Figure G.8 Log Plot of Normalized Expected Cost
![Log plot of normalized expected cost per 1000 MW(t) per reactor year of 27 nuclear power plants [3300 MW(t) or greater] resulting from postulated accidents, regressed on the log of exposure index (EI).](fig045.gif)
Figure G.8 Log plot of normalized expected cost per 1000 MW(t) per reactor year of 27 nuclear power plants [3300 MW(t) or greater] resulting from postulated accidents, regressed on the log of exposure index (EI).
Page Last Reviewed/Updated Tuesday, September 20, 2016