skip navigation links 
 
 Search Options 
Index | Site Map | FAQ | Facility Info | Reading Rm | New | Help | Glossary | Contact Us blue spacer  
secondary page banner Return to NRC Home Page

NRC Acquisition Regulation (48 CFR Chapter 20)

CHAPTER 20 - NUCLEAR REGULATORY COMMISSION

SUBCHAPTER A - GENERAL

PART 2001 - NUCLEAR REGULATORY COMMISSION ACQUISITION REGULATION SYSTEM

Subpart 2001.1 Purpose, Authority, Issuance

Sec.

2001.101 Purpose.
2001.102 Authority.
2001.103 Applicability.
2001.104 Issuance.
2001.104-1 Publication and code arrangement.
2001.104-2 Arrangement of the regulations.
2001.104-3 Copies.
2001.105 Information collection requirements: OMB approval.

Subpart 2001.3 Agency Acquisition Regulations

Sec.

2001.301 Policy.
2001.303 Public participation.

Subpart 2001.4 Deviations from the FAR and the NRCAR

Sec.

2001.402 Policy.
2001.403 Individual deviations.
2001.404 Class deviations.

Subpart 2001.6 Contracting Authority and Responsibilities

Sec.

2001.600-70 Scope of subpart.
2001.601 General.
2001.602-3 Ratification of unauthorized commitments.
2001.603 Selection, appointment, and termination of appointment.

AUTHORITY: 42 U.S.C. 2201; 42 U.S.C. 5841; 41 U.S.C. 418(b).

Subpart 2001.1 Purpose, Authority, Issuance

§2001.101 Purpose.

This subpart establishes Chapter 20, the Nuclear Regulatory Commission Acquisition Regulation (NRCAR), and provides for the codification and publication of uniform policies and procedures for acquisitions by the NRC. The NRCAR is not, by itself, a complete document. It must be used in conjunction with the Federal Acquisition Regulation (FAR) (48 CFR Chapter 1).

§2001.102 Authority.

The NRCAR and the amendments to it are issued by the Senior Procurement Executive under a delegation from the Executive Director for Operations dated May 16, 1997, in accordance with the authority of the Atomic Energy Act of 1954, as amended (42. U.S.C. 161), the Energy Reorganization Act of 1974 (42 U.S.C. 5841, 5872), the Federal Property and Administrative Services Act of 1949 (40 U.S.C. 486(c)), as amended, FAR Subpart 1.3, and other applicable law.

§2001.103 Applicability.

The FAR and NRCAR apply to all NRC acquisitions of supplies and services which obligate appropriated funds, unless exempted by Sections 31 and 161 of the Atomic Energy Act of 1954 as amended, and Section 205 of the Energy Reorganization Act of 1974 as amended. For procurements made from nonappropriated funds, the Director, Division of Contracts and Property Management, shall determine the rules and procedures that apply.

§2001.104 Issuance.

§2001.104-1 Publication and code arrangement.

(a) The NRCAR and its subsequent changes are:

(1) Published in the daily issue of the Federal Register; and

(2) Codified in the Code of Federal Regulations (CFR).

(b) The NRCAR is issued as 48 CFR Chapter 20.

§2001.104-2 Arrangement of the regulations.

(a) General. Chapter 20 is divided into parts, subparts, sections, subsections, paragraphs, and further subdivisions as necessary.

(b) Numbering. The numbering system and part, subpart and section titles used in this Chapter conform with those used in the FAR as follows:

(1) Where Chapter 20 implements the FAR or supplements a parallel part, subpart, section, subsection, or paragraph of the FAR, that implementation or supplementation is numbered and captioned to the FAR part, subpart, section, or subsection being implemented or supplemented, except that the implementation or supplementation is preceded with a 20 or 200 so that there will always be four numbers to the left of the decimal. For example, NRC's implementation of FAR 1.104-1 is shown as §2001.104-1 and the NRC's implementation of FAR 24.1 is shown as §2024.1.

(2) When the NRC supplements material contained in the FAR, it is given a unique number containing the numerals "70" or higher. The rest of the number parallels the FAR part, subpart, section, subsection, or paragraph it is supplementing. For example, Section 170A of the Atomic Energy Act of 1954, as amended, requires a more comprehensive organizational conflict of interest review for NRC than is contemplated by FAR 9.5. This supplementary material is identified as §2009.570.

(3) Where material in the FAR requires no implementation or supplementation, there is no corresponding numbering in the NRCAR. Therefore, there may be gaps in the NRCAR sequence of numbers where the FAR requires no further implementation.

(c) Citation. The NRCAR will be cited in accordance with Office of the Federal Register standards approved for the FAR. Thus, this section when referred to in the NRCAR is cited as §2001.104-2(c). When this section is referred to formally in official documents, such as legal briefs, it should be cited as "48 CFR 2001.104-2(c)." Any section of the NRCAR may be formally identified by the section number, e.g., "NRCAR 2001.104-2." In the NRCAR, any reference to the FAR will be indicated by "FAR" followed by the section number, for example FAR 1-104.

§2001.104-3 Copies.

Copies of the NRCAR in Federal Register and CFR form may be purchased from the Superintendent of Documents, Government Printing Office, Washington, DC 20402.

§2001.105 Information collection requirements: OMB approval.

(a) The Nuclear Regulatory Commission has submitted the information collection requirements contained in this part to the Office of Management and Budget (OMB) for approval as required by the Paperwork Reduction Act (44 U.S.C. 3501 et seq.). The NRC may not conduct or sponsor, and a person is not required to respond to, a collection of information unless it displays a currently valid OMB control number. OMB has approved the information collection requirements contained in this part under control number 3150-0169.

(b) The information collection requirements contained in this part appear in §§2009.570-3, 2009.570-5, 2009.570-8, 2014.201-670, 2027.305-3, 2042.570-1, 2042.803, 2045.371, 2052.204-70, 2052.204-71, 2052.209-70, 2052.209-71, 2052.209-72, 2052.211-70, 2052.211-71, 2052.211-72, 2052.211-72 Alternate 1, 2052.214-71, 2052.214-72, 2052.214-74, 2052.215-70, 2052.215-71, 2052.215-74, 2052.215-75, 2052.215-75 Alternate 1, 2052.215-75 Alternate 2, 2052.215-78, 2052.216-72, 2052.227-70, 2052.235-70, 2052.235-71, 2052.242-70, and 2052.242-71.

(c) This part contains information collection requirements in addition to those approved under the control number specified in paragraph (a) of this section. These information collection requirements and control numbers under which they are approved are as follows:

(1) In §2052.215-77(a) and §2052.215-78(b), NRC Form 445 is approved under control number 3150-0193.

(2) [Reserved]

Subpart 2001.3 Agency Acquisition Regulations

§2001.301 Policy.

Policy, procedures, and guidance of an internal nature will be promulgated through internal NRC issuances such as Management Directives or Division of Contracts and Property Management Instructions.

§2001.303 Public participation.

FAR 1.301 and Section 22 of the Office of Federal Procurement Policy Act, as amended (41 U.S.C. 418b) require rulemaking for substantive acquisition rules, but allow discretion in the matter for other than significant issues meeting the stated criteria. Accordingly, the NRCAR has been promulgated and may be revised from time to time in accordance with FAR 1.301. This procedure for significant subject matter generally involves issuing a notice of proposed rulemaking that invites public comment, review and analysis of comments received, and publication of a final rule. The final rule includes a discussion of the public comments received and describes any changes made as a result of the comments.

Subpart 2001.4 Deviations from the FAR and the NRCAR

§2001.402 Policy.

(a) Deviations from the provisions of the FAR or NRCAR may be granted as specified in this subpart when necessary to meet the specific needs of the requesting office. The development and testing of new techniques and methods of acquisition should not be discouraged simply because the action would require a FAR or NRCAR deviation.

(b) Requests for authority to deviate from the provisions of the FAR or the NRCAR must be signed by the requesting office and submitted to the Director, Division of Contracts and Property Management, in writing, as far in advance as possible. Each request for deviation must contain the following:

(1) A statement of the deviation desired, including identification of the specific paragraph number(s) of the FAR or NRCAR from which a deviation is requested;

(2) The reason why the deviation is considered necessary or would be in the best interest of the Government;

(3) If applicable, the name of the contractor and identification of the contract affected;

(4) A description of the intended effect of the deviation;

(5) A statement of the period of time for which the deviation is needed; and

(6) Any pertinent background information which will contribute to a full understanding of the desired deviation.

§2001.403 Individual deviations.

In individual cases, deviations from either the FAR or the NRCAR will be authorized only when essential to effect only one contracting action or where special circumstances make the deviations clearly in the best interest of the Government. Individual deviations must be authorized in advance by the Director, Division of Contracts and Property Management.

§2001.404 Class deviations.

Class deviations affect more than one contracting action. Where deviations from the FAR or NRCAR are considered necessary for classes of contracts, requests for authority to deviate must be submitted in writing to the Director, Division of Contracts and Property Management, who will consider the submission jointly with the Chairperson of the Civilian Agency Acquisition Council, as appropriate.

Subpart 2001.6 Contracting Authority and Responsibilities

§2001.600-70 Scope of subpart.

This subpart deals with the placement of contracting authority and responsibility within the agency, the selection and designation of contracting officers, and the authority of contracting officers.

§2001.601 General.

(a) Contracting authority vests in the Chairman. The Chairman has delegated this authority to the Executive Director for Operations (EDO). The EDO has delegated this authority to the Deputy Executive Director for Management Services (DEDM). The DEDM has delegated this authority to the Director, Office of Administration (ADM). The Director, ADM, has delegated the authority to the Director, Division of Contracts and Property Management (DCPM), who, in turn, makes contracting officer appointments within Headquarters and Regional Offices. All of these delegations are formal written delegations containing dollar limitations and conditions.

(b) The Director, Division of Contracts Division of Contracts and Property Management, establishes contracting policy throughout the agency; monitors the overall effectiveness and efficiency of the agency's contracting office; establishes controls to assure compliance with laws, regulations, and procedures; and delegates contracting officer authority.

§2001.602-3 Ratification of unauthorized commitments.

(a) The Government is not bound by agreements or contractual commitments made to prospective contractors by persons to whom contracting authority has not been delegated. Any unauthorized commitment may be in violation of the Federal Property and Administrative Services Act, other Federal laws, the FAR, the NRCAR, and good acquisition practice. Certain requirements of law and regulation necessary for the proper establishment of a contractual obligation may not be met under an unauthorized commitment; for example, the certification of the availability of funds, justification for other than full and open competition, competition of sources, determination of contractor responsibility, certification of current pricing data, price/cost analysis, administrative approvals, and negotiation of appropriate contract clauses.

(b) The execution of otherwise proper contracts made by individuals without contracting authority, or by contracting officers in excess of the limits of their delegated authority, may later be ratified. To be effective, the ratification must be in the form of a written procurement document clearly stating that ratification of a previously unauthorized commitment is intended. All ratifications of procurement actions valued at $2,500 or less may be approved by the appropriate regional administrator or Headquarters contracting officer. For any such action, all other terms of Subpart 2001.6 are applicable. All ratification actions exceeding $2,500 shall be approved by the Competition Advocate.

(c) Requests received by contracting officers for ratification of commitments made by personnel lacking contracting authority must be processed as follows:

(1) The Designating Official that is responsible for the office request shall furnish the contracting officer all records and documents concerning the commitment and a complete written statement of facts, including, but not limited to:

(i) A written statement consistent with the complexity and size of the action as to why the contracting office was not used including the name of the employee who made the commitment;

(ii) A statement as to why the proposed contractor was selected;

(iii) A list of other sources considered;

(iv) A description of work performed, or to be performed, or products to be furnished;

(v) The estimated or agreed upon contract price;

(vi) A certification of the appropriated funds available;

(vii) A description of how unauthorized commitments in similar circumstances will be avoided in the future.

(2) The contracting officer shall review the written statement of facts for a determination of approval of all actions valued at $2,500 or less. For actions greater than $2,500, the contracting officer shall forward the written statement of facts to the Competition Advocate through the Director, Division of Contracts and Property Management with any comments or information that should be considered in evaluating the request for ratification.

(3) The NRC legal advisor may be asked for an opinion, advice, or concurrence if there is concern regarding the propriety of the funding source, appropriateness of the expense, or when some other legal issue is involved.

§2001.603 Selection, appointment, and termination of appointment.

The Director, Division of Contracts and Property Management, is authorized by the Director, Office of Administration, to select and appoint contracting officers and to terminate their appointment as prescribed in FAR 1.603. Delegations of contracting officer authority are issued by memorandum which includes a clear statement of the delegated authority, including responsibilities and limitations in addition to the "Certificate of Appointment", SF 1402. The Director, Division of Contracts and Property Management, may delegate micro-purchase authority in accordance with agency procedures. This delegation may be accomplished by written memorandum. (ref. FAR 1.603-3(b))

PART 2002 - DEFINITIONS

Subpart 2002.1 Definitions

Sec.

2002.100 Definitions.

AUTHORITY: 42 U.S.C. 2201; 42 U.S.C. 5841, and 41 U.S.C. 418(b).

Subpart 2002.1 Definitions

§2002.100 Definitions

Agency means the Nuclear Regulatory Commission (NRC).

Agency Head or Head of the Agency means the NRC Executive Director for Operations, for the purposes specified in this regulation and the FAR. This delegation does not extend to internal NRC requirements such as clearance levels and Commission papers which specify higher levels of authority.

Commission means the NRC Commission of five members, or a quorum thereof, sitting as a body, as provided by Section 201 of the Energy Reorganization Act of 1974 (42 U.S.C. 5841).

Competition Advocate means the individual appointed as such by the Agency Head as required by Pub. L. 98-369. The Director, Division of Contracts and Property Management, has been appointed the Competition Advocate for the NRC.

Head of the Contracting Activity means the Director, Division of Contracts and Property Management.

Senior Procurement Executive means the individual appointed as such by the Agency Head pursuant to Executive Order 12352. The Deputy Executive Director for Management Services, has been appointed the NRC Senior Procurement Executive.

Simplified acquisitions means those acquisitions conducted using the methods, policies, and procedures of FAR Part 13 for making purchases of supplies or services.

Task and Delivery Order Ombudsman means the Director, Division of Contracts and Property Management, or designee pursuant to Section 1004(a) of Pub.L. 103-355, the Federal Acquisition Streamlining Act.

PART 2003 - IMPROPER BUSINESS PRACTICES AND PERSONAL CONFLICTS OF INTEREST

Subpart 2003.1 Safeguards

Sec.

2003.101-3 Agency regulations.

Subpart 2003.2 Contractor Gratuities to Government Personnel

Sec.

2003.203 Reporting of suspected violation of the gratuities clause.

AUTHORITY: 42 U.S.C. 2201; 42 U.S.C. 5841; and 41 U.S.C. 418(b).

Subpart 2003.1 Safeguards

§2003.101-3 Agency regulations.

Standards of conduct for Federal employees are published in 5 CFR Parts 2635 and 5801. Requirements for financial disclosure are published in 5 CFR Part 2634.

Subpart 2003.2 Contractor Gratuities to Government Personnel

§2003.203 Reporting suspected violations of the gratuities clause.

(a) Suspected violations of the "Gratuities" clause, FAR 52.203.3, must be reported orally or in writing directly to the NRC Office of the Inspector General. A report must include all facts and circumstances related to the case. Refer to 5 CFR 2635 for an explanation regarding what is prohibited and what is permitted.

(b) When appropriate, discussions with the contracting officer or a higher procurement official, procurement policy staff, and the procurement legal advisor before filing a report are encouraged.

PART 2004 - ADMINISTRATIVE MATTERS

Subpart 2004.4 Safeguarding Classified Information Within Industry

Sec.

2004.4 Contract clauses.

AUTHORITY: 42 U.S.C. 2201; 42 U.S.C. 5841; and 41 U.S.C. 418(b).

§2004.404 Contract clauses.

(a) The contracting officer shall insert the clause at §2052.204-70 Security, in all solicitations and contracts under which the contractor may have access to, or contact with, classified information, including National Security information, restricted data, formerly restricted data, and other classified data.

(b) The contracting officer shall insert the clause § 2052.204-71 Site Access Badge Requirements, in all solicitations and contracts under which the contractor will require access to Government facilities. The clause may be altered to reflect any special conditions to be applied to foreign nationals.

SUBCHAPTER B - COMPETITION AND ACQUISITION PLANNING

PART 2005 - PUBLICIZING CONTRACT ACTIONS

Subpart 2005.5 Paid Advertisements

Sec.

2005.502 Authority.

AUTHORITY: (42 U.S.C. 2201); (42 U.S.C. 5841); 41 U.S.C. 401 et seq.

Subpart 2005.5 Paid Advertisements

§2005.502 Authority.

Before placing paid advertisements in newspapers and trade journals to publicize contract actions, written authority must be obtained from the Director, Division of Contracts and Property Management, for Headquarters activities, or the Director, Division of Resource Management and Administration, within each regional office for a regional procurement.

PART 2009 - CONTRACTOR QUALIFICATIONS

Subpart 2009.1 Responsible Prospective Contractors

Sec.

2009.100 NRC policy.
2009.105-70 Contract provisions.

Subpart 2009.4 Debarment, Suspension, and Ineligibility

Sec.

2009.403 Definitions.
2009.404 Consolidated lists of parties excluded from Federal procurement or non-procurement programs.
2009.405 Effect of listing.
2009.405-1 Continuation of current contracts.
2009.405-2 Restrictions on subcontracting.
2009.406 Debarment.
2009.406-3 Procedures.
2009.407 Suspension.
2009.407-3 Procedures.
2009-470 Appeals.

Subpart 2009.5 Organizational Conflicts of Interest

Sec.

2009.500 Scope of subpart.
2009.570 NRC organizational conflicts of interest.
2009.570-1 Scope of policy.
2009.570-2 Definitions.
2009.570-3 Criteria for recognizing contractor organizational conflicts of interest.
2009.570-4 Representation.
2009.570-5 Contract clauses.
2009.570-6 Evaluation, findings, and contract award.
2009.570-7 Conflicts identified after award.
2009.570-8 Subcontracts.
2009.570-9 Waiver.
2009.570-10 Remedies.

AUTHORITY: 42 U.S.C. 2201; 42 U.S.C. 5841; 41 U.S.C 418(b).

Subpart 2009.1 Responsible prospective contractors.

§2009.100 NRC policy.

(a) It is NRC policy that only competitively awarded contracts shall be placed with an individual who was employed by the NRC within two years from the date of the Request for Procurement Action. This policy also applies to:

(1) The noncompetitive award of contracts to organizations where former NRC employees have dominant ownership interests in the organization, such as partners or majority stockholders;

(2) The noncompetitive award of contracts to organizations where former NRC employees have dominant management interests, such as principal officers, or where the organization is predominantly staffed by former NRC employees; and

(3) The noncompetitive award of contracts, task orders or other NRC work assignments where the particular assignment is to be performed by designated former NRC employees, including principal investigators, key personnel, and others who will perform more than a nominal amount of the work in question.

(b) The following procurement actions are considered noncompetitive for the purposes of this policy:

(1) Contracts awarded noncompetitively under the Small Business Administration's 8(a) Program;

(2) Individual task orders if the former employee was not identified as "key personnel" in a proposal which was evaluated under competitive procedures;

(3) Unsolicited proposals;

(4) Subcontracts that require review for the purpose of granting consent under NRC prime contracts.

(c) The term NRC employee includes special Government employees performing services for NRC as experts, advisors, consultants, or members of advisory committees, if

(1) The contract arises directly out of the individual's activity as a special employee;

(2) The individual is in a position to influence the award of the contract; or

(3) The Contracting Officer determines that another conflict of interest exists.

(d) A justification explaining why it is in the best interest of the Government to contract with an individual or firm described in paragraphs (a) and (b) of this section on a noncompetitive basis may be approved by the Senior Procurement Executive after consulting with the Executive Director for Operations. This is in addition to any justification and approvals which may be required by the FAR for use of other than full and open competition.

(e) Nothing in this policy statement relieves former employees from obligations prescribed by law, such as 18 U.S.C. 207, Restrictions on Former Officers, Employees, and Elected Officials of the Executive and Legislative Branches.

§2009.105-70 Contract provisions.

The contracting officer shall insert the following provisions in all solicitations:

(a) §2052.209-70 Current/Former Agency Employee Involvement.

Subpart 2009.4 Debarment, Suspension, and Ineligibility

§2009.403 Definitions.

As used in §2009.4:

Debarring official means the Senior Procurement Executive.

Suspending official means the Senior Procurement Executive.

§2009.404 Consolidated list of parties excluded from Federal procurement or non-procurement programs.

The contracting officer responsible for the contract affected by the debarment or suspension shall perform the actions required by FAR 9.404(c)(1)-(6).

§2009.405 Effect of listing.

Compelling reasons are considered to be present where failure to contract with the debarred or suspended contractor would seriously harm the agency's programs and prevent accomplishment of mission requirements. The Senior Procurement Executive is authorized to make the determinations under FAR 9.405. Requests for these determinations must be submitted from the Head of the Contracting Activity, through the Director, Office of Administration, to the Senior Procurement Executive.

§2009.405-1 Continuation of current contracts.

The Head of the Contracting Activity is authorized to make the determination to continue contracts or subcontracts in existence at the time the contractor was debarred, suspended, or proposed for debarment in accordance with FAR 9.405-1.

§2009.405-2 Restrictions on subcontracting.

The Head of the Contracting Activity is authorized to approve subcontracts with debarred or suspended subcontractors under FAR 9.405-2.

§2009.406 Debarment.

§2009.406-3 Procedures.

(a) Investigation and referral.

(1) When a contracting officer becomes aware of possible irregularities or any information which may be sufficient cause for debarment, the contracting officer must first submit a complete statement of facts (including a copy of any criminal indictments, if applicable) and a recommendation for action to the Head of the Contracting Activity. If the contracting officer's statement of facts indicates misconduct on the part of the contractor in regard to an NRC contract, the Head of the Contracting Activity will refer the matter of misconduct to the Inspector General to determine if an investigation is required prior to referring the case to the debarring official.

(2) To the extent the Head of the Contracting Activity believes that sufficient grounds for debarment exist, independent of any pending investigation by the Inspector General, the Head of the Contracting Activity shall immediately forward the case, without reference to any pending investigation, and a recommendation for action to the Senior Procurement Executive for review. In such circumstances, the Head of the Contracting Activity will take no additional action in regard to a specific matter of misconduct referred to the Inspector General prior to consulting with the Inspector General.

(b) Decision-making process. If, after reviewing the recommendations and consulting with the Office of the General Counsel and, if appropriate, the Office of the Inspector General, the debarring official determines debarment is justified, the debarring official shall initiate the proposed debarment in accordance with FAR 9.406-3(c) and notify the Head of the Contracting Activity of the action taken. If the contractor fails to submit a timely written response within 30 days after receipt of the notice in accordance with FAR 9.406-3(c)(4), the debarring official may notify the contractor in accordance with FAR 9.406-3(d) that the contractor is debarred.

(c) Fact-finding proceedings. For actions listed under FAR 9.406-3(b)(2), the contractor shall be given the opportunity to appear at an informal hearing. The hearing should be held at a location and time that is convenient to the parties concerned and no later than 30 days after the contractor received the notice, if at all possible. The contractor and any specifically named affiliates may be represented by counsel or any duly authorized representative. Witnesses may be called by either party. The proceedings must be conducted expeditiously and in such a manner that each party will have an opportunity to present all information considered pertinent to the proposed debarment.

§2009.407 Suspension.

§2009.407-3 Procedures.

(a) Investigation and referral.

(1) When a contracting officer becomes aware of possible irregularities or any information which may be sufficient cause for suspension, the contracting officer must first submit a complete statement of facts (including a copy of any criminal indictments, if applicable) and a recommendation for action to the Head of the Contracting Activity. If the contracting officer's statement of facts indicates misconduct on the part of the contractor in regard to an NRC contract, the Head of the Contracting Activity will refer the matter of misconduct to the Inspector General to determine if an investigation is required prior to referring the case to the suspension official.

(2) To the extent the Head of the Contracting Activity believes that sufficient grounds for debarment exist, independent of any pending investigation by the Inspector General, the Head of the Contracting Activity shall immediately forward the case, without reference to any pending investigation, and a recommendation for action to the Senior Procurement Executive for review. In such circumstances, the Head of the Contracting Activity will take no additional action in regard to a specific matter of misconduct referred to the Inspector General prior to consulting with the Inspector General.

(b) Decision-making process. If, after reviewing the recommendations and consulting with the Office of the General Counsel, and if appropriate, the Office of the Inspector General, the suspending official determines suspension is justified, the suspending official shall initiate the proposed suspension in accordance with FAR 9.407-3(b)(2). The contractor shall be given the opportunity to appear at an informal hearing, similar in nature to the hearing for debarments as discussed in FAR 9.406-3(b)(2). If the contractor fails to submit a timely written response within 30 days after receipt of the notice in accordance with FAR 9.407-3(c)(5), the suspending official may notify the contractor in accordance with FAR 9.407-3(d) that the contractor is suspended.

§2009.470 Appeals.

A debarred or suspended contractor may appeal the debarring/suspending official's decision by mailing or otherwise furnishing a written notice within 90 days from the date of the decision to the Executive Director for Operations. A copy of the notice of appeal must be furnished to the debarring/suspending official.

Subpart 2009.5 Organizational Conflicts of Interest

§2009.500 Scope of subpart.

In accordance with 42 U.S.C. 2210a., NRC acquisitions are processed in accordance with §2009.570, which takes precedence over FAR 9.5 with respect to organizational conflicts of interest. Where non-conflicting guidance appears in FAR 9.5, that guidance must be followed.

§2009.570 NRC organizational conflicts of interest.

§2009.570-1 Scope of policy.

(a) It is the policy of NRC to avoid, eliminate, or neutralize contractor organizational conflicts of interest. The NRC achieves this objective by requiring all prospective contractors to submit information describing relationships, if any, with organizations or persons (including those regulated by the NRC) which may give rise to actual or potential conflicts of interest in the event of contract award.

(b) Contractor conflict of interest determinations cannot be made automatically or routinely. The application of sound judgment on virtually a case-by-case basis is necessary if the policy is to be applied to satisfy the overall public interest. It is not possible to prescribe in advance a specific method or set of criteria which would serve to identify and resolve all of the contractor conflict of interest situations that might arise. However, examples are provided in these regulations to guide application of this policy guidance. The ultimate test is as follows: Might the contractor, if awarded the contract, be placed in a position where its judgment may be biased, or where it may have an unfair competitive advantage?

(c) The conflict of interest rule contained in this subpart applies to contractors and offerors only. Individuals or firms who have other relationships with the NRC (e.g., parties to a licensing proceeding) are not covered by this regulation. This rule does not apply to the acquisition of consulting services through the personnel appointment process, NRC agreements with other Government agencies, international organizations, or state, local, or foreign Governments. Separate procedures for avoiding conflicts of interest will be employed in these agreements, as appropriate.

§2009.570-2 Definitions.

Affiliates means business concerns which are affiliates of each other when either directly or indirectly one concern or individual controls or has the power to control another, or when a third party controls or has the power to control both.

Contract means any contractual agreement or other arrangement with the NRC except as provided in §2009.570-1(c).

Contractor means any person, firm, unincorporated association, joint venture, co-sponsor, partnership, corporation, affiliates thereof, or their successors in interest, including their chief executives, directors, key personnel (identified in the contract), proposed consultants or subcontractors, which are a party to a contract with the NRC.

Evaluation activities means any effort involving the appraisal of a technology, process, product, or policy.

Offeror or prospective contractor means any person, firm, unincorporated association, joint venture, co-sponsor, partnership, corporation, or their affiliates or successors in interest, including their chief executives, directors, key personnel, proposed consultants, or subcontractors, submitting a bid or proposal, solicited or unsolicited, to the NRC to obtain a contract.

Organizational conflicts of interest means that a relationship exists whereby a contractor or prospective contractor has present or planned interests related to the work to be performed under an NRC contract which:

(1) May diminish its capacity to give impartial, technically sound, objective assistance and advice, or may otherwise result in a biased work product; or

(2) May result in its being given an unfair competitive advantage.

Potential conflict of interest means that a factual situation exists that suggests that an actual conflict of interest may arise from award of a proposed contract. The term potential conflict of interest is used to signify those situations that

(1) Merit investigation before contract award to ascertain whether award would give rise to an actual conflict; or

(2) Must be reported to the contracting officer for investigation if they arise during contract performance.

Research means any scientific or technical work involving theoretical analysis, exploration, or experimentation.

Subcontractor means any subcontractor of any tier who performs work under a contract with the NRC except subcontracts for supplies and subcontracts in amounts not exceeding $10,000.

Technical consulting and management support services means internal assistance to a component of the NRC in the formulation or administration of its programs, projects, or policies which normally require that the contractor be given access to proprietary information or to information that has not been made available to the public. These services typically include assistance in the preparation of program plans, preliminary designs, specifications, or statements of work.

§2009.570-3 Criteria for recognizing contractor organizational conflicts of interest.

(a) General.

(1) Two questions will be asked in determining whether actual or potential organizational conflicts of interest exist:

(i) Are there conflicting roles which might bias an offeror's or contractor's judgment in relation to its work for the NRC?

(ii) May the offeror or contractor be given an unfair competitive advantage based on the performance of the contract?

(2) NRC's ultimate determination that organizational conflicts of interest exist will be made in light of common sense and good business judgment based upon the relevant facts. While it is difficult to identify and to prescribe in advance a specific method for avoiding all of the various situations or relationships that might involve potential organizational conflicts of interest, NRC personnel will pay particular attention to proposed contractual requirements that call for the rendering of advice, consultation or evaluation activities, or similar activities that directly lay the groundwork for the NRC's decisions on regulatory activities, future procurements, and research programs. Any work performed at an applicant or licensee site will also be closely scrutinized by the NRC staff.

(b) Situations or relationships. The following situations or relationships may give rise to organizational conflicts of interest:

(1) The offeror or contractor shall disclose information that may give rise to organizational conflicts of interest under the following circumstances. The information may include the scope of work or specification for the requirement being performed, the period of performance, and the name and telephone number for a point of contact at the organization knowledgeable about the commercial contract.

(i) Where the offeror or contractor provides advice and recommendations to the NRC in the same technical area where it is also providing consulting assistance to any organization regulated by the NRC.

(ii) Where the offeror or contractor provides advice to the NRC on the same or similar matter on which it is also providing assistance to any organization regulated by the NRC.

(iii) Where the offeror or contractor evaluates its own products or services, or has been substantially involved in the development or marketing of the products or services of another entity.

(iv) Where the award of a contract would result in placing the offeror or contractor in a conflicting role in which its judgment may be biased in relation to its work for the NRC, or would result in an unfair competitive advantage for the offeror or contractor.

(v) Where the offeror or contractor solicits or performs work at an applicant or licensee site while performing work in the same technical area for the NRC at the same site.

(2) The contracting officer may request specific information from an offeror or contractor or may require special contract clauses such as provided in §2009.570-5(b) in the following circumstances:

(i) Where the offeror or contractor prepares specifications that are to be used in competitive procurements of products or services covered by the specifications.

(ii) Where the offeror or contractor prepares plans for specific approaches or methodologies that are to be incorporated into competitive procurements using the approaches or methodologies.

(iii) Where the offeror or contractor is granted access to information not available to the public concerning NRC plans, policies, or programs that could form the basis for a later procurement action.

(iv) Where the offeror or contractor is granted access to proprietary information of its competitors.

(v) Where the award of a contract might result in placing the offeror or contractor in a conflicting role in which its judgment may be biased in relation to its work for the NRC or might result in an unfair competitive advantage for the offeror or contractor.

(c) Policy application guidance. The following examples are illustrative only and are not intended to identify and resolve all contractor organizational conflict of interest situations.

(1)(i) Example. The ABC Corp., in response to a Request For Proposal (RFP), proposes to undertake certain analyses of a reactor component as called for in the RFP. The ABC Corp. is one of several companies considered to be technically well qualified. In response to the inquiry in the RFP, the ABC Corp. advises that it is currently performing similar analyses for the reactor manufacturer.

(ii) Guidance. An NRC contract for that particular work normally would not be awarded to the ABC Corp. because the company would be placed in a position in which its judgment could be biased in relationship to its work for the NRC. Because there are other well-qualified companies available, there would be no reason for considering a waiver of the policy.

(2)(i) Example. The ABC Corp., in response to an RFP, proposes to perform certain analyses of a reactor component that is unique to one type of advanced reactor. As is the case with other technically qualified companies responding to the RFP, the ABC Corp. is performing various projects for several different utility clients. None of the ABC Corp. projects have any relationship to the work called for in the RFP. Based on the NRC evaluation, the ABC Corp. is considered to be the best qualified company to perform the work outlined in the RFP.

(ii) Guidance. An NRC contract normally could be awarded to the ABC Corp. because no conflict of interest exists which could motivate bias with respect to the work. An appropriate clause would be included in the contract to preclude the ABC Corp. from subsequently contracting for work with the private sector that could create a conflict during the performance of the NRC contract. For example, ABC Corp. would be precluded from the performance of similar work for the company developing the advanced reactor mentioned in the example.

(3)(i) Example. The ABC Corp., in response to a competitive RFP, submits a proposal to assist the NRC in revising NRC's guidance documents on the respiratory protection requirements of 10 CFR Part 20. ABC Corp. is the only firm determined to be technically acceptable. ABC Corp. has performed substantial work for regulated utilities in the past and is expected to continue similar efforts in the future. The work has and will cover the writing, implementation, and administration of compliance respiratory protection programs for nuclear power plants.

(ii) Guidance. This situation would place the firm in a role where its judgment could be biased in relationship to its work for the NRC. Because the nature of the required work is vitally important in terms of the NRC's responsibilities and no reasonable alternative exists, a waiver of the policy, in accordance with §2009.570-9 may be warranted. Any waiver must be fully documented in accordance with the waiver provisions of this policy with particular attention to the establishment of protective mechanisms to guard against bias.

(4)(i) Example. The ABC Corp. submits a proposal for a new system to evaluate a specific reactor component's performance for the purpose of developing standards that are important to the NRC program. The ABC Corp. has advised the NRC that it intends to sell the new system to industry once its practicability has been demonstrated. Other companies in this business are using older systems for evaluation of the specific reactor component.

(ii) Guidance. A contract could be awarded to the ABC Corp. if the contract stipulates that no information produced under the contract will be used in the contractor's private activities unless this information has been reported to the NRC. Data on how the reactor component performs, which is reported to the NRC by contractors, will normally be disseminated by the NRC to others to preclude an unfair competitive advantage. When the NRC furnishes information about the reactor component to the contractor for the performance of contracted work, the information may not be used in the contractor's private activities unless the information is generally available to others. Further, the contract will stipulate that the contractor will inform the NRC contracting officer of all situations in which the information, developed about the performance of the reactor component under the contract, is proposed to be used.

(5)(i) Example. The ABC Corp., in response to a RFP, proposes to assemble a map showing certain seismological features of the Appalachian fold belt. In accordance with the representation in the RFP and §2009.570-3(b)(1)(i), ABC Corp. informs the NRC that it is presently doing seismological studies for several utilities in the eastern United States, but none of the sites are within the geographic area contemplated by the NRC study.

(ii) Guidance. The contracting officer would normally conclude that award of a contract would not place ABC Corp. in a conflicting role where its judgment might be biased. Section 2052.209-72(c) Work for Others, would preclude ABC Corp. from accepting work which could create a conflict of interest during the term of the NRC contract.

(6)(i) Example. AD Division of ABC Corp., in response to a RFP, submits a proposal to assist the NRC in the safety and environmental review of applications for licenses for the construction, operation, and decommissioning of fuel cycle facilities. ABC Corp. is divided into two separate and distinct divisions, AD and BC. The BC Division performs the same or similar services for industry. The BC Division is currently providing the same or similar services required under the NRC's contract for an applicant or licensee.

(ii) Guidance. An NRC contract for that particular work would not be awarded to the ABC Corp. The AD Division could be placed in a position to pass judgment on work performed by the BC Division, which could bias its work for NRC. Further, the Conflict of Interest provisions apply to ABC Corp. and not to separate or distinct divisions within the company. If no reasonable alternative exists, a waiver of the policy could be sought in accordance with §2009.570-9.

(7)(i) Example. The ABC Corp. completes an analysis for NRC of steam generator tube leaks at one of a utility's six sites. Three months later, ABC Corp. is asked by this utility to perform the same analysis at another of its sites.

(ii) Guidance. Section 2052.290-72(c)(3) would prohibit the contractor from beginning this work for the utility until one year after completion of the NRC work at the first site.

(8)(i) Example. ABC Corp. is assisting NRC in a major on-site analysis of a utility's redesign of the common areas between its twin reactors. The contract is for two years with an estimated value of $5 million. Near the completion of the NRC work, ABC Corp. requests authority to solicit for a $100K contract with the same utility to transport spent fuel to a disposal site. ABC Corp. is performing no other work for the utility.

(ii) Guidance. The Contracting Officer would allow the contractor to proceed with the solicitation because it is not in the same technical area as the NRC work; and the potential for technical bias by the contractor because of financial ties to the utility is slight due to the relative value of the two contracts.

(9)(i) Example. The ABC Corp. is constructing a turbine building and installing new turbines at a reactor site. The contract with the utility is for five years and has a total value of $100 million. ABC Corp. has responded to an NRC Request For Proposal requiring the contractor to participate in a major team inspection unrelated to the turbine work at the same site. The estimated value of the contract is $75K.

(ii) Guidance. An NRC contract would not normally be awarded to ABC Corp. because these factors create the potential for financial loyalty to the utility that may bias the technical judgment of the contractor.

(d) Other considerations.

(1) The fact that the NRC can identify and later avoid, eliminate, or neutralize any potential organizational conflicts arising from the performance of a contract is not relevant to a determination of the existence of conflicts prior to the award of a contract.

(2) It is not relevant that the contractor has the professional reputation of being able to resist temptations which arise from organizational conflicts of interest, or that a follow-on procurement is not involved, or that a contract is awarded on a competitive or a sole source basis.

§2009.570-4 Representation.

(a) The following procedures are designed to assist the NRC contracting officer in determining whether situations or relationships exist which may constitute organizational conflicts of interest with respect to a particular offeror or contractor. The procedures apply to small purchases meeting the criteria stated in the following paragraph (b) of this section.

(b) The organizational conflicts of interest representation provision at §2052.209-71 must be included in solicitations and contracts resulting from unsolicited proposals. The contracting officer must also include this provision for task orders and contract modifications for new work for:

(1) Evaluation services or activities;

(2) Technical consulting and management support services;

(3) Research; and

(4) Other contractual situations where special organizational conflicts of interest provisions are noted in the solicitation and would be included in the resulting contract. This representation requirement also applies to all modifications for additional effort under the contract except those issued under the "Changes" clause. Where, however, a statement of the type required by the organizational conflicts of interest representation provisions has previously been submitted with regard to the contract being modified, only an updating of the statement is required.

(c) The offeror may, because of actual or potential organizational conflicts of interest, propose to exclude specific kinds of work contained in a RFP unless the RFP specifically prohibits the exclusion. Any such proposed exclusion by an offeror will be considered by the NRC in the evaluation of proposals. If the NRC considers the proposed excluded work to be an essential or integral part of the required work and its exclusion would be to the detriment of the competitive posture of the other offerors, the NRC shall reject the proposal as unacceptable.

(d) The offeror's failure to execute the representation required by paragraph (b) of this section with respect to an invitation for bids is considered to be a minor informality. The offeror will be permitted to correct the omission.

§2009.570-5 Contract clauses.

(a) General contract clause. All contracts and simplified acquisitions of the types set forth in §2009.570-4(b) must include the clause entitled, "Contractor Organizational Conflicts of Interest," set forth in §2052.209-72.

(b) Other special contract clauses. If it is determined from the nature of the proposed contract that an organizational conflict of interest exists, the contracting officer may determine that the conflict can be avoided, or, after obtaining a waiver in accordance with §2009.570-9, neutralized through the use of an appropriate special contract clause. If appropriate, the offeror may negotiate the terms and conditions of these clauses, including the extent and time period of any restriction. These clauses include but are not limited to:

(1) Hardware exclusion clauses which prohibit the acceptance of production contracts following a related non-production contract previously performed by the contractor;

(2) Software exclusion clauses;

(3) Clauses which require the contractor (and certain of its key personnel) to avoid certain organizational conflicts of interest; and

(4) Clauses which provide for protection of confidential data and guard against its unauthorized use.

§2009.570-6 Evaluation, findings, and contract award.

The contracting officer shall evaluate all relevant facts submitted by an offeror and other relevant information. After evaluating this information against the criteria of §2009.570-3, the contracting officer shall make a finding of whether organizational conflicts of interest exist with respect to a particular offeror. If it has been determined that real or potential conflicts of interest exist, the contracting officer shall:

(a) Disqualify the offeror from award;

(b) Avoid or eliminate such conflicts by appropriate measures; or

(c) Award the contract under the waiver provision of §2009.570-9.

§2009.570-7 Conflicts identified after award.

If potential organizational conflicts of interest are identified after award with respect to a particular contractor and the contracting officer determines that conflicts do exist and that it would not be in the best interest of the Government to terminate the contract, as provided in the clauses required by §2009.570-5, the contracting officer shall take every reasonable action to avoid, eliminate, or, after obtaining a waiver in accordance with §2009.570-9, neutralize the effects of the identified conflict.

§2009.570-8 Subcontracts.

The contracting officer shall require offerors and contractors to submit a representation statement from all subcontractors (other than a supply subcontractor) and consultants performing services in excess of $10,000 in accordance with §2009.570-4(b). The contracting officer shall require the contractor to include contract clauses in accordance with §2009.570-5 in consultant agreements or subcontracts involving performance of work under a prime contract.

§2009.570-9 Waiver.

(a) The contracting officer determines the need to seek a waiver for specific contract awards with the advice and concurrence of the program office director and legal counsel. Upon the recommendation of the Senior Procurement Executive, and after consultation with legal counsel, the Executive Director for Operations may waive the policy in specific cases if he determines that it is in the best interest of the United States to do so.

(b) Waiver action is strictly limited to those situations in which:

(1) The work to be performed under contract is vital to the NRC program;

(2) The work cannot be satisfactorily performed except by a contractor whose interests give rise to a question of conflict of interest.

(3) Contractual and/or technical review and surveillance methods can be employed by the NRC to neutralize the conflict.

(c) The justification and approval documents for any waivers must be placed in the NRC Public Document Room.

§2009.570-10 Remedies.

In addition to other remedies permitted by law or contract for a breach of the restrictions in this subpart or for any intentional misrepresentation or intentional nondisclosure of any relevant interest required to be provided for this section, the NRC may debar the contractor from subsequent NRC contracts.

PART 2011 - DESCRIBING AGENCY NEEDS

AUTHORITY: 42 U.S.C. 2201; 42 U.S.C. 5841; and 41 U.S.C. 418(b)

Subpart 2011.4 Delivery or Performance Schedules Contract Clauses

§2011.104-70 NRC Clauses.

(a) The contracting officer shall insert the clause at §2052.211-70 Preparation of Technical Reports, when deliverables include a technical report.

(b) The contracting officer shall insert the clause at §2052.211-71 Technical Progress Report, in all solicitations and contracts except

(1) Firm fixed price; or

(2) Indefinite-delivery contracts to be awarded on a time-and-materials or labor-hour basis, or that provide for issuing delivery orders for specific products/services (line items).

(c) The contracting officer shall insert the clause at §2052.211-72 Financial Status Report, in applicable cost reimbursement solicitations and contracts when detailed assessment of costs is warranted and a Contractor Spending Plan is required. The contracting officer shall use the clause at §2052.211-72 Financial Status Report - Alternate 1 when no Contractor Spending Plan is required.

(d) The contracting officer may alter clauses §2052.211-70, -71, - 72 and -72 Alternate 1 before issuing the solicitation or during competition by solicitation amendment. Reporting requirements should be set at a meaningful and productive frequency. Insignificant changes may also be made by the contracting officer on a case-by-case basis during negotiations without solicitation amendment.

SUBCHAPTER C - CONTRACTING METHODS AND CONTRACT TYPES

PART 2013 - SIMPLIFIED ACQUISITION PROCEDURES (reserved)

PART 2014 - SEALED BIDDING

Subpart 2014.2 Solicitation of Bids

Sec.

2014.201 Preparation of invitation for bids.
2014.201-670 Solicitation provisions.

Subpart 2014.4 Opening of Bids and Award of Contract

2014.407 Mistakes in bids.
2014.407-3 Other mistakes disclosed before award.

AUTHORITY: 42 U.S.C. 2201; 42 U.S.C. 5841; and 41 U.S.C. 418(b).

Subpart 2014.2 Solicitation of Bids

§2014.201 Preparation of invitation for bids.
§2014.201-670 Solicitation provisions.

(a) The contracting officer may insert the provision at §2052.214-70, Prebid Conference, in Invitations for Bids (IFB) where there will be a prebid conference. This provision may be altered by the contracting officer to fit the circumstances of the procurement.

(b) The contracting officer may insert the provision at §2052.214-71, Bidder Qualifications and Past Experience in IFBs on an optional basis to fit the circumstances of the requirement;

(c) The contracting officer shall insert the provision at §2052.214-72 Bid Evaluation in all IFBs. Paragraph(f) of this provision is optional.

(d) The contracting officer shall insert the provision at §2052.214-73 Timely Receipt of Bids in all IFBs.

(e) The contracting officer shall insert the provision at §2052.214-74 Disposition of Bids in all IFBs.

Subpart 2014.4 Opening of Bids and Award of Contract

§2014.407 Mistakes in bids.

§2014.407-3 Other mistakes disclosed before award.

The Director, Division of Contracts and Property Management, is delegated the authority to make the determinations concerning mistakes in bids, including those with obvious clerical errors, discovered prior to award. These determinations will be concurred in by legal counsel prior to notification of the bidder.

§2014.407-4 Mistakes after award

The cognizant contracting officer is delegated the authority to make determinations concerning mistakes disclosed after award in accordance with FAR 14.407-4. These determinations will be concurred in by legal counsel prior to notification of the contractor.

PART 2015 - CONTRACTING BY NEGOTIATION

Subpart 2015.2 Solicitation and Receipt of Proposals and Information

Sec.

2015.209-70 Solicitation provisions and contract clause

Subpart 2015.3 - Source Selection Process and Techniques

Sec.

2015.300 Scope of part.
2015.303 Responsibilities.
2015.304 Evaluation factors.
2015.305 Proposal evaluation.

Subpart 2015.6 Unsolicited Proposals

Sec.

2015.606 Agency procedures.
2015.606-1 Receipt and initial review.

AUTHORITY: 42 U.S.C. 2201; 42 U.S.C. 5841; and 41 U.S.C. 418(b).

Subpart 2015.2 Solicitation and Receipt of Proposals and Implementation

§2015.209-70 Solicitation provisions and contract clauses.

(a) The contracting officer shall insert the following clauses in solicitations and contracts that are applicable to the requirement:

(1) Section 2052.215-70, Key Personnel in applicable solicitations and contracts;

(2) (i) Section 2052.215-71, Project Officer Authority in applicable solicitations and contracts for cost-reimbursement, cost-plus-fixed-fee, cost-plus-award-fee, cost sharing, labor-hour or time-and-materials, including task order contracts. This clause and the following alternate clauses are intended for experienced, trained project officers, and may be altered to delete duties where appropriate:

(ii) Section 2052.215-71 Alternate 1. For solicitations for issuance of delivery orders for specific products/services;

(iii) Section 2052.215-71 Alternate 2. For solicitations for firm fixed price contracts, with paragraph (b)(1) of Alternate 1 deleted and the remainder of the clause renumbered.

(3) The contracting officer shall insert the provision at §2052.215-72, Timely Receipt of Proposals in all solicitations;

(4) The contracting officer shall insert the provision at §2052.215-73, Award Notification and Commitment of Public Funds in all solicitations; and

(5) The contracting officer shall insert the provision at §2052.215-74, Disposition of Proposals in all solicitations.

(b) The contracting officer may insert the following provisions in all solicitations as applicable. These provisions may be altered to fit the circumstances of the requirement. These provisions shall be tailored to assure that all sections of the instructions for the Technical and Management Proposal, or Oral Presentation and Supporting Documentation, reflect a one-to-one relationship to the evaluation criteria:

(1) Section 2052.215-75, Proposal Presentation and Format for negotiated procurements for cost type contracts;

(2) Section 2052.215-75 Alternate 1 may be used for all solicitations for negotiated task order contracts;

(3) Section 2015.215-75 Alternate 2 may be used for all solicitations for negotiated fixed price, labor hour, or time and materials contracts:

(c) The contracting officer shall insert the provision at §2052.215-76, PreProposal Conference, in solicitations which include a PreProposal conference. This provision may be altered to fit the circumstances of the requirement.

(d) The contracting officer shall insert the following clauses in solicitations and contracts as applicable:

(1) Section 2052.215-77, Travel Approvals and Reimbursement, must be inserted in cost reimbursement solicitations and contracts which require travel but do not set a specific ceiling amount on that travel. Requests for foreign travel must be submitted to the NRC 30 days in advance of the travel date.

(2) Section 2052.215-78, Travel Approvals and Reimbursement - Alternate 1, shall be inserted in cost reimbursement solicitations and contracts which include a ceiling amount on travel. Requests for foreign travel must be submitted to the NRC 30 days in advance of the travel.

(e) The contracting officer shall include the following provisions in all solicitations for competitive procurements to describe the relationship of technical considerations to cost considerations. The contracting officer may make appropriate changes to these provisions to accurately reflect other evaluation procedures, such as evaluation of proposals against mandatory criteria and bench marking criteria for Information Technology (IT) procurements:

(1) Section 2052.215-79 Contract Award and Evaluation of Proposals, shall be included in all solicitations where technical merit is more important than cost,

(2) Section 2052.215-79 Alternate 1 must be included when proposals are to be evaluated on a lowest price, technically acceptable basis.

(3) Section 2052.215-79 Alternate 2 shall be included where cost and technical merit are of equal significance.

Subpart 2015.3 - Source Selection Processes and Techniques

§2015.300 Scope of subpart.

This subpart applies to all contracts awarded on a competitive basis in accordance with FAR Part 15. This subpart does not apply to contracts awarded on a non-competitive basis to the Small Business Administration under Section 8(a) of the Small Business Act.

§2015.303 Responsibilities.

(a) The source selection authority is the contracting officer. The contracting officer, acting as the source selection authority, shall select an offer for award based on review of the Source Evaluation Panel's recommendation contained in the reports described in paragraph (c) of this section.

(b) Any cancellation of solicitations and subsequent rejection of all proposals must be approved by the Head of the Contracting Activity.

(c) For all proposed contracts with total estimated values in excess of the simplified acquisition threshold and expected to result from competitive technical and price/cost negotiations, the cooperative review efforts of technical, contracting, and other administrative personnel are formalized through establishment of a Source Evaluation Panel. A single technical member may be appointed to the Source Evaluation Panel to evaluate proposals with the contracting officer's approval. In these instances, the Designating Official may appoint technical advisors (non-voting members) to assist the single technical member. The Source Evaluation Panel should not exceed five members, including the Chairperson except in unusual cases. The Source Evaluation Panel's proposal evaluation report(s) may include a Competitive Range Report and a Final Evaluation Report (to be used when award will be made after conducting discussions), or a Recommendation for Award Report (to be used when award will be made without discussions).

(d) The Designating Official (Office Director or designee) is responsible for appointing a Source Evaluation Panel to evaluate competitive technical proposals in accordance with the solicitation technical criteria. The Designating Official is also responsible for conducting an independent review and evaluation of the Source Evaluation Panel's proposal evaluation report(s) to the contracting officer.

§2015.304 Evaluation factors

The evaluation factors included in the solicitation serve as the standard against which all proposals are evaluated and are the basis for the development of proposal preparation instructions in accordance with FAR 15.304(b). The solicitation may indicate the relative importance of evaluation factors and subfactors by assigning a numerical weight to each factor. If a solicitation uses numerical weights, those weights shall be stated in the solicitation. The relative importance of factors that are not numerically weighted will be stated in the solicitation. Examples of factors which may not be numerically weighted are conflict of interest, estimated cost, and "go/no go" evaluation factors.

§2015.305 Proposal evaluation.

The contracting officer may provide offerors' cost proposals and supporting financial information to members of the Source Evaluation Panel at the same time technical proposals are distributed for evaluation. The Source Evaluation Panel shall use this information to perform an accurate integrated assessment of each offeror's proposal based on all the facts presented to them.

Subpart 2015.6 - Unsolicited Proposals

§2015.606 Agency procedures.

(a) The Division of Contracts and Property Management is the point of contact for the receipt, acknowledgment, and handling of unsolicited proposals.

(b) An original and two copies of the unsolicited proposal as well as requests for additional information regarding their preparation, must be submitted to:

U.S. Nuclear Regulatory Commission
Division of Contracts and Property Management
Mail Stop T-7-I-2
Washington, DC 20555

(c) The Division of Contracts and Property Management shall enter each unsolicited proposal into the unsolicited proposal tracking system.

§2015.606-1 Receipt and initial review.

(a) The Division of Contracts and Property Management shall acknowledge receipt of an unsolicited proposal, complete a preliminary review, assign a docket number, and send copies of the unsolicited proposal to the appropriate program office Director(s) or designee for evaluation.

(b) The Division of Contracts and Property Management shall be responsible for controlling reproduction and distribution of proposal material by notifying evaluators of their responsibilities and tracking the number of proposals received and forwarded to evaluators.

(c) An acknowledgment letter will be sent to the proposer by The Division of Contracts and Property Management. The letter will provide an estimated date for a funding decision or identifying the reasons for non-acceptance of the proposal for review in accordance with FAR 15.606-1(b) and FAR 15.606-1(c).

PART 2016 - TYPES OF CONTRACTS

Subpart 2016.3 Cost Reimbursement Contracts

Sec.

2016.307-70 Contract provisions and clauses.

Subpart 2016.5 Indefinite-Delivery Contracts

Sec.

2016.506-70 Contract provisions and clauses.

AUTHORITY: 42 U.S.C. 2201; 42 U.S.C. 5841; and 41 U.S.C. 418(b).

Subpart 2016.3 Cost Reimbursement Contracts

§2016.307-70 Contract provisions and clauses.

(a) The contracting officer shall insert the provision at §2052.216-70, Level of Effort, in solicitations for negotiated procurements containing labor costs other than maintenance services to be awarded on a cost reimbursement, cost sharing, cost-plus-award fee, cost-plus-fixed fee, time and materials, or labor hour basis.

(b) The contracting officer may insert the following provisions and clauses in cost reimbursement contracts as applicable:

(1) Section 2052.216-71, Indirect Cost Rates (where provisional rates without ceilings apply).

(2) Section 2052.216-71, Indirect Cost Rates - Alternate 1 (where predetermined rates apply).

(3) Section 2052.216-71, Indirect Cost Rates (Ceiling) - Alternate 2 (where provisional rates with ceilings apply).

(c) The contracting officer may make appropriate changes to these clauses to reflect different arrangements.

Subpart 2016.5 Indefinite-Delivery Contracts

Sec.

2016.506-70 Contract provisions and clauses.
§2016.506-70 Contract provisions and clauses.

The contracting officer shall insert the following clauses in all solicitations and contracts that contain task order procedures. These clauses may be altered by the contracting officer to fit the circumstances of the requirement.

(a) Section 2052.216-72, Task Order Procedures;

(b) Section 2052.216-73, Accelerated Task Order Procedures.

PART 2017 - SPECIAL CONTRACTING METHODS

Subpart 2017.2 - Options

Sec.

2017.204 Contracts

AUTHORITY: 42 U.S.C. 2201; 42 U.S.C. 5841; and 41 U.S.C. 481(b).

Subpart 2017.2 Options

§2017.204 Contracts

(a) The contracting officer may approve non-competitive extensions, within the limits of his/her delegation, to five-year contracts up to a total of an additional 6 months for the purpose of completing the competitive process for a follow-on contract if the request for procurement action for a follow-on or replacement contract was received in the Division of Contracts and Property Management not less than 6 months before the end of the fifth year.

(b) Other extensions beyond five years must be approved by the Competition Advocate.

SUBCHAPTER D - SOCIOECONOMIC PROGRAMS

PART 2019 - SMALL BUSINESS PROGRAMS

Subpart 2019.7 Subcontracting with small business, small disadvantaged business, and women-owned small business concerns

Sec.

2019.705 Responsibilities of the contracting officer under the subcontracting assistance program.
2019.705-4 Reviewing the subcontracting plan.

AUTHORITY: 42 U.S.C. 2201; 42 U.S.C. 5841; and 41 U.S.C. 418(b).

Subpart 2019.7 Subcontracting with small business, small disadvantaged business, and women-owned small business concerns

§2019-705 Responsibilities of the contracting officer under the subcontracting assistance program.

§2019.705-4 Reviewing the subcontracting plan.

The contracting officer may accept the terms of an overall or "master" company subcontracting plan incorporated by reference into a specific subcontracting plan submitted by the apparent successful offeror/bid for a specific contract, only upon ensuring that the required information, goals, and assurances are included in accordance with FAR 19.704.

PART 2022 - APPLICATION OF LABOR LAWS TO GOVERNMENT ACQUISITIONS

Subpart 2022.1 Basic Labor Policies.

Sec.

2022.101-1 General
2022.103-4 Approvals.

Subpart 2022.9 Nondiscrimination Because of Age

2022.901-70 Contract provisions.

AUTHORITY: 42 U.S.C. 2201; 42 U.S.C. 5841; and 41 U.S.C. 4186 (b)

Subpart 2022.1 Basic Labor Policies.

§2022.101-1 General.

The Head of the Contracting Activity shall designate programs or requirements for which it is necessary that contractors be required to notify the Government of actual or potential labor disputes that are delaying or threaten to delay the timely contract performance. Contractor notification shall be made in accordance with FAR 52.222-1, "Notice to the Government of Labor Disputes."

§2022.103-4 Approvals.

The agency approving official for contractor overtime is the contracting officer.

Subpart 2022.9 Nondiscrimination Because of Age.

§2022.901-70 Contract provisions.

The contracting officer shall insert the provision found at §2052.222-70, Nondiscrimination Because of Age, in all solicitations.

PART 2024 - PROTECTION OF PRIVACY AND FREEDOM OF INFORMATION

Subpart 2024.1 Protection of Individual Privacy

Sec.

2024.103 Procedures.

Subpart 2024.2 Freedom of Information Act

2024.202 Policy.

AUTHORITY: 42 U.S.C. 2201; 42 U.S.C. 5841; and 41 U.S.C. 418(b).

Subpart 2024.1 Protection of Individual Privacy

§2024.103 Procedures.

The provisions at 10 CFR Part 9, Subpart B, Privacy Act Regulations, are applicable to the maintenance or disclosure of information for a system of records on individuals.

Subpart 2024.2 Freedom of Information Act

§2024.202 Policy.

The provisions at 10 CFR Part 9, Subpart A, Freedom of Information Act Regulations, are applicable to the availability of NRC records to the public.

SUBCHAPTER E - GENERAL CONTRACTING REQUIREMENTS

PART 2027 - PATENTS, DATA, AND COPYRIGHTS

Subpart 2027.3 Patent Rights Under Government Contracts.

Sec.

2027.305-3 Follow-up by Government.
2027.305-70 Solicitation provisions and contract clauses.

AUTHORITY: 42 U.S.C. 2201; 42 U.S.C. 5841; and 41 U.S.C. 418(b).

Subpart 2027.3 Patent Rights Under Government Contracts.

§2027.305-3 Follow-up by Government.

(a) The contracting officer shall, as a part of the closeout of a contract, require each contractor to report any patents, copyrights, or royalties attained using any portion of the contract funds in writing.

(b) If no activity is to be reported, the contractor shall provide the following written determination before final payment and closeout of the contract:

(1) No inventions or discoveries were made,

(2) No copyrights were secured, produced, or composed,

(3) No notices or claims of patent or copyright infringement have been received by the contractor or its subcontractors; and

(4) No royalty payments were directly involved in the contract or reflected in the contract price to the Government, nor were any royalties or other payments paid or owed directly to others.

(c) The contracting officer may waive any of the requirements in paragraphs (b) (1)-(4) of this section, after documenting the file to indicate the -

(1) Impracticality of obtaining the document(s); and

(2) Steps taken to attempt to obtain them.

(c) The contracting officer shall notify agency legal counsel responsible for patents whenever a contractor reports any patent, copyright, or royalty activity. The contract officer shall document the official file with the resolution to protect the Government's rights before making any final payment and closing out the contract.

§2027.305-70 - Solicitation provisions and contract clauses.

The contracting officer shall insert the clause at §2052.227-70, Drawings, Designs, Specifications, and Data, in all solicitations and contracts in which drawings, designs, specifications, or other data will be developed and the NRC is required to retain full rights to them (except for the contractor's right to retain a copy for its own use). When any of the clauses prescribed at FAR 27.409, Solicitation Provisions and Contract Clauses, are included in the solicitation/contract, this clause will not be used.

PART 2030 - COST ACCOUNTING STANDARDS

Authority: 42 U.S.C. 2201; 42 U.S.C. 5841; and 41 U.S.C. 418(b).

Subpart 2030.2 - CAS Program Requirements

§2030.201-5 Waiver

Requests to waive Cost Accounting Standards (CAS) requirements must be submitted to the Chairman, CAS Board by the Competition Advocate. The requests for waiver must be forwarded through the Head of the Contracting Activity with supporting documentation and rationale in accordance with FAR 30.201-5.

PART 2031 - CONTRACT COST PRINCIPLES AND PROCEDURES

AUTHORITY: 42 U.S.C. 2201; 42 U.S.C. 5841; and 41 U.S.C. 418(b).

Subpart 2031.1 Applicability

§2031.109-70 Contract clauses.

The contracting officer shall insert the clause at §2052.231-70, Precontract Costs, in all cost type contracts when costs in connection with work under the contract will be incurred by the contractor before the effective date of the contract. Approval for use of this clause must be obtained at one level above the contracting officer.

PART 2032 - CONTRACT FINANCING

AUTHORITY: 42 U.S.C. 2201; 42 U.S.C. 5841; and 41 U.S.C. 418(b).

Subpart 2032.4 Advance Payments for Non-Commercial Items

§2032.402 General.

(a) The contracting officer has the responsibility and authority for making findings and determinations and for approval of contract terms concerning advance payments.

(b) Before authorizing any advance payment agreements, except for subscriptions to publications, the contracting officer shall coordinate with the Office of the Chief Financial Officer, Division of Accounting and Finance, to ensure completeness of contractor submitted documentation.

PART 2033 - PROTESTS, DISPUTES, AND APPEALS

Subpart 2033.1 Protests

Sec.

2033.103 Protests to the agency.

Subpart 2033.2 - Disputes and Appeals

Sec.

2033.204 Policy.
2033.211 Contract Claims - Contracting officer's decision.
2033.215 Contract clause.

AUTHORITY: 42 U.S.C. 2201; 42 U.S.C. 5841; and 41 U.S.C. 418(b).

Subpart 2033.1 Protests

§2033.103 Protests to the agency.

Protests to the agency are first considered by the contracting officer. In accordance with FAR 33.103(d)(4), the protestor may appeal the contracting officer's decision by delivering or providing a written request to the agency Director, Division of Contracts or Property Management, or designee, to conduct an independent review of the Contracting Officer's decision.

Subpart 2033.2 - Disputes and Appeals

§2033.204 Policy.

Final decisions of the NRC contracting officer on contract disputes and appeals issued under to the Contracts Disputes Act will be heard by the Department of Energy Board of Contract Appeals (EBCA) under an interagency agreement between the NRC and the Department of Energy. The EBCA rules appear in 10 CFR Part 1023.

§2033.211 Contract Claims - Contracting officer's decision.

The contracting officer shall alter the paragraph at FAR 33.211(a)(4)(v) to identify the Energy Board of Contract Appeals and include its address: U.S. Department of Energy, Board of Contract Appeals, HG-50, Building 950, 1000 Independence Ave., SW, Washington, DC 20585, when preparing a written decision.

§2033.215 Contract clause.

The contracting officer shall use the clause at FAR 52.233-1, Disputes, with its Alternate I, where continued performance is vital to National Security, the public health and safety, critical and major agency programs, or other essential supplies or services whose timely reprocurement from other sources would be impractical.

SUBCHAPTER F - SPECIAL CATEGORIES OF CONTRACTING

PART 2035 - RESEARCH AND DEVELOPMENT CONTRACTING

Sec.

2035.70 Contract clauses.
2035.71 Broad agency announcements.

AUTHORITY: 42 U.S.C. 2201; 42 U.S.C. 5841; and 41 U.S.C. 418(b).

§2035.70 Contract clauses.

(a) The contracting officer shall insert the following clause in all solicitations and contracts for research and development by private contractors and universities and for other technical services, as appropriate:

(1) Section 2052.235-70, Publication of Research Results;

(2) Section 2052.235-72 Safety, Health and Fire Protection.

§2035.71 Broad agency announcements.

(a) Criteria for selecting contractors may include such factors as:

(1) Unique and innovative methods, approaches, or concepts demonstrated by the proposal.

(2) Overall scientific, technical, or economic merits of the proposal.

(3) The offeror's capabilities, related experience, facilities, techniques, or unique combinations of these which are integral factors for achieving the proposal objectives.

(4) The qualifications, capabilities, and experience of the proposed principal investigator, team leader, or key personnel who are critical in achieving the proposal objectives.

(5) Potential contribution of the effort to NRC's mission.

(6) Overall standing among similar proposals available for evaluation and/or evaluation against the known state-of-the-art technology.

(b) Once a proposal is received, communication between the agency's scientific or engineering personnel and the principal investigator is permitted for clarification purposes only and must be coordinated through the Division of Contracts and Property Management.

(c) After evaluation of the proposals, the Designating Official shall submit a comprehensive evaluation report to the contracting officer which recommends the source(s) for contract award. The report must reflect the basis for the selection or nonselection of each proposal received.

SUBCHAPTER G - CONTRACT MANAGEMENT

PART 2042 - CONTRACT ADMINISTRATION

Subpart 2042.570 Differing Professional Views (DPV)

Sec.

2042.570-1 Policy
2042.570-2 Solicitation and contract clauses

Subpart 2042.8 Disallowance of Costs

Sec.

2042.803 Disallowing costs after incurrence.

AUTHORITY: 42 U.S.C. 2201; 42 U.S.C. 5841; and 418(b).

Subpart 2042.570 - Differing Professional Views

§2042.570-1 Policy.

The Nuclear Regulatory Commission's (NRC) policy is to support the contractor's expression of professional health and safety-related concerns associated with the contractor's work for the NRC that may differ from a prevailing NRC staff view, disagree with an NRC decision or policy position, or take issue with proposed or established agency practices. An occasion may arise when an NRC contractor, contractor's personnel, or subcontractor personnel believes that a conscientious expression of a competent judgement is required to document these concerns on matters directly associated with its performance of the contract. The procedure described in §2052.242-71, Procedures for Resolving NRC Contractor Differing Professional Views, provides for the expression and resolution of DPVs of health and safety-related concerns associated with the mission of the agency by NRC contractors, contractor personnel, or subcontractor personnel on matters directly associated with its performance of the contract. The contractor shall provide a copy of the NRC DPV procedure to all of its employees performing under this contract and to all subcontractors who shall, in turn, provide a copy of the procedure to its employ