Unplanned Scrams per 7000 Critical Hrs 2Q/10 3Q/10 4Q/10 1Q/11 2Q/11 3Q/11 4Q/11 1Q/12
Unplanned scrams 1.0 0 0 0 0 1.0 0 0
Critical hours 2031.4 2208.0 2209.0 2159.0 2184.0 2133.6 2209.0 849.7
                 
Indicator value 1.8 1.8 1.8 0.8 0 0.8 0.8 0.9


Licensee Comments: none




Link to Notes

Unplanned Power Changes per 7000 Critical Hrs 2Q/10 3Q/10 4Q/10 1Q/11 2Q/11 3Q/11 4Q/11 1Q/12
Unplanned power changes 0 0 0 0 0 0 0 0
Critical hours 2031.4 2208.0 2209.0 2159.0 2184.0 2133.6 2209.0 849.7
                 
Indicator value 0.9 0 0 0 0 0 0 0

Licensee Comments: none






Link to Notes

Unplanned Scrams with Complications 2Q/10 3Q/10 4Q/10 1Q/11 2Q/11 3Q/11 4Q/11 1Q/12
Scrams with complications 0 0 0 0 0 0 0 0
                 
                 
Indicator value 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Licensee Comments: none






Link to Notes

Safety System Functional Failures (PWR) 2Q/10 3Q/10 4Q/10 1Q/11 2Q/11 3Q/11 4Q/11 1Q/12
Safety System Functional Failures 0 0 0 0 0 0 1 0
                 
Indicator value 0 0 0 0 0 0 1 1

Licensee Comments:

4Q/11: LER 2011-003-00






Link to Notes

Mitigating Systems Performance Index, Emergency AC Power System 2Q/10 3Q/10 4Q/10 1Q/11 2Q/11 3Q/11 4Q/11 1Q/12
UAI (ΔCDF) 1.49E-07 5.95E-08 7.66E-08 7.32E-08 -3.38E-08 -1.22E-08 -8.64E-09 9.44E-09
URI (ΔCDF) 4.37E-08 -1.17E-07 -1.17E-07 -1.17E-07 -1.69E-07 -3.76E-08 -3.63E-08 -3.67E-08
PLE NO NO NO NO NO NO NO NO
                 
Indicator value 1.90E-07 -5.70E-08 -4.10E-08 -4.40E-08 -2.00E-07 -5.00E-08 -4.50E-08 -2.70E-08

Licensee Comments:

3Q/11: Correction to PRA and planned baseline unavailability data due to errors made when entering updated PRA model data in March 2011 (Ref: CR-2011-008850)

2Q/11: Changed PRA Parameter(s). 10-11-11: Correction to PRA and planned baseline unavailability data due to errors made when entering updated PRA model data in March 2011 (Ref: CR-2011-008850)

1Q/11: Revisions effective Q2 2011: PRA parameters due to model update and UA Base Lines due to change in maintenance strategy from work in outage to on-line.






Link to Notes

Mitigating Systems Performance Index, High Pressure Injection System 2Q/10 3Q/10 4Q/10 1Q/11 2Q/11 3Q/11 4Q/11 1Q/12
UAI (ΔCDF) 2.52E-08 4.31E-08 7.86E-08 4.45E-08 -3.60E-08 -3.96E-08 -4.45E-09 4.91E-08
URI (ΔCDF) -6.52E-08 -6.55E-08 -6.27E-08 -5.31E-08 -3.43E-08 -3.35E-08 -3.42E-08 -3.86E-08
PLE NO NO NO NO NO NO NO NO
                 
Indicator value -4.00E-08 -2.20E-08 1.60E-08 -8.60E-09 -7.00E-08 -7.30E-08 -3.90E-08 1.00E-08

Licensee Comments:

3Q/11: Correction to PRA and planned baseline unavailability data due to errors made when entering updated PRA model data in March 2011 (Ref: CR-2011-008850)

2Q/11: Changed PRA Parameter(s). 10-11-11: Correction to PRA and planned baseline unavailability data due to errors made when entering updated PRA model data in March 2011 (Ref: CR-2011-008850)

1Q/11: Revisions effective Q2 2011: PRA parameters due to model update and UA Base Lines due to change in maintenance strategy from work in outage to on-line.






Link to Notes

Mitigating Systems Performance Index, Heat Removal System 2Q/10 3Q/10 4Q/10 1Q/11 2Q/11 3Q/11 4Q/11 1Q/12
UAI (ΔCDF) 7.40E-09 6.15E-09 1.39E-09 -1.91E-09 -7.61E-09 -7.61E-09 -7.61E-09 -7.59E-09
URI (ΔCDF) -6.34E-08 -6.25E-08 -6.08E-08 -5.02E-08 -2.13E-08 -2.19E-08 -2.22E-08 -2.46E-08
PLE NO NO NO NO NO NO NO NO
                 
Indicator value -5.60E-08 -5.60E-08 -5.90E-08 -5.20E-08 -2.90E-08 -2.90E-08 -3.00E-08 -3.20E-08

Licensee Comments:

1Q/11: 10-11-11:Allocation of Unit cross-connect valve to affected Unit (Ref: CR-2011-008850)

1Q/11: Revisions effective Q2 2011: PRA parameters due to model update and UA Base Lines due to change in maintenance strategy from work in outage to on-line.

4Q/10: 10-11-11: Allocation of Unit cross-connect valve to affected Unit (Ref: CR-2011-008850)

3Q/10: 10-11-11: Allocation of Unit cross-connect valve to affected Unit (Ref: CR-2011-008850)

2Q/10: 10-11-11: Allocation of Unit cross-connect valve to affected Unit (Ref: CR-2011-008850)






Link to Notes

Mitigating Systems Performance Index, Residual Heat Removal System 2Q/10 3Q/10 4Q/10 1Q/11 2Q/11 3Q/11 4Q/11 1Q/12
UAI (ΔCDF) 1.40E-07 1.45E-07 1.76E-07 1.73E-07 -4.29E-09 -3.89E-09 3.23E-08 5.50E-08
URI (ΔCDF) -5.87E-09 -5.50E-09 -5.59E-09 -4.58E-09 -4.26E-09 -4.17E-09 -4.15E-09 -5.25E-09
PLE NO NO NO NO NO NO NO NO
                 
Indicator value 1.30E-07 1.40E-07 1.70E-07 1.70E-07 -8.60E-09 -8.10E-09 2.80E-08 5.00E-08

Licensee Comments:

2Q/11: Changed PRA Parameter(s). 10-11-11: Correction to PRA and planned baseline unavailability data due to errors made when entering updated PRA model data in March 2011 (Ref: CR-2011-008850)

1Q/11: Revisions effective Q2 2011: PRA parameters due to model update and UA Base Lines due to change in maintenance strategy from work in outage to on-line.






Link to Notes

Mitigating Systems Performance Index, Cooling Water Systems 2Q/10 3Q/10 4Q/10 1Q/11 2Q/11 3Q/11 4Q/11 1Q/12
UAI (ΔCDF) 1.25E-07 1.24E-07 1.25E-07 4.13E-08 1.61E-07 1.34E-07 1.91E-07 1.98E-07
URI (ΔCDF) 8.79E-08 8.78E-08 8.77E-08 8.78E-08 2.75E-08 2.54E-08 -2.27E-07 -2.27E-07
PLE NO NO NO NO NO NO NO NO
                 
Indicator value 2.10E-07 2.10E-07 2.10E-07 1.30E-07 1.90E-07 1.60E-07 -3.60E-08 -3.00E-08

Licensee Comments:

4Q/11: Two CWS2 AOVs added due to current inability to validate their exclusion during the original MSPI scoping. CR-2011-008863

2Q/11: Changed PRA Parameter(s). 10-11-11: Correction to PRA and planned baseline unavailability data due to errors made when entering updated PRA model data in March 2011 (Ref: CR-2011-008850)

2Q/11: 10-11-11: Correction to PRA and planned baseline unavailability data due to errors made when entering updated PRA model data in March 2011 (Ref: CR-2011-008850)

1Q/11: Revisions effective Q2 2011: PRA parameters due to model update and UA Base Lines due to change in maintenance strategy from work in outage to on-line and for preventive maintenance optimization.

1Q/11: Revisions effective Q2 2011: PRA parameters due to model update and UA Base Lines due to change in maintenance strategy from work in outage to on-line and for preventive maintenance optimization.

3Q/10: 4-11-12: Two CWS2 AOVs added due to current inability to validate their exclusion during the original MSPI scoping.

2Q/10: 4-11-12: Two CWS2 AOVs added due to current inability to validate their exclusion during the original MSPI scoping.






Link to Notes

Reactor Coolant System Activity 4/10 5/10 6/10 7/10 8/10 9/10 10/10 11/10 12/10 1/11 2/11 3/11
Maximum activity 0.003390 0.004800 0.005030 0.005990 0.005840 0.005910 0.005480 0.006660 0.007140 0.006540 0.004740 0.004530
Technical specification limit 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 0.5 0.5 0.5
                         
Indicator value 0.3 0.5 0.5 0.6 0.6 0.6 0.5 0.7 0.7 1.3 0.9 0.9
Reactor Coolant System Activity 4/11 5/11 6/11 7/11 8/11 9/11 10/11 11/11 12/11 1/12 2/12 3/12
Maximum activity 0.004750 0.004730 0.004790 0.005080 0.005420 0.004790 0.005870 0.005920 0.006670 0.006150 0.005650 N/A
Technical specification limit 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5
                         
Indicator value 1.0 0.9 1.0 1.0 1.1 1.0 1.2 1.2 1.3 1.2 1.1 N/A

Licensee Comments:

3/12: Per NEI 99-02 "If in the entire month, plant conditions do not require RCS activity to be calculated, the data field is left blank for that month." Calvert Cliffs Unit 1 was in a refueling outage and shutdown for the entire month of March, 2012.






Link to Notes

Reactor Coolant System Leakage 4/10 5/10 6/10 7/10 8/10 9/10 10/10 11/10 12/10 1/11 2/11 3/11
Maximum leakage 0.168 0.224 0.194 0.140 0.230 0.100 0.120 0.070 0.080 0.080 0.080 0.090
Technical specification limit 10.0 10.0 10.0 10.0 10.0 10.0 10.0 10.0 10.0 10.0 10.0 10.0
                         
Indicator value 1.7 2.2 1.9 1.4 2.3 1.0 1.2 0.7 0.8 0.8 0.8 0.9
Reactor Coolant System Leakage 4/11 5/11 6/11 7/11 8/11 9/11 10/11 11/11 12/11 1/12 2/12 3/12
Maximum leakage 0.080 0.130 0.090 0.080 0.130 0.100 0.130 0.100 0.140 0.090 0.080 N/A
Technical specification limit 10.0 10.0 10.0 10.0 10.0 10.0 10.0 10.0 10.0 10.0 10.0 10.0
                         
Indicator value 0.8 1.3 0.9 0.8 1.3 1.0 1.3 1.0 1.4 0.9 0.8 N/A

Licensee Comments:

3/12: Per NEI 99-02 "If in the entire month, plant conditions do not require RCS activity to be calculated, the data field is left blank for that month." Calvert Cliffs Unit 1 was in a refueling outage and shutdown for the entire month of March, 2012.






Link to Notes

Drill/Exercise Performance 2Q/10 3Q/10 4Q/10 1Q/11 2Q/11 3Q/11 4Q/11 1Q/12
Successful opportunities 23.0 76.0 53.0 4.0 58.0 30.0 56.0 5.0
Total opportunities 23.0 78.0 54.0 4.0 59.0 30.0 57.0 5.0
                 
Indicator value 95.5% 95.4% 97.2% 97.1% 97.7% 98.5% 98.4% 98.4%

Licensee Comments: none






Link to Notes

ERO Drill Participation 2Q/10 3Q/10 4Q/10 1Q/11 2Q/11 3Q/11 4Q/11 1Q/12
Participating Key personnel 87.0 86.0 88.0 85.0 88.0 83.0 84.0 86.0
Total Key personnel 87.0 86.0 88.0 85.0 88.0 83.0 84.0 86.0
                 
Indicator value 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%

Licensee Comments: none






Link to Notes

Alert & Notification System 2Q/10 3Q/10 4Q/10 1Q/11 2Q/11 3Q/11 4Q/11 1Q/12
Successful siren-tests 948 948 940 949 945 889 946 947
Total sirens-tests 949 949 949 949 949 949 949 949
                 
Indicator value 99.7% 99.7% 99.7% 99.7% 99.6% 98.1% 98.2% 98.2%

Licensee Comments:

3Q/11: ANS test was misinterpreted and incorrectly reported in 3Q2011. The system engineer caught the error and Licensing corrected in CDE in 1Q2012. CR-2012-000541.






Link to Notes

Occupational Exposure Control Effectiveness 2Q/10 3Q/10 4Q/10 1Q/11 2Q/11 3Q/11 4Q/11 1Q/12
High radiation area occurrences 0 0 0 0 0 0 0 0
Very high radiation area occurrences 0 0 0 0 0 0 0 0
Unintended exposure occurrences 0 0 0 0 0 0 0 0
Indicator value 0 0 0 0 0 0 0 0

Licensee Comments: none






Link to Notes

RETS/ODCM Radiological Effluent 2Q/10 3Q/10 4Q/10 1Q/11 2Q/11 3Q/11 4Q/11 1Q/12
RETS/ODCM occurrences 0 0 0 0 0 0 0 0
                 
Indicator value 0 0 0 0 0 0 0 0