM Code RX CRIT Initial PWR Initial RX Mode Current PWR Current RX Mode
1 N Y 100 Power Operation 100 Power Operation

Event Text

UNEXPECTED HIGH PRESSURE COOLANT INJECTION ISOLATION DURING TEST

"The High Pressure Coolant Injection (HPCI) system was declared inoperable on 11/20/08 at 1657 EST due to a Group 4 isolation signal generated during scheduled surveillance testing in accordance with PNPS [Pilgrim Nuclear Power Station] Procedure 8.M.2-2.5.3, Attachment 1. The HPCI testing was stopped to determine the cause of the isolation which was not part of the planned evolution. HPCI isolation was reset and HPCI was restored to standby lineup at 1804 EST. This event is an eight-hour notification. Efforts are ongoing to determine the cause of the error during testing.

"This event had no adverse effect to the health and/or safety of the public.

"The licensee has notified the NRC Resident Inspector of this event.

"This notification is being made in accordance with 10 CFR 50.72(b)(3)(v)(D) due to the loss of a single train system required to mitigate the consequences of an accident."

Page Last Reviewed/Updated Wednesday, March 24, 2021