United States Nuclear Regulatory Commission - Protecting People and the Environment

Mid Cycle 2011 ROP Substantive Cross Cutting Issues Summary

The NRC evaluates whether a substantive cross-cutting issue exists at each operating reactor twice a year; during the mid-cycle and end-of-cycle assessment meetings in accordance with IMC 0305. If the NRC determines that a substantive cross-cutting issue exists at a given plant, the resultant mid-cycle and end-of-cycle assessment letters summarize the specific substantive cross-cutting issue to include the necessary actions to resolve the issue. The next mid-cycle or annual assessment letter will either state that the issue has been satisfactorily resolved or summarize the agency’s assessment and licensee’s progress in addressing the issue.

“Yes” in the matrix below indicates that the plant has a open substantive cross-cutting issue in that area based on the most recent mid-cycle or end-of-cycle assessment. Clicking on the “Yes” will take you directly to the assessment letter that describes the issue. "Closed" in the matrix below indicates that the plant had a substantive cross-cutting issue closed based on the last assessment. Clicking on the "Closed" will take you directly to the assessment letter that describes the issue.

Plants Human Performance Problem Identification and Resolution Safety Conscious Work Environment
Arkansas Nuclear 1      
Arkansas Nuclear 2      
Beaver Valley 1      
Beaver Valley 2      
Braidwood 1      
Braidwood 2      
Browns Ferry 1   Yes  
Browns Ferry 2   Yes  
Browns Ferry 3   Yes  
Brunswick 1      
Brunswick 2      
Byron 1      
Byron 2      
Callaway      
Calvert Cliffs 1      
Calvert Cliffs 2      
Catawba 1      
Catawba 2      
Clinton      
Columbia Generating Station      
Comanche Peak 1      
Comanche Peak 2      
Cooper Yes    
Crystal River 3      
D.C. Cook 1      
D.C. Cook 2      
Davis-Besse      
Diablo Canyon 1   Yes  
Diablo Canyon 2   Yes  
Dresden 2      
Dresden 3      
Duane Arnold      
Farley 1      
Farley 2      
Fermi 2      
FitzPatrick      
Fort Calhoun      
Ginna      
Grand Gulf 1      
Harris 1      
Hatch 1      
Hatch 2      
Hope Creek 1      
Indian Point 2      
Indian Point 3      
Kewaunee      
La Salle 1      
La Salle 2      
Limerick 1      
Limerick 2      
McGuire 1      
McGuire 2      
Millstone 2      
Millstone 3      
Monticello      
Nine Mile Point 1      
Nine Mile Point 2      
North Anna 1      
North Anna 2      
Oconee 1 Yes    
Oconee 2 Yes    
Oconee 3 Yes    
Oyster Creek      
Palisades      
Palo Verde 1      
Palo Verde 2      
Palo Verde 3      
Peach Bottom 2      
Peach Bottom 3      
Perry 1 Yes    
Pilgrim 1      
Point Beach 1      
Point Beach 2      
Prairie Island 1      
Prairie Island 2      
Quad Cities 1      
Quad Cities 2      
River Bend 1      
Robinson 2 Yes    
Saint Lucie 1      
Saint Lucie 2      
Salem 1      
Salem 2      
San Onofre 2 Yes    
San Onofre 3 Yes    
Seabrook 1      
Sequoyah 1      
Sequoyah 2      
South Texas 1      
South Texas 2      
Summer      
Surry 1      
Surry 2      
Susquehanna 1   Yes  
Susquehanna 2   Yes  
Three Mile Island 1      
Turkey Point 3      
Turkey Point 4      
Vermont Yankee      
Vogtle 1      
Vogtle 2      
Waterford 3      
Watts Bar 1      
Wolf Creek 1 Yes Yes  

 

Top of page    PI Summary   Action Matrix Summary   Reactor Oversight Process


Last Modified: Sep 06, 2011