skip navigation links 
 
Index | Site Map | FAQ | Facility Info | Reading Rm | New | Help | Glossary | Contact Us blue spacer BrowseAloud
secondary page banner Return to NRC Home Page

Mid Cycle 2009 ROP Substantive Cross Cutting Issues Summary

The NRC evaluates whether a substantive cross-cutting issue exists at each operating reactor twice a year; during the mid-cycle and end-of-cycle assessment meetings in accordance with IMC 0305. If the NRC determines that a substantive cross-cutting issue exists at a given plant, the resultant mid-cycle and end-of-cycle assessment letters summarize the specific substantive cross-cutting issue to include the necessary actions to resolve the issue. The next mid-cycle or annual assessment letter will either state that the issue has been satisfactorily resolved or summarize the agency’s assessment and licensee’s progress in addressing the issue.

“Yes” in the matrix below indicates that the plant has a open substantive cross-cutting issue in that area based on the most recent mid-cycle or end-of-cycle assessment. Clicking on the “Yes” will take you directly to the assessment letter that describes the issue. "Closed" in the matrix below indicates that the plant had a substantive cross-cutting issue closed based on the last assessment. Clicking on the "Closed" will take you directly to the assessment letter that describes the issue.

Plants Human Performance Problem Identification and Resolution Safety Conscious Work Environment
Arkansas Nuclear 1      
Arkansas Nuclear 2      
Beaver Valley 1      
Beaver Valley 2      
Braidwood 1 Yes    
Braidwood 2 Yes    
Browns Ferry 1   Closed  
Browns Ferry 2   Closed  
Browns Ferry 3   Closed  
Brunswick 1      
Brunswick 2      
Byron 1 Closed    
Byron 2 Closed    
Callaway      
Calvert Cliffs 1      
Calvert Cliffs 2      
Catawba 1      
Catawba 2      
Clinton      
Columbia Generating Station      
Comanche Peak 1      
Comanche Peak 2      
Cooper      
Crystal River 3      
D.C. Cook 1      
D.C. Cook 2      
Davis-Besse      
Diablo Canyon 1      
Diablo Canyon 2      
Dresden 2      
Dresden 3      
Duane Arnold      
Farley 1      
Farley 2      
Fermi 2      
FitzPatrick      
Fort Calhoun      
Ginna      
Grand Gulf 1      
Harris 1      
Hatch 1      
Hatch 2      
Hope Creek 1      
Indian Point 2      
Indian Point 3      
Kewaunee      
La Salle 1      
La Salle 2      
Limerick 1      
Limerick 2      
McGuire 1      
McGuire 2      
Millstone 2      
Millstone 3      
Monticello Yes    
Nine Mile Point 1      
Nine Mile Point 2      
North Anna 1      
North Anna 2      
Oconee 1      
Oconee 2      
Oconee 3      
Oyster Creek      
Palisades Yes    
Palo Verde 1 Closed Closed  
Palo Verde 2 Closed Closed  
Palo Verde 3 Closed Closed  
Peach Bottom 2      
Peach Bottom 3      
Perry 1 Yes Yes  
Pilgrim 1      
Point Beach 1 Closed Closed  
Point Beach 2 Closed Closed  
Prairie Island 1 Yes    
Prairie Island 2 Yes    
Quad Cities 1      
Quad Cities 2      
River Bend 1      
Robinson 2      
Saint Lucie 1      
Saint Lucie 2      
Salem 1 Yes    
Salem 2 Yes    
San Onofre 2 Yes Yes  
San Onofre 3 Yes Yes  
Seabrook 1      
Sequoyah 1      
Sequoyah 2      
South Texas 1      
South Texas 2      
Summer      
Surry 1      
Surry 2      
Susquehanna 1      
Susquehanna 2      
Three Mile Island 1      
Turkey Point 3      
Turkey Point 4      
Vermont Yankee      
Vogtle 1      
Vogtle 2      
Waterford 3      
Watts Bar 1      
Wolf Creek 1 Closed Yes  

 

Top of page    PI Summary   Action Matrix Summary   Reactor Oversight Process


Last Modified: Sep 02, 2009