U.S. Nuclear Regulatory Commission Operations Center Event Reports For 12/29/2004 - 12/30/2004 ** EVENT NUMBERS ** | Power Reactor | Event Number: 41298 | Facility: TURKEY POINT Region: 2 State: FL Unit: [3] [ ] [ ] RX Type: [3] W-3-LP,[4] W-3-LP NRC Notified By: PAUL REIMERS HQ OPS Officer: HOWIE CROUCH | Notification Date: 12/28/2004 Notification Time: 23:51 [ET] Event Date: 12/28/2004 Event Time: 22:46 [EST] Last Update Date: 12/29/2004 | Emergency Class: NON EMERGENCY 10 CFR Section: 50.72(b)(2)(iv)(B) - RPS ACTUATION - CRITICAL 50.72(b)(3)(iv)(A) - VALID SPECIF SYS ACTUATION | Person (Organization): JAMES MOORMAN (R2) | Unit | SCRAM Code | RX CRIT | Initial PWR | Initial RX Mode | Current PWR | Current RX Mode | 3 | M/R | Y | 70 | Power Operation | 0 | Hot Standby | Event Text MANUAL REACTOR TRIP DUE TO GENERATOR EXCITER COOLING WATER LEAK "Unit 3 unplanned Manual Reactor trip from 70% due to Generator Exciter cooling water leak. Leak caused voltage regulator transfer to manual. Cooling water leak was isolated after the manual reactor trip. Water was noted in the 3B 4kv safety related bus room affecting 3B Residual Heat Removal Pump breaker. This component is considered inoperable pending corrective action. Plant is stable in mode 3. "Auxiliary Feed Water actuated automatically, as expected, and operated normally following the reactor trip." All control rods fully inserted. The MSIV's were manually closed to prevent excessive RCS cooldown and decay heat is being removed via the atmospheric steam dumps. Unit 4 was unaffected. The licensee will notify the NRC Resident Inspector. | Power Reactor | Event Number: 41299 | Facility: BYRON Region: 3 State: IL Unit: [1] [2] [ ] RX Type: [1] W-4-LP,[2] W-4-LP NRC Notified By: TOM CONBOY HQ OPS Officer: JOHN MacKINNON | Notification Date: 12/29/2004 Notification Time: 16:37 [ET] Event Date: 12/29/2004 Event Time: 14:00 [CST] Last Update Date: 12/29/2004 | Emergency Class: NON EMERGENCY 10 CFR Section: INFORMATION ONLY | Person (Organization): CHRISTINE LIPA (R3) PATRICK HILAND (NRR) HO NIEH (IRD) | Unit | SCRAM Code | RX CRIT | Initial PWR | Initial RX Mode | Current PWR | Current RX Mode | 1 | N | Y | 100 | Power Operation | 100 | Power Operation | 2 | N | Y | 100 | Power Operation | 100 | Power Operation | Event Text LOSS OF COMMUNICATIONS TO SITE DUE TO FIBER OPTIC LINE CUT At approximately 1400 CST all commercial and FTS 2000 telephone communications to and from Byron Station was lost due to a fiber optic cable cut 20 miles North of the plant, near Rockford, Il. Licensee can contact the NRC Headquarters Operation Officer via a Control Room cell phone. NRC Headquarters Operation Officer is unable to call the site using the cell phone because incoming calls are routed through Rockford, Il. Licensee stated that the line problem is being worked on. NRC Resident Inspector has been notified of this event by the licensee. * * * Update 12/29/04 at 2139 EST by Koeplin to MacKinnon * * * Commercial and FTS telephone service returned to service. Licensee will notified the NRC Resident Inspector. R3DO (C. Lipa) & NRR EO (Pat Hiland) notified. | |