skip navigation links 
 
 Search Options 
Index | Site Map | FAQ | Facility Info | Reading Rm | New | Help | Glossary | Contact Us blue spacer  
secondary page banner Return to NRC Home Page

End of Cycle 2007 ROP Substantive Cross Cutting Issues Summary

The NRC evaluates whether a substantive cross-cutting issue exists at each operating reactor twice a year; during the mid-cycle and end-of-cycle assessment meetings in accordance with IMC 0305. If the NRC determines that a substantive cross-cutting issue exists at a given plant, the resultant mid-cycle and end-of-cycle assessment letters summarize the specific substantive cross-cutting issue to include the necessary actions to resolve the issue. The next mid-cycle or annual assessment letter will either state that the issue has been satisfactorily resolved or summarize the agency’s assessment and licensee’s progress in addressing the issue.

“Yes” in the matrix below indicates that the plant has a open substantive cross-cutting issue in that area based on the most recent mid-cycle or end-of-cycle assessment. Clicking on the “Yes” will take you directly to the assessment letter that describes the issue. "Closed" in the matrix below indicates that the plant had a substantive cross-cutting issue closed based on the last assessment. Clicking on the "Closed" will take you directly to the assessment letter that describes the issue.

Plants Human Performance Problem Identification and Resolution Safety Conscious Work Environment
Arkansas Nuclear 1 Yes    
Arkansas Nuclear 2 Yes    
Beaver Valley 1      
Beaver Valley 2      
Braidwood 1      
Braidwood 2      
Browns Ferry 1   Yes  
Browns Ferry 2   Yes  
Browns Ferry 3   Yes  
Brunswick 1      
Brunswick 2      
Byron 1      
Byron 2      
Callaway   Closed  
Calvert Cliffs 1      
Calvert Cliffs 2      
Catawba 1      
Catawba 2      
Clinton      
Columbia Generating Station      
Comanche Peak 1      
Comanche Peak 2      
Cooper Yes    
Crystal River 3      
D.C. Cook 1      
D.C. Cook 2      
Davis-Besse      
Diablo Canyon 1      
Diablo Canyon 2      
Dresden 2      
Dresden 3      
Duane Arnold      
Farley 1      
Farley 2      
Fermi 2 Yes    
FitzPatrick      
Fort Calhoun Yes    
Ginna      
Grand Gulf 1 Yes    
Harris 1      
Hatch 1      
Hatch 2      
Hope Creek 1      
Indian Point 2 Yes Yes  
Indian Point 3 Yes    
Kewaunee Yes Yes  
La Salle 1      
La Salle 2      
Limerick 1      
Limerick 2      
McGuire 1      
McGuire 2      
Millstone 2      
Millstone 3      
Monticello      
Nine Mile Point 1      
Nine Mile Point 2      
North Anna 1      
North Anna 2      
Oconee 1      
Oconee 2      
Oconee 3      
Oyster Creek      
Palisades Yes Closed  
Palo Verde 1 Yes Yes  
Palo Verde 2 Yes Yes  
Palo Verde 3 Yes Yes  
Peach Bottom 2      
Peach Bottom 3      
Perry 1 Yes    
Pilgrim 1      
Point Beach 1 Yes Yes  
Point Beach 2 Yes Yes  
Prairie Island 1      
Prairie Island 2      
Quad Cities 1 Yes    
Quad Cities 2 Yes    
River Bend 1 Closed    
Robinson 2      
Saint Lucie 1      
Saint Lucie 2      
Salem 1 Yes    
Salem 2 Yes    
San Onofre 2 Yes Yes  
San Onofre 3 Yes Yes  
Seabrook 1      
Sequoyah 1      
Sequoyah 2      
South Texas 1      
South Texas 2      
Summer      
Surry 1      
Surry 2      
Susquehanna 1      
Susquehanna 2      
Three Mile Island 1      
Turkey Point 3   Yes  
Turkey Point 4   Yes  
Vermont Yankee      
Vogtle 1      
Vogtle 2      
Waterford 3      
Watts Bar 1      
Wolf Creek 1 Yes    

 

Top of page    PI Summary   Action Matrix Summary   Reactor Oversight Process


Last Modified: Feb 22, 2008