| Location of Projected New Nuclear Power Reactors |
| Bell Bend |
| Bellefonte, Units 3 & 4 |
| Callaway, Unit 2 |
| Calvert Cliffs, Unit 3 |
| Comanche Peak Units, 3 & 4 |
| Fermi, Unit 3 |
| Grand Gulf, Unit 3 |
| Levy County, Units 1 & 2 |
| Nine Mile Point, Unit 3 |
| North Anna, Unit 3 |
| River Bend Station, Unit 3 |
| Shearon Harris, Units 2 & 3 |
| South Texas Project, Units 3 & 4 |
| Turkey Point, Units 6 & 7 |
| Victoria County Station, Units 1 & 2 |
| Virgil C. Summer, Units 2 & 3 |
| Vogtle, Units 3 & 4 |
| William States Lee III, Units 1 & 2 |
|
Home > Nuclear Reactors > New Reactors > Combined License Applications
> Fermi, Unit 3 Application
Fermi, Unit 3 Application
|
| Who: |
Detroit Edison Company
|
| What: |
Application for a combined license (COL) for an Economic Simplified Boiling Water Reactor (ESBWR) designated as
Fermi, Unit 3
|
| When: |
September 2008 (date of application submittal)
|
| Where: |
Detroit Edison Company's Fermi site near Newport City in Monroe County, Michigan |
|
On this page:
Some links on this page are to documents in our our Agencywide Documents Access and Management System (ADAMS). For additional information, see our Plugins, Viewers, and Other Tools.
Reference Documents

Applicant Documents
Some combined license applications were submitted with hyperlinks to various reference documents. Currently, the hyperlinks in those applications are not active. These hyperlinks represent an advanced feature that could be activated when the agency upgrades to web-based ADAMS, at which point these applications and documents such as the Design Control Documents would be linked together. In the interim, and for those applications that do not have the hyperlink feature, the reference documents may be viewed under the Reference Documents section of the combined license application page. In addition, DVDs of the various documents are available by contacting the Public Document Room staff.
| Date |
Description |
| 02/16/09 |
Edison company Evaluation of North Anna Unit 3 (R-COLA) Responses to NRC Requests for Additional Information
|
| 11/11/08 |
Detroit Edison Company Submittal of Fermi 3 FSAR Section 2.4.13 Analysis
|
| 10/27/08 |
Detroit Edison Company Submittal of Response to NRC Acceptance Review Questions (Sections 2.5.2 and 2.5.4)
|
| 09/18/08 |
Detroit Edison Company transmittal letter for Fermi Unit 3 COLA
- Part 1 - General and Administrative Information
- Part 2 - Final Safety Analysis Report (FSAR)
- Part 3 - Environmental Report
- Part 4 - Technical Specifications
- Part 5 - Emergency Plan
- Part 6 - Part not used in this application
- Part 7 - Departures (Variances, Supplemental Information) from the ESBWR Design Control Document (DCD)
- Part 8 - Security Plan [This Part contains safeguards information which is withheld from public availability]
- Part 9 - Part not used in this application
- Part 10 - Tier 1/Inspections, Tests, Analyses, and Acceptance Criteria (ITAAC)
|

Application Review Schedule
| Key Milestones |
Completion Date Actual - A Target - T |
| Application Tendered |
09/18/08 - A |
| Acceptance Review |
Acceptance Review Start |
09/18/08 - A |
Docketing Decision Letter Issued/Acceptance Review Complete |
11/25/08 - A |
Review Schedule Established/Schedule Letter Issued to Applicant |
|
| Safety Review |
Phase 1 - Requests for Additional Information (RAIs) Issued to Applicant |
|
Phase 2 - SER with Open Items issued |
|
Phase 3 - ACRS Review of SER with Open Items Complete |
|
Phase 4 - Advanced SER with no Open Items Issued |
|
Phase 5 - ACRS Review of SER with no Open Items Complete |
|
Phase 6 - Final SER Issued |
|
| Environmental Review |
Phase 1 - Environmental impact statement (EIS) summary report issued |
|
Phase 2 - Draft EIS issued to EPA |
|
Phase 3 - Response to public comments on draft EIS issued |
|
Phase 4 - Final EIS issued to EPA |
|
| Hearing |
Commission or ASLB hold mandatory hearing |
|
| License |
Commission decision on issuance of COL application |
|
Information on Federal Register notices for receipt of the application and opportunity to request a hearing or petition to intervene can be found on the Hearing Opportunities page.

NRC Documents
| Date |
Description |
| 05/12/09 |
Requests for Additional Information Related to the Environmental Review for the Combined License Application for Fermi Nuclear Power Plant, Unit 3
|
| 12/10/08 |
Fermi 3 Combined License Application Notice of Intent To Prepare an Environmental Impact Statement and Conduct Scoping Process
|
| 11/25/08 |
Acceptance for Docketing of the Detroit Edison Company Application for a Combined License for Fermi 3
|
| 10/10/08 |
Acknowledgement of Receipt of the Combined License Application for Fermi 3
|

Requests for Additional Information
For all safety-related RAIs and the applicant's related responses
eRAI Safety Report .
Note that some RAIs and related responses may not be publicly available because they contain sensitive information.
The following table provides access to environmental RAIs and the applicant's subsequent responses.
| RAI Date |
RAI Letter No. and Subject |
Applicant Response |
| 05/12/09 |
Ltr. to Peter Smith - Request for Additional Information Related to the Environmental Review for the Combined License
Application for Fermi Nuclear Power Plant, Unit 3
|
|
| 05/12/09 |
NRC Request for Additional Information, Fermi Nuclear Power Plant, Unit 3 - Environmental Report
|
|
| 05/12/09 |
USACE Request for Additional Information, Fermi - Environmental Report
|
|

Public Meetings
| Date |
Description |
| 01/14/09 |
Fermi 3 Public Scoping Meeting
|
| 08/20/08 |
Public Outreach
|

Contacts
| Contacts for the Fermi COL Application |
| Safety Project Manager |
Mark Tonacci Jerry Hale |
| Environmental Project Manager |
Stephen Lemont |