4Q/2011 ROP Performance Indicators Summary

Crystal River has been shut down since October 2009, and Fort Calhoun has been shutdown since April 2011. Because the Unplanned Scrams with Complications (USwC) and Mitigating Systems Performance Index (MSPI) performance indicators (PIs) are heavily influenced by the operational status of the reactor, NRC staff has evaluated the validity of these PIs. Because the Crystal River and Fort Calhoun reactors have not been critical for at least six months, there have been no recent opportunities for a scram that would count in the USwC indicator. Similarly, the MSPI values can become skewed because of the very low number of critical hours. For these reasons, the staff has determined that these PIs no longer provide valid indications of performance. The shutdown conditions are also causing other indicators at these sites to be invalid, in accordance with NEI 99-02. The NRC and NEI are discussing generic PI validity criteria during the public ROP working group meetings.

Security information is not publicly available.

Plants Unplanned Scrams per 7000 Critical Hours Unplanned Power Changes Unplanned Scrams with Complications Safety System Functional Failures Mitigating Systems Performance Index, Emergency AC Power System Mitigating Systems Performance Index, High Pressure Injection System Mitigating Systems Performance Index, Heat Removal System Mitigating Systems Performance Index, Residual Heat Removal System Mitigating Systems Performance Index, Cooling Water Systems Reactor Coolant System Specific Activity Reactor Coolant System Leakage Drill/Exercise Performance ERO Drill Participation Alert and Notification System Occupational Exposure Control Effectiveness RETS/ODCM Radiological Effluent
Arkansas Nuclear 1 Unplanned Scrams per 7000 Critical Hrs Unplanned Power Changes per 7000 Critical Hrs Unplanned Scrams with Complications Safety System Functional Failures (PWR) Mitigating Systems Performance Index, Emergency AC Power System Mitigating Systems Performance Index, High Pressure Injection System Mitigating Systems Performance Index, Heat Removal System Mitigating Systems Performance Index, Residual Heat Removal System Mitigating Systems Performance Index, Cooling Water Systems Reactor Coolant System Activity Reactor Coolant System Leakage Drill/Exercise Performance ERO Drill Participation Alert & Notification System Occupational Exposure Control Effectiveness RETS/ODCM Radiological Effluent
Arkansas Nuclear 2 Unplanned Scrams per 7000 Critical Hrs Unplanned Power Changes per 7000 Critical Hrs Unplanned Scrams with Complications Safety System Functional Failures (PWR) Mitigating Systems Performance Index, Emergency AC Power System Mitigating Systems Performance Index, High Pressure Injection System Mitigating Systems Performance Index, Heat Removal System Mitigating Systems Performance Index, Residual Heat Removal System Mitigating Systems Performance Index, Cooling Water Systems Reactor Coolant System Activity Reactor Coolant System Leakage Drill/Exercise Performance ERO Drill Participation Alert & Notification System Occupational Exposure Control Effectiveness RETS/ODCM Radiological Effluent
Beaver Valley 1 Unplanned Scrams per 7000 Critical Hrs Unplanned Power Changes per 7000 Critical Hrs Unplanned Scrams with Complications Safety System Functional Failures (PWR) Mitigating Systems Performance Index, Emergency AC Power System Mitigating Systems Performance Index, High Pressure Injection System Mitigating Systems Performance Index, Heat Removal System Mitigating Systems Performance Index, Residual Heat Removal System Mitigating Systems Performance Index, Cooling Water Systems Reactor Coolant System Activity Reactor Coolant System Leakage Drill/Exercise Performance ERO Drill Participation Alert & Notification System Occupational Exposure Control Effectiveness RETS/ODCM Radiological Effluent
Beaver Valley 2 Unplanned Scrams per 7000 Critical Hrs Unplanned Power Changes per 7000 Critical Hrs Unplanned Scrams with Complications Safety System Functional Failures (PWR) Mitigating Systems Performance Index, Emergency AC Power System Mitigating Systems Performance Index, High Pressure Injection System Mitigating Systems Performance Index, Heat Removal System Mitigating Systems Performance Index, Residual Heat Removal System Mitigating Systems Performance Index, Cooling Water Systems Reactor Coolant System Activity Reactor Coolant System Leakage Drill/Exercise Performance ERO Drill Participation Alert & Notification System Occupational Exposure Control Effectiveness RETS/ODCM Radiological Effluent
Braidwood 1 Unplanned Scrams per 7000 Critical Hrs Unplanned Power Changes per 7000 Critical Hrs Unplanned Scrams with Complications Safety System Functional Failures (PWR) Mitigating Systems Performance Index, Emergency AC Power System Mitigating Systems Performance Index, High Pressure Injection System Mitigating Systems Performance Index, Heat Removal System Mitigating Systems Performance Index, Residual Heat Removal System Mitigating Systems Performance Index, Cooling Water Systems Reactor Coolant System Activity Reactor Coolant System Leakage Drill/Exercise Performance ERO Drill Participation Alert & Notification System Occupational Exposure Control Effectiveness RETS/ODCM Radiological Effluent
Braidwood 2 Unplanned Scrams per 7000 Critical Hrs Unplanned Power Changes per 7000 Critical Hrs Unplanned Scrams with Complications Safety System Functional Failures (PWR) Mitigating Systems Performance Index, Emergency AC Power System Mitigating Systems Performance Index, High Pressure Injection System Mitigating Systems Performance Index, Heat Removal System Mitigating Systems Performance Index, Residual Heat Removal System Mitigating Systems Performance Index, Cooling Water Systems Reactor Coolant System Activity Reactor Coolant System Leakage Drill/Exercise Performance ERO Drill Participation Alert & Notification System Occupational Exposure Control Effectiveness RETS/ODCM Radiological Effluent
Browns Ferry 1 Unplanned Scrams per 7000 Critical Hrs Unplanned Power Changes per 7000 Critical Hrs Unplanned Scrams with Complications Safety System Functional Failures (BWR) Mitigating Systems Performance Index, Emergency AC Power System Mitigating Systems Performance Index, High Pressure Injection System Mitigating Systems Performance Index, Heat Removal System Mitigating Systems Performance Index, Residual Heat Removal System Mitigating Systems Performance Index, Cooling Water Systems Reactor Coolant System Activity Reactor Coolant System Leakage Drill/Exercise Performance ERO Drill Participation Alert & Notification System Occupational Exposure Control Effectiveness RETS/ODCM Radiological Effluent
Browns Ferry 2 Unplanned Scrams per 7000 Critical Hrs Unplanned Power Changes per 7000 Critical Hrs Unplanned Scrams with Complications Safety System Functional Failures (BWR) Mitigating Systems Performance Index, Emergency AC Power System Mitigating Systems Performance Index, High Pressure Injection System Mitigating Systems Performance Index, Heat Removal System Mitigating Systems Performance Index, Residual Heat Removal System Mitigating Systems Performance Index, Cooling Water Systems Reactor Coolant System Activity Reactor Coolant System Leakage Drill/Exercise Performance ERO Drill Participation Alert & Notification System Occupational Exposure Control Effectiveness RETS/ODCM Radiological Effluent
Browns Ferry 3 Unplanned Scrams per 7000 Critical Hrs Unplanned Power Changes per 7000 Critical Hrs Unplanned Scrams with Complications Safety System Functional Failures (BWR) Mitigating Systems Performance Index, Emergency AC Power System Mitigating Systems Performance Index, High Pressure Injection System Mitigating Systems Performance Index, Heat Removal System Mitigating Systems Performance Index, Residual Heat Removal System Mitigating Systems Performance Index, Cooling Water Systems Reactor Coolant System Activity Reactor Coolant System Leakage Drill/Exercise Performance ERO Drill Participation Alert & Notification System Occupational Exposure Control Effectiveness RETS/ODCM Radiological Effluent
Brunswick 1 Unplanned Scrams per 7000 Critical Hrs Unplanned Power Changes per 7000 Critical Hrs Unplanned Scrams with Complications Safety System Functional Failures (BWR) Mitigating Systems Performance Index, Emergency AC Power System Mitigating Systems Performance Index, High Pressure Injection System Mitigating Systems Performance Index, Heat Removal System Mitigating Systems Performance Index, Residual Heat Removal System Mitigating Systems Performance Index, Cooling Water Systems Reactor Coolant System Activity Reactor Coolant System Leakage Drill/Exercise Performance ERO Drill Participation Alert & Notification System Occupational Exposure Control Effectiveness RETS/ODCM Radiological Effluent
Brunswick 2 Unplanned Scrams per 7000 Critical Hrs Unplanned Power Changes per 7000 Critical Hrs Unplanned Scrams with Complications Safety System Functional Failures (BWR) Mitigating Systems Performance Index, Emergency AC Power System Mitigating Systems Performance Index, High Pressure Injection System Mitigating Systems Performance Index, Heat Removal System Mitigating Systems Performance Index, Residual Heat Removal System Mitigating Systems Performance Index, Cooling Water Systems Reactor Coolant System Activity Reactor Coolant System Leakage Drill/Exercise Performance ERO Drill Participation Alert & Notification System Occupational Exposure Control Effectiveness RETS/ODCM Radiological Effluent
Byron 1 Unplanned Scrams per 7000 Critical Hrs Unplanned Power Changes per 7000 Critical Hrs Unplanned Scrams with Complications Safety System Functional Failures (PWR) Mitigating Systems Performance Index, Emergency AC Power System Mitigating Systems Performance Index, High Pressure Injection System Mitigating Systems Performance Index, Heat Removal System Mitigating Systems Performance Index, Residual Heat Removal System Mitigating Systems Performance Index, Cooling Water Systems Reactor Coolant System Activity Reactor Coolant System Leakage Drill/Exercise Performance ERO Drill Participation Alert & Notification System Occupational Exposure Control Effectiveness RETS/ODCM Radiological Effluent
Byron 2 Unplanned Scrams per 7000 Critical Hrs Unplanned Power Changes per 7000 Critical Hrs Unplanned Scrams with Complications Safety System Functional Failures (PWR) Mitigating Systems Performance Index, Emergency AC Power System Mitigating Systems Performance Index, High Pressure Injection System Mitigating Systems Performance Index, Heat Removal System Mitigating Systems Performance Index, Residual Heat Removal System Mitigating Systems Performance Index, Cooling Water Systems Reactor Coolant System Activity Reactor Coolant System Leakage Drill/Exercise Performance ERO Drill Participation Alert & Notification System Occupational Exposure Control Effectiveness RETS/ODCM Radiological Effluent
Callaway Unplanned Scrams per 7000 Critical Hrs Unplanned Power Changes per 7000 Critical Hrs Unplanned Scrams with Complications Safety System Functional Failures (PWR) Mitigating Systems Performance Index, Emergency AC Power System Mitigating Systems Performance Index, High Pressure Injection System Mitigating Systems Performance Index, Heat Removal System Mitigating Systems Performance Index, Residual Heat Removal System Mitigating Systems Performance Index, Cooling Water Systems Reactor Coolant System Activity Reactor Coolant System Leakage Drill/Exercise Performance ERO Drill Participation Alert & Notification System Occupational Exposure Control Effectiveness RETS/ODCM Radiological Effluent
Calvert Cliffs 1 Unplanned Scrams per 7000 Critical Hrs Unplanned Power Changes per 7000 Critical Hrs Unplanned Scrams with Complications Safety System Functional Failures (PWR) Mitigating Systems Performance Index, Emergency AC Power System Mitigating Systems Performance Index, High Pressure Injection System Mitigating Systems Performance Index, Heat Removal System Mitigating Systems Performance Index, Residual Heat Removal System Mitigating Systems Performance Index, Cooling Water Systems Reactor Coolant System Activity Reactor Coolant System Leakage Drill/Exercise Performance ERO Drill Participation Alert & Notification System Occupational Exposure Control Effectiveness RETS/ODCM Radiological Effluent
Calvert Cliffs 2 Unplanned Scrams per 7000 Critical Hrs Unplanned Power Changes per 7000 Critical Hrs Unplanned Scrams with Complications Safety System Functional Failures (PWR) Mitigating Systems Performance Index, Emergency AC Power System Mitigating Systems Performance Index, High Pressure Injection System Mitigating Systems Performance Index, Heat Removal System Mitigating Systems Performance Index, Residual Heat Removal System Mitigating Systems Performance Index, Cooling Water Systems Reactor Coolant System Activity Reactor Coolant System Leakage Drill/Exercise Performance ERO Drill Participation Alert & Notification System Occupational Exposure Control Effectiveness RETS/ODCM Radiological Effluent
Catawba 1 Unplanned Scrams per 7000 Critical Hrs Unplanned Power Changes per 7000 Critical Hrs Unplanned Scrams with Complications Safety System Functional Failures (PWR) Mitigating Systems Performance Index, Emergency AC Power System Mitigating Systems Performance Index, High Pressure Injection System Mitigating Systems Performance Index, Heat Removal System Mitigating Systems Performance Index, Residual Heat Removal System Mitigating Systems Performance Index, Cooling Water Systems Reactor Coolant System Activity Reactor Coolant System Leakage Drill/Exercise Performance ERO Drill Participation Alert & Notification System Occupational Exposure Control Effectiveness RETS/ODCM Radiological Effluent
Catawba 2 Unplanned Scrams per 7000 Critical Hrs Unplanned Power Changes per 7000 Critical Hrs Unplanned Scrams with Complications Safety System Functional Failures (PWR) Mitigating Systems Performance Index, Emergency AC Power System Mitigating Systems Performance Index, High Pressure Injection System Mitigating Systems Performance Index, Heat Removal System Mitigating Systems Performance Index, Residual Heat Removal System Mitigating Systems Performance Index, Cooling Water Systems Reactor Coolant System Activity Reactor Coolant System Leakage Drill/Exercise Performance ERO Drill Participation Alert & Notification System Occupational Exposure Control Effectiveness RETS/ODCM Radiological Effluent
Clinton Unplanned Scrams per 7000 Critical Hrs Unplanned Power Changes per 7000 Critical Hrs Unplanned Scrams with Complications Safety System Functional Failures (BWR) Mitigating Systems Performance Index, Emergency AC Power System Mitigating Systems Performance Index, High Pressure Injection System Mitigating Systems Performance Index, Heat Removal System Mitigating Systems Performance Index, Residual Heat Removal System Mitigating Systems Performance Index, Cooling Water Systems Reactor Coolant System Activity Reactor Coolant System Leakage Drill/Exercise Performance ERO Drill Participation Alert & Notification System Occupational Exposure Control Effectiveness RETS/ODCM Radiological Effluent
Columbia Generating Station Unplanned Scrams per 7000 Critical Hrs Unplanned Power Changes per 7000 Critical Hrs Unplanned Scrams with Complications Safety System Functional Failures (BWR) Mitigating Systems Performance Index, Emergency AC Power System Mitigating Systems Performance Index, High Pressure Injection System Mitigating Systems Performance Index, Heat Removal System Mitigating Systems Performance Index, Residual Heat Removal System Mitigating Systems Performance Index, Cooling Water Systems Reactor Coolant System Activity Reactor Coolant System Leakage Drill/Exercise Performance ERO Drill Participation Alert & Notification System Occupational Exposure Control Effectiveness RETS/ODCM Radiological Effluent
Comanche Peak 1 Unplanned Scrams per 7000 Critical Hrs Unplanned Power Changes per 7000 Critical Hrs Unplanned Scrams with Complications Safety System Functional Failures (PWR) Mitigating Systems Performance Index, Emergency AC Power System Mitigating Systems Performance Index, High Pressure Injection System Mitigating Systems Performance Index, Heat Removal System Mitigating Systems Performance Index, Residual Heat Removal System Mitigating Systems Performance Index, Cooling Water Systems Reactor Coolant System Activity Reactor Coolant System Leakage Drill/Exercise Performance ERO Drill Participation Alert & Notification System Occupational Exposure Control Effectiveness RETS/ODCM Radiological Effluent
Comanche Peak 2 Unplanned Scrams per 7000 Critical Hrs Unplanned Power Changes per 7000 Critical Hrs Unplanned Scrams with Complications Safety System Functional Failures (PWR) Mitigating Systems Performance Index, Emergency AC Power System Mitigating Systems Performance Index, High Pressure Injection System Mitigating Systems Performance Index, Heat Removal System Mitigating Systems Performance Index, Residual Heat Removal System Mitigating Systems Performance Index, Cooling Water Systems Reactor Coolant System Activity Reactor Coolant System Leakage Drill/Exercise Performance ERO Drill Participation Alert & Notification System Occupational Exposure Control Effectiveness RETS/ODCM Radiological Effluent
Cooper Unplanned Scrams per 7000 Critical Hrs Unplanned Power Changes per 7000 Critical Hrs Unplanned Scrams with Complications Safety System Functional Failures (BWR) Mitigating Systems Performance Index, Emergency AC Power System Mitigating Systems Performance Index, High Pressure Injection System Mitigating Systems Performance Index, Heat Removal System Mitigating Systems Performance Index, Residual Heat Removal System Mitigating Systems Performance Index, Cooling Water Systems Reactor Coolant System Activity Reactor Coolant System Leakage Drill/Exercise Performance ERO Drill Participation Alert & Notification System Occupational Exposure Control Effectiveness RETS/ODCM Radiological Effluent
Crystal River 3 Unplanned Scrams per 7000 Critical Hrs Unplanned Power Changes per 7000 Critical Hrs Unplanned Scrams with Complications Safety System Functional Failures (PWR) Mitigating Systems Performance Index, Emergency AC Power System Mitigating Systems Performance Index, High Pressure Injection System Mitigating Systems Performance Index, Heat Removal System Mitigating Systems Performance Index, Residual Heat Removal System Mitigating Systems Performance Index, Cooling Water Systems Reactor Coolant System Activity Reactor Coolant System Leakage Drill/Exercise Performance ERO Drill Participation Alert & Notification System Occupational Exposure Control Effectiveness RETS/ODCM Radiological Effluent
D.C. Cook 1 Unplanned Scrams per 7000 Critical Hrs Unplanned Power Changes per 7000 Critical Hrs Unplanned Scrams with Complications Safety System Functional Failures (PWR) Mitigating Systems Performance Index, Emergency AC Power System Mitigating Systems Performance Index, High Pressure Injection System Mitigating Systems Performance Index, Heat Removal System Mitigating Systems Performance Index, Residual Heat Removal System Mitigating Systems Performance Index, Cooling Water Systems Reactor Coolant System Activity Reactor Coolant System Leakage Drill/Exercise Performance ERO Drill Participation Alert & Notification System Occupational Exposure Control Effectiveness RETS/ODCM Radiological Effluent
D.C. Cook 2 Unplanned Scrams per 7000 Critical Hrs Unplanned Power Changes per 7000 Critical Hrs Unplanned Scrams with Complications Safety System Functional Failures (PWR) Mitigating Systems Performance Index, Emergency AC Power System Mitigating Systems Performance Index, High Pressure Injection System Mitigating Systems Performance Index, Heat Removal System Mitigating Systems Performance Index, Residual Heat Removal System Mitigating Systems Performance Index, Cooling Water Systems Reactor Coolant System Activity Reactor Coolant System Leakage Drill/Exercise Performance ERO Drill Participation Alert & Notification System Occupational Exposure Control Effectiveness RETS/ODCM Radiological Effluent
Davis-Besse Unplanned Scrams per 7000 Critical Hrs Unplanned Power Changes per 7000 Critical Hrs Unplanned Scrams with Complications Safety System Functional Failures (PWR) Mitigating Systems Performance Index, Emergency AC Power System Mitigating Systems Performance Index, High Pressure Injection System Mitigating Systems Performance Index, Heat Removal System Mitigating Systems Performance Index, Residual Heat Removal System Mitigating Systems Performance Index, Cooling Water Systems Reactor Coolant System Activity Reactor Coolant System Leakage Drill/Exercise Performance ERO Drill Participation Alert & Notification System Occupational Exposure Control Effectiveness RETS/ODCM Radiological Effluent
Diablo Canyon 1 Unplanned Scrams per 7000 Critical Hrs Unplanned Power Changes per 7000 Critical Hrs Unplanned Scrams with Complications Safety System Functional Failures (PWR) Mitigating Systems Performance Index, Emergency AC Power System Mitigating Systems Performance Index, High Pressure Injection System Mitigating Systems Performance Index, Heat Removal System Mitigating Systems Performance Index, Residual Heat Removal System Mitigating Systems Performance Index, Cooling Water Systems Reactor Coolant System Activity Reactor Coolant System Leakage Drill/Exercise Performance ERO Drill Participation Alert & Notification System Occupational Exposure Control Effectiveness RETS/ODCM Radiological Effluent
Diablo Canyon 2 Unplanned Scrams per 7000 Critical Hrs Unplanned Power Changes per 7000 Critical Hrs Unplanned Scrams with Complications Safety System Functional Failures (PWR) Mitigating Systems Performance Index, Emergency AC Power System Mitigating Systems Performance Index, High Pressure Injection System Mitigating Systems Performance Index, Heat Removal System Mitigating Systems Performance Index, Residual Heat Removal System Mitigating Systems Performance Index, Cooling Water Systems Reactor Coolant System Activity Reactor Coolant System Leakage Drill/Exercise Performance ERO Drill Participation Alert & Notification System Occupational Exposure Control Effectiveness RETS/ODCM Radiological Effluent
Dresden 2 Unplanned Scrams per 7000 Critical Hrs Unplanned Power Changes per 7000 Critical Hrs Unplanned Scrams with Complications Safety System Functional Failures (BWR) Mitigating Systems Performance Index, Emergency AC Power System Mitigating Systems Performance Index, High Pressure Injection System Mitigating Systems Performance Index, Heat Removal System Mitigating Systems Performance Index, Residual Heat Removal System Mitigating Systems Performance Index, Cooling Water Systems Reactor Coolant System Activity Reactor Coolant System Leakage Drill/Exercise Performance ERO Drill Participation Alert & Notification System Occupational Exposure Control Effectiveness RETS/ODCM Radiological Effluent
Dresden 3 Unplanned Scrams per 7000 Critical Hrs Unplanned Power Changes per 7000 Critical Hrs Unplanned Scrams with Complications Safety System Functional Failures (BWR) Mitigating Systems Performance Index, Emergency AC Power System Mitigating Systems Performance Index, High Pressure Injection System Mitigating Systems Performance Index, Heat Removal System Mitigating Systems Performance Index, Residual Heat Removal System Mitigating Systems Performance Index, Cooling Water Systems Reactor Coolant System Activity Reactor Coolant System Leakage Drill/Exercise Performance ERO Drill Participation Alert & Notification System Occupational Exposure Control Effectiveness RETS/ODCM Radiological Effluent
Duane Arnold Unplanned Scrams per 7000 Critical Hrs Unplanned Power Changes per 7000 Critical Hrs Unplanned Scrams with Complications Safety System Functional Failures (BWR) Mitigating Systems Performance Index, Emergency AC Power System Mitigating Systems Performance Index, High Pressure Injection System Mitigating Systems Performance Index, Heat Removal System Mitigating Systems Performance Index, Residual Heat Removal System Mitigating Systems Performance Index, Cooling Water Systems Reactor Coolant System Activity Reactor Coolant System Leakage Drill/Exercise Performance ERO Drill Participation Alert & Notification System Occupational Exposure Control Effectiveness RETS/ODCM Radiological Effluent
Farley 1 Unplanned Scrams per 7000 Critical Hrs Unplanned Power Changes per 7000 Critical Hrs Unplanned Scrams with Complications Safety System Functional Failures (PWR) Mitigating Systems Performance Index, Emergency AC Power System Mitigating Systems Performance Index, High Pressure Injection System Mitigating Systems Performance Index, Heat Removal System Mitigating Systems Performance Index, Residual Heat Removal System Mitigating Systems Performance Index, Cooling Water Systems Reactor Coolant System Activity Reactor Coolant System Leakage Drill/Exercise Performance ERO Drill Participation Alert & Notification System Occupational Exposure Control Effectiveness RETS/ODCM Radiological Effluent
Farley 2 Unplanned Scrams per 7000 Critical Hrs Unplanned Power Changes per 7000 Critical Hrs Unplanned Scrams with Complications Safety System Functional Failures (PWR) Mitigating Systems Performance Index, Emergency AC Power System Mitigating Systems Performance Index, High Pressure Injection System Mitigating Systems Performance Index, Heat Removal System Mitigating Systems Performance Index, Residual Heat Removal System Mitigating Systems Performance Index, Cooling Water Systems Reactor Coolant System Activity Reactor Coolant System Leakage Drill/Exercise Performance ERO Drill Participation Alert & Notification System Occupational Exposure Control Effectiveness RETS/ODCM Radiological Effluent
Fermi 2 Unplanned Scrams per 7000 Critical Hrs Unplanned Power Changes per 7000 Critical Hrs Unplanned Scrams with Complications Safety System Functional Failures (BWR) Mitigating Systems Performance Index, Emergency AC Power System Mitigating Systems Performance Index, High Pressure Injection System Mitigating Systems Performance Index, Heat Removal System Mitigating Systems Performance Index, Residual Heat Removal System Mitigating Systems Performance Index, Cooling Water Systems Reactor Coolant System Activity Reactor Coolant System Leakage Drill/Exercise Performance ERO Drill Participation Alert & Notification System Occupational Exposure Control Effectiveness RETS/ODCM Radiological Effluent
FitzPatrick Unplanned Scrams per 7000 Critical Hrs Unplanned Power Changes per 7000 Critical Hrs Unplanned Scrams with Complications Safety System Functional Failures (BWR) Mitigating Systems Performance Index, Emergency AC Power System Mitigating Systems Performance Index, High Pressure Injection System Mitigating Systems Performance Index, Heat Removal System Mitigating Systems Performance Index, Residual Heat Removal System Mitigating Systems Performance Index, Cooling Water Systems Reactor Coolant System Activity Reactor Coolant System Leakage Drill/Exercise Performance ERO Drill Participation Alert & Notification System Occupational Exposure Control Effectiveness RETS/ODCM Radiological Effluent
Fort Calhoun Unplanned Scrams per 7000 Critical Hrs Unplanned Power Changes per 7000 Critical Hrs Unplanned Scrams with Complications Safety System Functional Failures (PWR) Mitigating Systems Performance Index, Emergency AC Power System Mitigating Systems Performance Index, High Pressure Injection System Mitigating Systems Performance Index, Heat Removal System Mitigating Systems Performance Index, Residual Heat Removal System Mitigating Systems Performance Index, Cooling Water Systems Reactor Coolant System Activity Reactor Coolant System Leakage Drill/Exercise Performance ERO Drill Participation Alert & Notification System Occupational Exposure Control Effectiveness RETS/ODCM Radiological Effluent
Ginna Unplanned Scrams per 7000 Critical Hrs Unplanned Power Changes per 7000 Critical Hrs Unplanned Scrams with Complications Safety System Functional Failures (PWR) Mitigating Systems Performance Index, Emergency AC Power System Mitigating Systems Performance Index, High Pressure Injection System Mitigating Systems Performance Index, Heat Removal System Mitigating Systems Performance Index, Residual Heat Removal System Mitigating Systems Performance Index, Cooling Water Systems Reactor Coolant System Activity Reactor Coolant System Leakage Drill/Exercise Performance ERO Drill Participation Alert & Notification System Occupational Exposure Control Effectiveness RETS/ODCM Radiological Effluent
Grand Gulf 1 Unplanned Scrams per 7000 Critical Hrs Unplanned Power Changes per 7000 Critical Hrs Unplanned Scrams with Complications Safety System Functional Failures (BWR) Mitigating Systems Performance Index, Emergency AC Power System Mitigating Systems Performance Index, High Pressure Injection System Mitigating Systems Performance Index, Heat Removal System Mitigating Systems Performance Index, Residual Heat Removal System Mitigating Systems Performance Index, Cooling Water Systems Reactor Coolant System Activity Reactor Coolant System Leakage Drill/Exercise Performance ERO Drill Participation Alert & Notification System Occupational Exposure Control Effectiveness RETS/ODCM Radiological Effluent
Harris 1 Unplanned Scrams per 7000 Critical Hrs Unplanned Power Changes per 7000 Critical Hrs Unplanned Scrams with Complications Safety System Functional Failures (PWR) Mitigating Systems Performance Index, Emergency AC Power System Mitigating Systems Performance Index, High Pressure Injection System Mitigating Systems Performance Index, Heat Removal System Mitigating Systems Performance Index, Residual Heat Removal System Mitigating Systems Performance Index, Cooling Water Systems Reactor Coolant System Activity Reactor Coolant System Leakage Drill/Exercise Performance ERO Drill Participation Alert & Notification System Occupational Exposure Control Effectiveness RETS/ODCM Radiological Effluent
Hatch 1 Unplanned Scrams per 7000 Critical Hrs Unplanned Power Changes per 7000 Critical Hrs Unplanned Scrams with Complications Safety System Functional Failures (BWR) Mitigating Systems Performance Index, Emergency AC Power System Mitigating Systems Performance Index, High Pressure Injection System Mitigating Systems Performance Index, Heat Removal System Mitigating Systems Performance Index, Residual Heat Removal System Mitigating Systems Performance Index, Cooling Water Systems Reactor Coolant System Activity Reactor Coolant System Leakage Drill/Exercise Performance ERO Drill Participation Alert & Notification System Occupational Exposure Control Effectiveness RETS/ODCM Radiological Effluent
Hatch 2 Unplanned Scrams per 7000 Critical Hrs Unplanned Power Changes per 7000 Critical Hrs Unplanned Scrams with Complications Safety System Functional Failures (BWR) Mitigating Systems Performance Index, Emergency AC Power System Mitigating Systems Performance Index, High Pressure Injection System Mitigating Systems Performance Index, Heat Removal System Mitigating Systems Performance Index, Residual Heat Removal System Mitigating Systems Performance Index, Cooling Water Systems Reactor Coolant System Activity Reactor Coolant System Leakage Drill/Exercise Performance ERO Drill Participation Alert & Notification System Occupational Exposure Control Effectiveness RETS/ODCM Radiological Effluent
Hope Creek 1 Unplanned Scrams per 7000 Critical Hrs Unplanned Power Changes per 7000 Critical Hrs Unplanned Scrams with Complications Safety System Functional Failures (BWR) Mitigating Systems Performance Index, Emergency AC Power System Mitigating Systems Performance Index, High Pressure Injection System Mitigating Systems Performance Index, Heat Removal System Mitigating Systems Performance Index, Residual Heat Removal System Mitigating Systems Performance Index, Cooling Water Systems Reactor Coolant System Activity Reactor Coolant System Leakage Drill/Exercise Performance ERO Drill Participation Alert & Notification System Occupational Exposure Control Effectiveness RETS/ODCM Radiological Effluent
Indian Point 2 Unplanned Scrams per 7000 Critical Hrs Unplanned Power Changes per 7000 Critical Hrs Unplanned Scrams with Complications Safety System Functional Failures (PWR) Mitigating Systems Performance Index, Emergency AC Power System Mitigating Systems Performance Index, High Pressure Injection System Mitigating Systems Performance Index, Heat Removal System Mitigating Systems Performance Index, Residual Heat Removal System Mitigating Systems Performance Index, Cooling Water Systems Reactor Coolant System Activity Reactor Coolant System Leakage Drill/Exercise Performance ERO Drill Participation Alert & Notification System Occupational Exposure Control Effectiveness RETS/ODCM Radiological Effluent
Indian Point 3 Unplanned Scrams per 7000 Critical Hrs Unplanned Power Changes per 7000 Critical Hrs Unplanned Scrams with Complications Safety System Functional Failures (PWR) Mitigating Systems Performance Index, Emergency AC Power System Mitigating Systems Performance Index, High Pressure Injection System Mitigating Systems Performance Index, Heat Removal System Mitigating Systems Performance Index, Residual Heat Removal System Mitigating Systems Performance Index, Cooling Water Systems Reactor Coolant System Activity Reactor Coolant System Leakage Drill/Exercise Performance ERO Drill Participation Alert & Notification System Occupational Exposure Control Effectiveness RETS/ODCM Radiological Effluent
Kewaunee Unplanned Scrams per 7000 Critical Hrs Unplanned Power Changes per 7000 Critical Hrs Unplanned Scrams with Complications Safety System Functional Failures (PWR) Mitigating Systems Performance Index, Emergency AC Power System Mitigating Systems Performance Index, High Pressure Injection System Mitigating Systems Performance Index, Heat Removal System Mitigating Systems Performance Index, Residual Heat Removal System Mitigating Systems Performance Index, Cooling Water Systems Reactor Coolant System Activity Reactor Coolant System Leakage Drill/Exercise Performance ERO Drill Participation Alert & Notification System Occupational Exposure Control Effectiveness RETS/ODCM Radiological Effluent
La Salle 1 Unplanned Scrams per 7000 Critical Hrs Unplanned Power Changes per 7000 Critical Hrs Unplanned Scrams with Complications Safety System Functional Failures (BWR) Mitigating Systems Performance Index, Emergency AC Power System Mitigating Systems Performance Index, High Pressure Injection System Mitigating Systems Performance Index, Heat Removal System Mitigating Systems Performance Index, Residual Heat Removal System Mitigating Systems Performance Index, Cooling Water Systems Reactor Coolant System Activity Reactor Coolant System Leakage Drill/Exercise Performance ERO Drill Participation Alert & Notification System Occupational Exposure Control Effectiveness RETS/ODCM Radiological Effluent
La Salle 2 Unplanned Scrams per 7000 Critical Hrs Unplanned Power Changes per 7000 Critical Hrs Unplanned Scrams with Complications Safety System Functional Failures (BWR) Mitigating Systems Performance Index, Emergency AC Power System Mitigating Systems Performance Index, High Pressure Injection System Mitigating Systems Performance Index, Heat Removal System Mitigating Systems Performance Index, Residual Heat Removal System Mitigating Systems Performance Index, Cooling Water Systems Reactor Coolant System Activity Reactor Coolant System Leakage Drill/Exercise Performance ERO Drill Participation Alert & Notification System Occupational Exposure Control Effectiveness RETS/ODCM Radiological Effluent
Limerick 1 Unplanned Scrams per 7000 Critical Hrs Unplanned Power Changes per 7000 Critical Hrs Unplanned Scrams with Complications Safety System Functional Failures (BWR) Mitigating Systems Performance Index, Emergency AC Power System Mitigating Systems Performance Index, High Pressure Injection System Mitigating Systems Performance Index, Heat Removal System Mitigating Systems Performance Index, Residual Heat Removal System Mitigating Systems Performance Index, Cooling Water Systems Reactor Coolant System Activity Reactor Coolant System Leakage Drill/Exercise Performance ERO Drill Participation Alert & Notification System Occupational Exposure Control Effectiveness RETS/ODCM Radiological Effluent
Limerick 2 Unplanned Scrams per 7000 Critical Hrs Unplanned Power Changes per 7000 Critical Hrs Unplanned Scrams with Complications Safety System Functional Failures (BWR) Mitigating Systems Performance Index, Emergency AC Power System Mitigating Systems Performance Index, High Pressure Injection System Mitigating Systems Performance Index, Heat Removal System Mitigating Systems Performance Index, Residual Heat Removal System Mitigating Systems Performance Index, Cooling Water Systems Reactor Coolant System Activity Reactor Coolant System Leakage Drill/Exercise Performance ERO Drill Participation Alert & Notification System Occupational Exposure Control Effectiveness RETS/ODCM Radiological Effluent
McGuire 1 Unplanned Scrams per 7000 Critical Hrs Unplanned Power Changes per 7000 Critical Hrs Unplanned Scrams with Complications Safety System Functional Failures (PWR) Mitigating Systems Performance Index, Emergency AC Power System Mitigating Systems Performance Index, High Pressure Injection System Mitigating Systems Performance Index, Heat Removal System Mitigating Systems Performance Index, Residual Heat Removal System Mitigating Systems Performance Index, Cooling Water Systems Reactor Coolant System Activity Reactor Coolant System Leakage Drill/Exercise Performance ERO Drill Participation Alert & Notification System Occupational Exposure Control Effectiveness RETS/ODCM Radiological Effluent
McGuire 2 Unplanned Scrams per 7000 Critical Hrs Unplanned Power Changes per 7000 Critical Hrs Unplanned Scrams with Complications Safety System Functional Failures (PWR) Mitigating Systems Performance Index, Emergency AC Power System Mitigating Systems Performance Index, High Pressure Injection System Mitigating Systems Performance Index, Heat Removal System Mitigating Systems Performance Index, Residual Heat Removal System Mitigating Systems Performance Index, Cooling Water Systems Reactor Coolant System Activity Reactor Coolant System Leakage Drill/Exercise Performance ERO Drill Participation Alert & Notification System Occupational Exposure Control Effectiveness RETS/ODCM Radiological Effluent
Millstone 2 Unplanned Scrams per 7000 Critical Hrs Unplanned Power Changes per 7000 Critical Hrs Unplanned Scrams with Complications Safety System Functional Failures (PWR) Mitigating Systems Performance Index, Emergency AC Power System Mitigating Systems Performance Index, High Pressure Injection System Mitigating Systems Performance Index, Heat Removal System Mitigating Systems Performance Index, Residual Heat Removal System Mitigating Systems Performance Index, Cooling Water Systems Reactor Coolant System Activity Reactor Coolant System Leakage Drill/Exercise Performance ERO Drill Participation Alert & Notification System Occupational Exposure Control Effectiveness RETS/ODCM Radiological Effluent
Millstone 3 Unplanned Scrams per 7000 Critical Hrs Unplanned Power Changes per 7000 Critical Hrs Unplanned Scrams with Complications Safety System Functional Failures (PWR) Mitigating Systems Performance Index, Emergency AC Power System Mitigating Systems Performance Index, High Pressure Injection System Mitigating Systems Performance Index, Heat Removal System Mitigating Systems Performance Index, Residual Heat Removal System Mitigating Systems Performance Index, Cooling Water Systems Reactor Coolant System Activity Reactor Coolant System Leakage Drill/Exercise Performance ERO Drill Participation Alert & Notification System Occupational Exposure Control Effectiveness RETS/ODCM Radiological Effluent
Monticello Unplanned Scrams per 7000 Critical Hrs Unplanned Power Changes per 7000 Critical Hrs Unplanned Scrams with Complications Safety System Functional Failures (BWR) Mitigating Systems Performance Index, Emergency AC Power System Mitigating Systems Performance Index, High Pressure Injection System Mitigating Systems Performance Index, Heat Removal System Mitigating Systems Performance Index, Residual Heat Removal System Mitigating Systems Performance Index, Cooling Water Systems Reactor Coolant System Activity Reactor Coolant System Leakage Drill/Exercise Performance ERO Drill Participation Alert & Notification System Occupational Exposure Control Effectiveness RETS/ODCM Radiological Effluent
Nine Mile Point 1 Unplanned Scrams per 7000 Critical Hrs Unplanned Power Changes per 7000 Critical Hrs Unplanned Scrams with Complications Safety System Functional Failures (BWR) Mitigating Systems Performance Index, Emergency AC Power System Mitigating Systems Performance Index, High Pressure Injection System Mitigating Systems Performance Index, Heat Removal System Mitigating Systems Performance Index, Residual Heat Removal System Mitigating Systems Performance Index, Cooling Water Systems Reactor Coolant System Activity Reactor Coolant System Leakage Drill/Exercise Performance ERO Drill Participation Alert & Notification System Occupational Exposure Control Effectiveness RETS/ODCM Radiological Effluent
Nine Mile Point 2 Unplanned Scrams per 7000 Critical Hrs Unplanned Power Changes per 7000 Critical Hrs Unplanned Scrams with Complications Safety System Functional Failures (BWR) Mitigating Systems Performance Index, Emergency AC Power System Mitigating Systems Performance Index, High Pressure Injection System Mitigating Systems Performance Index, Heat Removal System Mitigating Systems Performance Index, Residual Heat Removal System Mitigating Systems Performance Index, Cooling Water Systems Reactor Coolant System Activity Reactor Coolant System Leakage Drill/Exercise Performance ERO Drill Participation Alert & Notification System Occupational Exposure Control Effectiveness RETS/ODCM Radiological Effluent
North Anna 1 Unplanned Scrams per 7000 Critical Hrs Unplanned Power Changes per 7000 Critical Hrs Unplanned Scrams with Complications Safety System Functional Failures (PWR) Mitigating Systems Performance Index, Emergency AC Power System Mitigating Systems Performance Index, High Pressure Injection System Mitigating Systems Performance Index, Heat Removal System Mitigating Systems Performance Index, Residual Heat Removal System Mitigating Systems Performance Index, Cooling Water Systems Reactor Coolant System Activity Reactor Coolant System Leakage Drill/Exercise Performance ERO Drill Participation Alert & Notification System Occupational Exposure Control Effectiveness RETS/ODCM Radiological Effluent
North Anna 2 Unplanned Scrams per 7000 Critical Hrs Unplanned Power Changes per 7000 Critical Hrs Unplanned Scrams with Complications Safety System Functional Failures (PWR) Mitigating Systems Performance Index, Emergency AC Power System Mitigating Systems Performance Index, High Pressure Injection System Mitigating Systems Performance Index, Heat Removal System Mitigating Systems Performance Index, Residual Heat Removal System Mitigating Systems Performance Index, Cooling Water Systems Reactor Coolant System Activity Reactor Coolant System Leakage Drill/Exercise Performance ERO Drill Participation Alert & Notification System Occupational Exposure Control Effectiveness RETS/ODCM Radiological Effluent
Oconee 1 Unplanned Scrams per 7000 Critical Hrs Unplanned Power Changes per 7000 Critical Hrs Unplanned Scrams with Complications Safety System Functional Failures (PWR) Mitigating Systems Performance Index, Emergency AC Power System Mitigating Systems Performance Index, High Pressure Injection System Mitigating Systems Performance Index, Heat Removal System Mitigating Systems Performance Index, Residual Heat Removal System Mitigating Systems Performance Index, Cooling Water Systems Reactor Coolant System Activity Reactor Coolant System Leakage Drill/Exercise Performance ERO Drill Participation Alert & Notification System Occupational Exposure Control Effectiveness RETS/ODCM Radiological Effluent
Oconee 2 Unplanned Scrams per 7000 Critical Hrs Unplanned Power Changes per 7000 Critical Hrs Unplanned Scrams with Complications Safety System Functional Failures (PWR) Mitigating Systems Performance Index, Emergency AC Power System Mitigating Systems Performance Index, High Pressure Injection System Mitigating Systems Performance Index, Heat Removal System Mitigating Systems Performance Index, Residual Heat Removal System Mitigating Systems Performance Index, Cooling Water Systems Reactor Coolant System Activity Reactor Coolant System Leakage Drill/Exercise Performance ERO Drill Participation Alert & Notification System Occupational Exposure Control Effectiveness RETS/ODCM Radiological Effluent
Oconee 3 Unplanned Scrams per 7000 Critical Hrs Unplanned Power Changes per 7000 Critical Hrs Unplanned Scrams with Complications Safety System Functional Failures (PWR) Mitigating Systems Performance Index, Emergency AC Power System Mitigating Systems Performance Index, High Pressure Injection System Mitigating Systems Performance Index, Heat Removal System Mitigating Systems Performance Index, Residual Heat Removal System Mitigating Systems Performance Index, Cooling Water Systems Reactor Coolant System Activity Reactor Coolant System Leakage Drill/Exercise Performance ERO Drill Participation Alert & Notification System Occupational Exposure Control Effectiveness RETS/ODCM Radiological Effluent
Oyster Creek Unplanned Scrams per 7000 Critical Hrs Unplanned Power Changes per 7000 Critical Hrs Unplanned Scrams with Complications Safety System Functional Failures (BWR) Mitigating Systems Performance Index, Emergency AC Power System Mitigating Systems Performance Index, High Pressure Injection System Mitigating Systems Performance Index, Heat Removal System Mitigating Systems Performance Index, Residual Heat Removal System Mitigating Systems Performance Index, Cooling Water Systems Reactor Coolant System Activity Reactor Coolant System Leakage Drill/Exercise Performance ERO Drill Participation Alert & Notification System Occupational Exposure Control Effectiveness RETS/ODCM Radiological Effluent
Palisades Unplanned Scrams per 7000 Critical Hrs Unplanned Power Changes per 7000 Critical Hrs Unplanned Scrams with Complications Safety System Functional Failures (PWR) Mitigating Systems Performance Index, Emergency AC Power System Mitigating Systems Performance Index, High Pressure Injection System Mitigating Systems Performance Index, Heat Removal System Mitigating Systems Performance Index, Residual Heat Removal System Mitigating Systems Performance Index, Cooling Water Systems Reactor Coolant System Activity Reactor Coolant System Leakage Drill/Exercise Performance ERO Drill Participation Alert & Notification System Occupational Exposure Control Effectiveness RETS/ODCM Radiological Effluent
Palo Verde 1 Unplanned Scrams per 7000 Critical Hrs Unplanned Power Changes per 7000 Critical Hrs Unplanned Scrams with Complications Safety System Functional Failures (PWR) Mitigating Systems Performance Index, Emergency AC Power System Mitigating Systems Performance Index, High Pressure Injection System Mitigating Systems Performance Index, Heat Removal System Mitigating Systems Performance Index, Residual Heat Removal System Mitigating Systems Performance Index, Cooling Water Systems Reactor Coolant System Activity Reactor Coolant System Leakage Drill/Exercise Performance ERO Drill Participation Alert & Notification System Occupational Exposure Control Effectiveness RETS/ODCM Radiological Effluent
Palo Verde 2 Unplanned Scrams per 7000 Critical Hrs Unplanned Power Changes per 7000 Critical Hrs Unplanned Scrams with Complications Safety System Functional Failures (PWR) Mitigating Systems Performance Index, Emergency AC Power System Mitigating Systems Performance Index, High Pressure Injection System Mitigating Systems Performance Index, Heat Removal System Mitigating Systems Performance Index, Residual Heat Removal System Mitigating Systems Performance Index, Cooling Water Systems Reactor Coolant System Activity Reactor Coolant System Leakage Drill/Exercise Performance ERO Drill Participation Alert & Notification System Occupational Exposure Control Effectiveness RETS/ODCM Radiological Effluent
Palo Verde 3 Unplanned Scrams per 7000 Critical Hrs Unplanned Power Changes per 7000 Critical Hrs Unplanned Scrams with Complications Safety System Functional Failures (PWR) Mitigating Systems Performance Index, Emergency AC Power System Mitigating Systems Performance Index, High Pressure Injection System Mitigating Systems Performance Index, Heat Removal System Mitigating Systems Performance Index, Residual Heat Removal System Mitigating Systems Performance Index, Cooling Water Systems Reactor Coolant System Activity Reactor Coolant System Leakage Drill/Exercise Performance ERO Drill Participation Alert & Notification System Occupational Exposure Control Effectiveness RETS/ODCM Radiological Effluent
Peach Bottom 2 Unplanned Scrams per 7000 Critical Hrs Unplanned Power Changes per 7000 Critical Hrs Unplanned Scrams with Complications Safety System Functional Failures (BWR) Mitigating Systems Performance Index, Emergency AC Power System Mitigating Systems Performance Index, High Pressure Injection System Mitigating Systems Performance Index, Heat Removal System Mitigating Systems Performance Index, Residual Heat Removal System Mitigating Systems Performance Index, Cooling Water Systems Reactor Coolant System Activity Reactor Coolant System Leakage Drill/Exercise Performance ERO Drill Participation Alert & Notification System Occupational Exposure Control Effectiveness RETS/ODCM Radiological Effluent
Peach Bottom 3 Unplanned Scrams per 7000 Critical Hrs Unplanned Power Changes per 7000 Critical Hrs Unplanned Scrams with Complications Safety System Functional Failures (BWR) Mitigating Systems Performance Index, Emergency AC Power System Mitigating Systems Performance Index, High Pressure Injection System Mitigating Systems Performance Index, Heat Removal System Mitigating Systems Performance Index, Residual Heat Removal System Mitigating Systems Performance Index, Cooling Water Systems Reactor Coolant System Activity Reactor Coolant System Leakage Drill/Exercise Performance ERO Drill Participation Alert & Notification System Occupational Exposure Control Effectiveness RETS/ODCM Radiological Effluent
Perry 1 Unplanned Scrams per 7000 Critical Hrs Unplanned Power Changes per 7000 Critical Hrs Unplanned Scrams with Complications Safety System Functional Failures (BWR) Mitigating Systems Performance Index, Emergency AC Power System Mitigating Systems Performance Index, High Pressure Injection System Mitigating Systems Performance Index, Heat Removal System Mitigating Systems Performance Index, Residual Heat Removal System Mitigating Systems Performance Index, Cooling Water Systems Reactor Coolant System Activity Reactor Coolant System Leakage Drill/Exercise Performance ERO Drill Participation Alert & Notification System Occupational Exposure Control Effectiveness RETS/ODCM Radiological Effluent
Pilgrim 1 Unplanned Scrams per 7000 Critical Hrs Unplanned Power Changes per 7000 Critical Hrs Unplanned Scrams with Complications Safety System Functional Failures (BWR) Mitigating Systems Performance Index, Emergency AC Power System Mitigating Systems Performance Index, High Pressure Injection System Mitigating Systems Performance Index, Heat Removal System Mitigating Systems Performance Index, Residual Heat Removal System Mitigating Systems Performance Index, Cooling Water Systems Reactor Coolant System Activity Reactor Coolant System Leakage Drill/Exercise Performance ERO Drill Participation Alert & Notification System Occupational Exposure Control Effectiveness RETS/ODCM Radiological Effluent
Point Beach 1 Unplanned Scrams per 7000 Critical Hrs Unplanned Power Changes per 7000 Critical Hrs Unplanned Scrams with Complications Safety System Functional Failures (PWR) Mitigating Systems Performance Index, Emergency AC Power System Mitigating Systems Performance Index, High Pressure Injection System Mitigating Systems Performance Index, Heat Removal System Mitigating Systems Performance Index, Residual Heat Removal System Mitigating Systems Performance Index, Cooling Water Systems Reactor Coolant System Activity Reactor Coolant System Leakage Drill/Exercise Performance ERO Drill Participation Alert & Notification System Occupational Exposure Control Effectiveness RETS/ODCM Radiological Effluent
Point Beach 2 Unplanned Scrams per 7000 Critical Hrs Unplanned Power Changes per 7000 Critical Hrs Unplanned Scrams with Complications Safety System Functional Failures (PWR) Mitigating Systems Performance Index, Emergency AC Power System Mitigating Systems Performance Index, High Pressure Injection System Mitigating Systems Performance Index, Heat Removal System Mitigating Systems Performance Index, Residual Heat Removal System Mitigating Systems Performance Index, Cooling Water Systems Reactor Coolant System Activity Reactor Coolant System Leakage Drill/Exercise Performance ERO Drill Participation Alert & Notification System Occupational Exposure Control Effectiveness RETS/ODCM Radiological Effluent
Prairie Island 1 Unplanned Scrams per 7000 Critical Hrs Unplanned Power Changes per 7000 Critical Hrs Unplanned Scrams with Complications Safety System Functional Failures (PWR) Mitigating Systems Performance Index, Emergency AC Power System Mitigating Systems Performance Index, High Pressure Injection System Mitigating Systems Performance Index, Heat Removal System Mitigating Systems Performance Index, Residual Heat Removal System Mitigating Systems Performance Index, Cooling Water Systems Reactor Coolant System Activity Reactor Coolant System Leakage Drill/Exercise Performance ERO Drill Participation Alert & Notification System Occupational Exposure Control Effectiveness RETS/ODCM Radiological Effluent
Prairie Island 2 Unplanned Scrams per 7000 Critical Hrs Unplanned Power Changes per 7000 Critical Hrs Unplanned Scrams with Complications Safety System Functional Failures (PWR) Mitigating Systems Performance Index, Emergency AC Power System Mitigating Systems Performance Index, High Pressure Injection System Mitigating Systems Performance Index, Heat Removal System Mitigating Systems Performance Index, Residual Heat Removal System Mitigating Systems Performance Index, Cooling Water Systems Reactor Coolant System Activity Reactor Coolant System Leakage Drill/Exercise Performance ERO Drill Participation Alert & Notification System Occupational Exposure Control Effectiveness RETS/ODCM Radiological Effluent
Quad Cities 1 Unplanned Scrams per 7000 Critical Hrs Unplanned Power Changes per 7000 Critical Hrs Unplanned Scrams with Complications Safety System Functional Failures (BWR) Mitigating Systems Performance Index, Emergency AC Power System Mitigating Systems Performance Index, High Pressure Injection System Mitigating Systems Performance Index, Heat Removal System Mitigating Systems Performance Index, Residual Heat Removal System Mitigating Systems Performance Index, Cooling Water Systems Reactor Coolant System Activity Reactor Coolant System Leakage Drill/Exercise Performance ERO Drill Participation Alert & Notification System Occupational Exposure Control Effectiveness RETS/ODCM Radiological Effluent
Quad Cities 2 Unplanned Scrams per 7000 Critical Hrs Unplanned Power Changes per 7000 Critical Hrs Unplanned Scrams with Complications Safety System Functional Failures (BWR) Mitigating Systems Performance Index, Emergency AC Power System Mitigating Systems Performance Index, High Pressure Injection System Mitigating Systems Performance Index, Heat Removal System Mitigating Systems Performance Index, Residual Heat Removal System Mitigating Systems Performance Index, Cooling Water Systems Reactor Coolant System Activity Reactor Coolant System Leakage Drill/Exercise Performance ERO Drill Participation Alert & Notification System Occupational Exposure Control Effectiveness RETS/ODCM Radiological Effluent
River Bend 1 Unplanned Scrams per 7000 Critical Hrs Unplanned Power Changes per 7000 Critical Hrs Unplanned Scrams with Complications Safety System Functional Failures (BWR) Mitigating Systems Performance Index, Emergency AC Power System Mitigating Systems Performance Index, High Pressure Injection System Mitigating Systems Performance Index, Heat Removal System Mitigating Systems Performance Index, Residual Heat Removal System Mitigating Systems Performance Index, Cooling Water Systems Reactor Coolant System Activity Reactor Coolant System Leakage Drill/Exercise Performance ERO Drill Participation Alert & Notification System Occupational Exposure Control Effectiveness RETS/ODCM Radiological Effluent
Robinson 2 Unplanned Scrams per 7000 Critical Hrs Unplanned Power Changes per 7000 Critical Hrs Unplanned Scrams with Complications Safety System Functional Failures (PWR) Mitigating Systems Performance Index, Emergency AC Power System Mitigating Systems Performance Index, High Pressure Injection System Mitigating Systems Performance Index, Heat Removal System Mitigating Systems Performance Index, Residual Heat Removal System Mitigating Systems Performance Index, Cooling Water Systems Reactor Coolant System Activity Reactor Coolant System Leakage Drill/Exercise Performance ERO Drill Participation Alert & Notification System Occupational Exposure Control Effectiveness RETS/ODCM Radiological Effluent
Saint Lucie 1 Unplanned Scrams per 7000 Critical Hrs Unplanned Power Changes per 7000 Critical Hrs Unplanned Scrams with Complications Safety System Functional Failures (PWR) Mitigating Systems Performance Index, Emergency AC Power System Mitigating Systems Performance Index, High Pressure Injection System Mitigating Systems Performance Index, Heat Removal System Mitigating Systems Performance Index, Residual Heat Removal System Mitigating Systems Performance Index, Cooling Water Systems Reactor Coolant System Activity Reactor Coolant System Leakage Drill/Exercise Performance ERO Drill Participation Alert & Notification System Occupational Exposure Control Effectiveness RETS/ODCM Radiological Effluent
Saint Lucie 2 Unplanned Scrams per 7000 Critical Hrs Unplanned Power Changes per 7000 Critical Hrs Unplanned Scrams with Complications Safety System Functional Failures (PWR) Mitigating Systems Performance Index, Emergency AC Power System Mitigating Systems Performance Index, High Pressure Injection System Mitigating Systems Performance Index, Heat Removal System Mitigating Systems Performance Index, Residual Heat Removal System Mitigating Systems Performance Index, Cooling Water Systems Reactor Coolant System Activity Reactor Coolant System Leakage Drill/Exercise Performance ERO Drill Participation Alert & Notification System Occupational Exposure Control Effectiveness RETS/ODCM Radiological Effluent
Salem 1 Unplanned Scrams per 7000 Critical Hrs Unplanned Power Changes per 7000 Critical Hrs Unplanned Scrams with Complications Safety System Functional Failures (PWR) Mitigating Systems Performance Index, Emergency AC Power System Mitigating Systems Performance Index, High Pressure Injection System Mitigating Systems Performance Index, Heat Removal System Mitigating Systems Performance Index, Residual Heat Removal System Mitigating Systems Performance Index, Cooling Water Systems Reactor Coolant System Activity Reactor Coolant System Leakage Drill/Exercise Performance ERO Drill Participation Alert & Notification System Occupational Exposure Control Effectiveness RETS/ODCM Radiological Effluent
Salem 2 Unplanned Scrams per 7000 Critical Hrs Unplanned Power Changes per 7000 Critical Hrs Unplanned Scrams with Complications Safety System Functional Failures (PWR) Mitigating Systems Performance Index, Emergency AC Power System Mitigating Systems Performance Index, High Pressure Injection System Mitigating Systems Performance Index, Heat Removal System Mitigating Systems Performance Index, Residual Heat Removal System Mitigating Systems Performance Index, Cooling Water Systems Reactor Coolant System Activity Reactor Coolant System Leakage Drill/Exercise Performance ERO Drill Participation Alert & Notification System Occupational Exposure Control Effectiveness RETS/ODCM Radiological Effluent
San Onofre 2 Unplanned Scrams per 7000 Critical Hrs Unplanned Power Changes per 7000 Critical Hrs Unplanned Scrams with Complications Safety System Functional Failures (PWR) Mitigating Systems Performance Index, Emergency AC Power System Mitigating Systems Performance Index, High Pressure Injection System Mitigating Systems Performance Index, Heat Removal System Mitigating Systems Performance Index, Residual Heat Removal System Mitigating Systems Performance Index, Cooling Water Systems Reactor Coolant System Activity Reactor Coolant System Leakage Drill/Exercise Performance ERO Drill Participation Alert & Notification System Occupational Exposure Control Effectiveness RETS/ODCM Radiological Effluent
San Onofre 3 Unplanned Scrams per 7000 Critical Hrs Unplanned Power Changes per 7000 Critical Hrs Unplanned Scrams with Complications Safety System Functional Failures (PWR) Mitigating Systems Performance Index, Emergency AC Power System Mitigating Systems Performance Index, High Pressure Injection System Mitigating Systems Performance Index, Heat Removal System Mitigating Systems Performance Index, Residual Heat Removal System Mitigating Systems Performance Index, Cooling Water Systems Reactor Coolant System Activity Reactor Coolant System Leakage Drill/Exercise Performance ERO Drill Participation Alert & Notification System Occupational Exposure Control Effectiveness RETS/ODCM Radiological Effluent
Seabrook 1 Unplanned Scrams per 7000 Critical Hrs Unplanned Power Changes per 7000 Critical Hrs Unplanned Scrams with Complications Safety System Functional Failures (PWR) Mitigating Systems Performance Index, Emergency AC Power System Mitigating Systems Performance Index, High Pressure Injection System Mitigating Systems Performance Index, Heat Removal System Mitigating Systems Performance Index, Residual Heat Removal System Mitigating Systems Performance Index, Cooling Water Systems Reactor Coolant System Activity Reactor Coolant System Leakage Drill/Exercise Performance ERO Drill Participation Alert & Notification System Occupational Exposure Control Effectiveness RETS/ODCM Radiological Effluent
Sequoyah 1 Unplanned Scrams per 7000 Critical Hrs Unplanned Power Changes per 7000 Critical Hrs Unplanned Scrams with Complications Safety System Functional Failures (PWR) Mitigating Systems Performance Index, Emergency AC Power System Mitigating Systems Performance Index, High Pressure Injection System Mitigating Systems Performance Index, Heat Removal System Mitigating Systems Performance Index, Residual Heat Removal System Mitigating Systems Performance Index, Cooling Water Systems Reactor Coolant System Activity Reactor Coolant System Leakage Drill/Exercise Performance ERO Drill Participation Alert & Notification System Occupational Exposure Control Effectiveness RETS/ODCM Radiological Effluent
Sequoyah 2 Unplanned Scrams per 7000 Critical Hrs Unplanned Power Changes per 7000 Critical Hrs Unplanned Scrams with Complications Safety System Functional Failures (PWR) Mitigating Systems Performance Index, Emergency AC Power System Mitigating Systems Performance Index, High Pressure Injection System Mitigating Systems Performance Index, Heat Removal System Mitigating Systems Performance Index, Residual Heat Removal System Mitigating Systems Performance Index, Cooling Water Systems Reactor Coolant System Activity Reactor Coolant System Leakage Drill/Exercise Performance ERO Drill Participation Alert & Notification System Occupational Exposure Control Effectiveness RETS/ODCM Radiological Effluent
South Texas 1 Unplanned Scrams per 7000 Critical Hrs Unplanned Power Changes per 7000 Critical Hrs Unplanned Scrams with Complications Safety System Functional Failures (PWR) Mitigating Systems Performance Index, Emergency AC Power System Mitigating Systems Performance Index, High Pressure Injection System Mitigating Systems Performance Index, Heat Removal System Mitigating Systems Performance Index, Residual Heat Removal System Mitigating Systems Performance Index, Cooling Water Systems Reactor Coolant System Activity Reactor Coolant System Leakage Drill/Exercise Performance ERO Drill Participation Alert & Notification System Occupational Exposure Control Effectiveness RETS/ODCM Radiological Effluent
South Texas 2 Unplanned Scrams per 7000 Critical Hrs Unplanned Power Changes per 7000 Critical Hrs Unplanned Scrams with Complications Safety System Functional Failures (PWR) Mitigating Systems Performance Index, Emergency AC Power System Mitigating Systems Performance Index, High Pressure Injection System Mitigating Systems Performance Index, Heat Removal System Mitigating Systems Performance Index, Residual Heat Removal System Mitigating Systems Performance Index, Cooling Water Systems Reactor Coolant System Activity Reactor Coolant System Leakage Drill/Exercise Performance ERO Drill Participation Alert & Notification System Occupational Exposure Control Effectiveness RETS/ODCM Radiological Effluent
Summer Unplanned Scrams per 7000 Critical Hrs Unplanned Power Changes per 7000 Critical Hrs Unplanned Scrams with Complications Safety System Functional Failures (PWR) Mitigating Systems Performance Index, Emergency AC Power System Mitigating Systems Performance Index, High Pressure Injection System Mitigating Systems Performance Index, Heat Removal System Mitigating Systems Performance Index, Residual Heat Removal System Mitigating Systems Performance Index, Cooling Water Systems Reactor Coolant System Activity Reactor Coolant System Leakage Drill/Exercise Performance ERO Drill Participation Alert & Notification System Occupational Exposure Control Effectiveness RETS/ODCM Radiological Effluent
Surry 1 Unplanned Scrams per 7000 Critical Hrs Unplanned Power Changes per 7000 Critical Hrs Unplanned Scrams with Complications Safety System Functional Failures (PWR) Mitigating Systems Performance Index, Emergency AC Power System Mitigating Systems Performance Index, High Pressure Injection System Mitigating Systems Performance Index, Heat Removal System Mitigating Systems Performance Index, Residual Heat Removal System Mitigating Systems Performance Index, Cooling Water Systems Reactor Coolant System Activity Reactor Coolant System Leakage Drill/Exercise Performance ERO Drill Participation Alert & Notification System Occupational Exposure Control Effectiveness RETS/ODCM Radiological Effluent
Surry 2 Unplanned Scrams per 7000 Critical Hrs Unplanned Power Changes per 7000 Critical Hrs Unplanned Scrams with Complications Safety System Functional Failures (PWR) Mitigating Systems Performance Index, Emergency AC Power System Mitigating Systems Performance Index, High Pressure Injection System Mitigating Systems Performance Index, Heat Removal System Mitigating Systems Performance Index, Residual Heat Removal System Mitigating Systems Performance Index, Cooling Water Systems Reactor Coolant System Activity Reactor Coolant System Leakage Drill/Exercise Performance ERO Drill Participation Alert & Notification System Occupational Exposure Control Effectiveness RETS/ODCM Radiological Effluent
Susquehanna 1 Unplanned Scrams per 7000 Critical Hrs Unplanned Power Changes per 7000 Critical Hrs Unplanned Scrams with Complications Safety System Functional Failures (BWR) Mitigating Systems Performance Index, Emergency AC Power System Mitigating Systems Performance Index, High Pressure Injection System Mitigating Systems Performance Index, Heat Removal System Mitigating Systems Performance Index, Residual Heat Removal System Mitigating Systems Performance Index, Cooling Water Systems Reactor Coolant System Activity Reactor Coolant System Leakage Drill/Exercise Performance ERO Drill Participation Alert & Notification System Occupational Exposure Control Effectiveness RETS/ODCM Radiological Effluent
Susquehanna 2 Unplanned Scrams per 7000 Critical Hrs Unplanned Power Changes per 7000 Critical Hrs Unplanned Scrams with Complications Safety System Functional Failures (BWR) Mitigating Systems Performance Index, Emergency AC Power System Mitigating Systems Performance Index, High Pressure Injection System Mitigating Systems Performance Index, Heat Removal System Mitigating Systems Performance Index, Residual Heat Removal System Mitigating Systems Performance Index, Cooling Water Systems Reactor Coolant System Activity Reactor Coolant System Leakage Drill/Exercise Performance ERO Drill Participation Alert & Notification System Occupational Exposure Control Effectiveness RETS/ODCM Radiological Effluent
Three Mile Island 1 Unplanned Scrams per 7000 Critical Hrs Unplanned Power Changes per 7000 Critical Hrs Unplanned Scrams with Complications Safety System Functional Failures (PWR) Mitigating Systems Performance Index, Emergency AC Power System Mitigating Systems Performance Index, High Pressure Injection System Mitigating Systems Performance Index, Heat Removal System Mitigating Systems Performance Index, Residual Heat Removal System Mitigating Systems Performance Index, Cooling Water Systems Reactor Coolant System Activity Reactor Coolant System Leakage Drill/Exercise Performance ERO Drill Participation Alert & Notification System Occupational Exposure Control Effectiveness RETS/ODCM Radiological Effluent
Turkey Point 3 Unplanned Scrams per 7000 Critical Hrs Unplanned Power Changes per 7000 Critical Hrs Unplanned Scrams with Complications Safety System Functional Failures (PWR) Mitigating Systems Performance Index, Emergency AC Power System Mitigating Systems Performance Index, High Pressure Injection System Mitigating Systems Performance Index, Heat Removal System Mitigating Systems Performance Index, Residual Heat Removal System Mitigating Systems Performance Index, Cooling Water Systems Reactor Coolant System Activity Reactor Coolant System Leakage Drill/Exercise Performance ERO Drill Participation Alert & Notification System Occupational Exposure Control Effectiveness RETS/ODCM Radiological Effluent
Turkey Point 4 Unplanned Scrams per 7000 Critical Hrs Unplanned Power Changes per 7000 Critical Hrs Unplanned Scrams with Complications Safety System Functional Failures (PWR) Mitigating Systems Performance Index, Emergency AC Power System Mitigating Systems Performance Index, High Pressure Injection System Mitigating Systems Performance Index, Heat Removal System Mitigating Systems Performance Index, Residual Heat Removal System Mitigating Systems Performance Index, Cooling Water Systems Reactor Coolant System Activity Reactor Coolant System Leakage Drill/Exercise Performance ERO Drill Participation Alert & Notification System Occupational Exposure Control Effectiveness RETS/ODCM Radiological Effluent
Vermont Yankee Unplanned Scrams per 7000 Critical Hrs Unplanned Power Changes per 7000 Critical Hrs Unplanned Scrams with Complications Safety System Functional Failures (BWR) Mitigating Systems Performance Index, Emergency AC Power System Mitigating Systems Performance Index, High Pressure Injection System Mitigating Systems Performance Index, Heat Removal System Mitigating Systems Performance Index, Residual Heat Removal System Mitigating Systems Performance Index, Cooling Water Systems Reactor Coolant System Activity Reactor Coolant System Leakage Drill/Exercise Performance ERO Drill Participation Alert & Notification System Occupational Exposure Control Effectiveness RETS/ODCM Radiological Effluent
Vogtle 1 Unplanned Scrams per 7000 Critical Hrs Unplanned Power Changes per 7000 Critical Hrs Unplanned Scrams with Complications Safety System Functional Failures (PWR) Mitigating Systems Performance Index, Emergency AC Power System Mitigating Systems Performance Index, High Pressure Injection System Mitigating Systems Performance Index, Heat Removal System Mitigating Systems Performance Index, Residual Heat Removal System Mitigating Systems Performance Index, Cooling Water Systems Reactor Coolant System Activity Reactor Coolant System Leakage Drill/Exercise Performance ERO Drill Participation Alert & Notification System Occupational Exposure Control Effectiveness RETS/ODCM Radiological Effluent
Vogtle 2 Unplanned Scrams per 7000 Critical Hrs Unplanned Power Changes per 7000 Critical Hrs Unplanned Scrams with Complications Safety System Functional Failures (PWR) Mitigating Systems Performance Index, Emergency AC Power System Mitigating Systems Performance Index, High Pressure Injection System Mitigating Systems Performance Index, Heat Removal System Mitigating Systems Performance Index, Residual Heat Removal System Mitigating Systems Performance Index, Cooling Water Systems Reactor Coolant System Activity Reactor Coolant System Leakage Drill/Exercise Performance ERO Drill Participation Alert & Notification System Occupational Exposure Control Effectiveness RETS/ODCM Radiological Effluent
Waterford 3 Unplanned Scrams per 7000 Critical Hrs Unplanned Power Changes per 7000 Critical Hrs Unplanned Scrams with Complications Safety System Functional Failures (PWR) Mitigating Systems Performance Index, Emergency AC Power System Mitigating Systems Performance Index, High Pressure Injection System Mitigating Systems Performance Index, Heat Removal System Mitigating Systems Performance Index, Residual Heat Removal System Mitigating Systems Performance Index, Cooling Water Systems Reactor Coolant System Activity Reactor Coolant System Leakage Drill/Exercise Performance ERO Drill Participation Alert & Notification System Occupational Exposure Control Effectiveness RETS/ODCM Radiological Effluent
Watts Bar 1 Unplanned Scrams per 7000 Critical Hrs Unplanned Power Changes per 7000 Critical Hrs Unplanned Scrams with Complications Safety System Functional Failures (PWR) Mitigating Systems Performance Index, Emergency AC Power System Mitigating Systems Performance Index, High Pressure Injection System Mitigating Systems Performance Index, Heat Removal System Mitigating Systems Performance Index, Residual Heat Removal System Mitigating Systems Performance Index, Cooling Water Systems Reactor Coolant System Activity Reactor Coolant System Leakage Drill/Exercise Performance ERO Drill Participation Alert & Notification System Occupational Exposure Control Effectiveness RETS/ODCM Radiological Effluent
Wolf Creek 1 Unplanned Scrams per 7000 Critical Hrs Unplanned Power Changes per 7000 Critical Hrs Unplanned Scrams with Complications Safety System Functional Failures (PWR) Mitigating Systems Performance Index, Emergency AC Power System Mitigating Systems Performance Index, High Pressure Injection System Mitigating Systems Performance Index, Heat Removal System Mitigating Systems Performance Index, Residual Heat Removal System Mitigating Systems Performance Index, Cooling Water Systems Reactor Coolant System Activity Reactor Coolant System Leakage Drill/Exercise Performance ERO Drill Participation Alert & Notification System Occupational Exposure Control Effectiveness RETS/ODCM Radiological Effluent

Legend
 