Combined License Applications for New Reactors
Location of Projected New Nuclear Power Reactors
Applications Received
Bell Bend
Bellefonte, Units 3 & 4
Callaway, Unit 2
Calvert Cliffs, Unit 3
Comanche Peak Units, 3 & 4
Fermi, Unit 3
Grand Gulf, Unit 3
Levy County, Units 1 & 2
Nine Mile Point, Unit 3
North Anna, Unit 3
River Bend Station, Unit 3
Shearon Harris, Units 2 & 3
South Texas Project, Units 3 & 4
Turkey Point, Units 6 & 7
Victoria County Station, Units 1 & 2
Virgil C. Summer, Units 2 & 3
Vogtle, Units 3 & 4
William States Lee III, Units 1 & 2

Comanche Peak Nuclear Power Plant, Units 3 and 4 Application

Comanche Peak
Who:   Luminant Generation Company LLC (Luminant)

What:   Application for a combined license (COL) for a United States Advanced Pressurized Water Reactor (US-APWR) designated as Comanche Peak Nuclear Power Plant, Units 3 and 4

When:   September 19, 2008 (date of application submittal)

Where:   Luminant's Comanche Peak site near Glen Rose in Somervell County, Texas

On this page:

Some links on this page are to documents in our our Agencywide Documents Access and Management System (ADAMS). For additional information, see our Plugins, Viewers, and Other Tools.

Reference Documents

To top of page

Applicant Documents

Some combined license applications were submitted with hyperlinks to various reference documents. Currently, the hyperlinks in those applications are not active. These hyperlinks represent an advanced feature that could be activated when the agency upgrades to web-based ADAMS, at which point these applications and documents such as the Design Control Documents would be linked together. In the interim, and for those applications that do not have the hyperlink feature, the reference documents may be viewed under the Reference Documents section of the combined license application page. In addition, DVDs of the various documents are available by contacting the Public Document Room staff.

Date Description
05/14/09 COLA Update Tracking Report, Revision 2
04/28/09 COLA Update Tracking Report, Revision 1
04/24/09 Mitigative Measures Evaluation
04/21/09 Online Reference Portal
04/02/09 COL Application Update Tracking Report, Revision 0
02/23/09 Comanche Peak, Units 3 & 4, Update Regarding Proprietary Information and Submittal of Nuclear Power Plant Siting Report
02/05/09 Comanche Peak Joint Venture Announcement and Name Change of Nuclear Project Company
12/18/08 Response to request for additional information on 2.4.13
11/10/08 Resolution of Docketing Issues Regarding COL Holder
11/06/08 Resolution of Docketing Issues Regarding FSAR Subsection 2.45.13
11/05/08 Resolution of Docketing Issues Regarding FSAR Subsections 2.5.1, 2.5.2, and 2.5.4
11/04/08 Resolution of Docketing Issues Regarding FSAR 2.5.4, 6.4.4, and the Emergency Plan
09/19/08 Comanche Peak Nuclear Power Plant, Units 3 and 4, Meteorological Data
09/19/08 Luminant transmittal letter for Comanche Peak COLA
  • Part 1 - General and Administrative Information
  • Part 2 - Final Safety Analysis Report (FSAR)
  • Part 3 - Environmental Report
  • Part 4 - Technical Specifications
  • Part 5 - Emergency Plan
  • Part 6 - Limited Work Authorization [Part not used in this application]
  • Part 7 - Generic DCD Departures Report [Part not used in this application]
  • Part 8 - Safeguards / Security Plans [Part not used in this application]
  • Part 9 - [Part not used in this application]
  • Part 10 - Inspections, Tests, Analyses, and Acceptance Criteria (ITAAC) and Proposed License Conditions
  • Part 11 - Enclosures
05/31/08 Comanche Peak Power Plant - Golden-Cheeked Warbler Bird Survey Report

To top of page

Application Review Schedule

Key Milestones Completion Date
Actual - A
Target - T
Application Tendered 09/19/08 - A
Acceptance Review
Acceptance Review Start
09/22/08 - A
Docketing Decision Letter Issued/Acceptance Review Complete
12/02/08 - A
Review Schedule Established/Schedule Letter Issued to Applicant
03/16/09 - A
Safety Review
Phase 1 - Requests for Additional Information (RAIs) Issued to Applicant
11/12/09 - T
Phase 2 - SER with Open Items issued
12/15/10 - T
Phase 3 - ACRS Review of SER with Open Items Complete
03/29/11 - T
Phase 4 - Advanced SER with no Open Items Issued
06/11 - T
Phase 5 - ACRS Review of SER with no Open Items Complete
09/11 - T
Phase 6 - Final SER Issued
12/11 - T
Environmental Review
Phase 1 - Environmental impact statement (EIS) summary report issued
07/02/09
Phase 2 - Draft EIS issued to EPA
03/10/10
Phase 3 - Response to public comments on draft EIS issued
08/26/10
Phase 4 - Final EIS issued to EPA
01/10/11
Hearing
Commission or ASLB hold mandatory hearing
 
License
Commission decision on issuance of COL application
 

Information on Federal Register notices for receipt of the application and opportunity to request a hearing or petition to intervene can be found on the Hearing Opportunities page.

To top of page

NRC Documents

Date Description
04/21/09 Cooperating Agency Participation for the Expansion of the Comanche Peak Nuclear Power Plant Corridor Environmental Impact Statement-USACE 2009-0030
04/15/09 Approval of COL application online reference portal
03/16/09 Reference COL Application Review Schedule
01/30/09 Federal Register Notice and Opportunity to Petition for Leave to Intervene and Order Imposing Procedures for Access to Sensitive Unclassified Non-Safeguards Information for Contention Preparation
12/12/08 Notice of Intent to Prepare an Environmental Impact Statement and Conduct Scoping
12/02/08 Notification for Docketing and Federal Register Notice
11/03/08 Acknowledgment of receipt of the Combined License Application for Comanche Peak, Units 3 and 4

To top of page

Requests for Additional Information

Category RAI Date RAI Letter No. and Subject Applicant Response
Safety 03/30/09 RAI Letter No. 01 SRP Section 14.03 04/01/09
04/01/09 RAI Letter No. 02 SRP Section 5.03.02 04/01/09
04/24/09 RAI Letter No. 03 SRP 2.03 05/08/09
04/24/09 RAI Letter No. 04 SRP 7.04 05/26/09
04/24/09 RAI Letter No. 05 SRP 7.05 05/26/09
04/29/09 RAI Letter No. 06 SRP 10.02  
Environmental   None currently issued  

To top of page

Public Meetings

Date Description
03/09/09 Summary of DCWG Meeting on ISI, IST and Reactor Vessel Pressure Temperature Programs
01/06/09 Environmental Scoping Meeting
10/19/08 Summary of COLA Orientation Meeting
06/12/08 Public Outreach Meeting

To top of page

Contacts

Contacts for the Comanche Peak COL Application
Safety Project Manager Stephen Monarque
Environmental Project Manager Michael Willingham
Contact a Public Affairs Officer