United States Nuclear Regulatory Commission - Protecting People and the Environment

Arkansas Nuclear 2 – Quarterly Performance Indicators

The solid trend line represents the current reporting period.

Licensee's General Comments: none

2Q/2017 Performance Indicators

The solid trend line represents the current reporting period.

Licensee's General Comments: none

On this page:

Link to Notes

Unplanned Scrams per 7000 Critical Hrs 3Q/15 4Q/15 1Q/16 2Q/16 3Q/16 4Q/16 1Q/17 2Q/17
Unplanned scrams 0 0 0 0 0 0 0 0
Critical hours 1952.9 1154.1 1982.6 2184.0 2145.5 1580.1 2087.9 0
                 
Indicator value 0 0 0 0 0 0 0 0

To top of page

Licensee Comments: none


Link to Notes

Unplanned Power Changes per 7000 Critical Hrs 3Q/15 4Q/15 1Q/16 2Q/16 3Q/16 4Q/16 1Q/17 2Q/17
Unplanned power changes 0 0 1.0 1.0 0 0 2.0 0
Critical hours 1952.9 1154.1 1982.6 2184.0 2145.5 1580.1 2087.9 0
                 
Indicator value 0 0 1.0 1.9 1.9 1.8 2.6 2.4

To top of page

Licensee Comments: none




Link to Notes

Unplanned Scrams with Complications 3Q/15 4Q/15 1Q/16 2Q/16 3Q/16 4Q/16 1Q/17 2Q/17
Scrams with complications 0 0 0 0 0 0 0 0
                 
                 
Indicator value 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

To top of page

Licensee Comments: none




Link to Notes

Safety System Functional Failures (PWR) 3Q/15 4Q/15 1Q/16 2Q/16 3Q/16 4Q/16 1Q/17 2Q/17
Safety System Functional Failures 0 0 0 1 0 1 0 1
                 
Indicator value 0 0 0 1 1 2 2 2

To top of page

Licensee Comments:
2Q/17: May: Licensing Event Report 50-368 2017-001-00 Multiple failures related to Tornado Missile Protection reported as one in accordance with FAQ 16-03 guidance.
4Q/16: November: Licensing Event Report 50-368 2016-001-00
2Q/16: LER 50-313/2016-001-00




Link to Notes

Mitigating Systems Performance Index, Emergency AC Power System 3Q/15 4Q/15 1Q/16 2Q/16 3Q/16 4Q/16 1Q/17 2Q/17
UAI (ΔCDF) 5.04E-09 -5.77E-09 -5.77E-09 8.38E-09 1.28E-07 1.28E-07 1.26E-07 1.34E-07
URI (ΔCDF) -5.41E-08 -5.45E-08 -5.27E-08 -7.13E-08 1.55E-07 1.56E-07 1.76E-07 1.79E-07
PLE NO NO NO NO NO NO NO NO
                 
Indicator value -4.90E-08 -6.00E-08 -5.90E-08 -6.30E-08 2.80E-07 2.80E-07 3.00E-07 3.10E-07

To top of page

Licensee Comments:
2Q/16: The 2nd Quarter 2016 Emergency AC Power MSPI is being revised to include June Unplanned Unavailable Hours for the "A" Emergency Diesel Generator. This change does not affect the color of the Emergency AC Power MSPI indicator.




Link to Notes

Mitigating Systems Performance Index, High Pressure Injection System 3Q/15 4Q/15 1Q/16 2Q/16 3Q/16 4Q/16 1Q/17 2Q/17
UAI (ΔCDF) -6.91E-10 -4.30E-10 -4.59E-09 -3.30E-11 -3.30E-11 -3.30E-11 -3.30E-11 -3.30E-11
URI (ΔCDF) -5.22E-09 -5.41E-09 -5.46E-09 -3.73E-08 -3.82E-08 -3.98E-08 -4.03E-08 -4.12E-08
PLE NO NO NO NO NO NO NO NO
                 
Indicator value -5.90E-09 -5.80E-09 -1.00E-08 -3.70E-08 -3.80E-08 -4.00E-08 -4.00E-08 -4.10E-08

To top of page

Licensee Comments: none




Link to Notes

Mitigating Systems Performance Index, Heat Removal System 3Q/15 4Q/15 1Q/16 2Q/16 3Q/16 4Q/16 1Q/17 2Q/17
UAI (ΔCDF) -3.69E-10 -2.40E-10 4.10E-10 -1.93E-09 -1.92E-09 -1.90E-09 -1.93E-09 -5.50E-09
URI (ΔCDF) -5.22E-09 -5.53E-09 -5.21E-09 -4.86E-09 -4.69E-09 -4.25E-09 -5.32E-09 -3.42E-09
PLE NO NO NO NO NO NO NO NO
                 
Indicator value -5.60E-09 -5.80E-09 -4.80E-09 -6.80E-09 -6.60E-09 -6.10E-09 -7.30E-09 -8.90E-09

To top of page

Licensee Comments:
1Q/17: ANO-2 heat removal system reliability for the B Emergency Feed Water pump in January 2015, was revised. Operation non-test demands and run hours were removed. This change does not affect the color of this indicator.
4Q/16: ANO-2 heat removal system reliability for the B Emergency Feed Water pump in January 2015, was revised. Operation non-test demands and run hours were removed. This change does not affect the color of this indicator.
3Q/16: ANO-2 heat removal system reliability for the B Emergency Feed Water pump in January 2015, was revised. Operation non-test demands and run hours were removed. This change does not affect the color of this indicator.
2Q/16: ANO-2 heat removal system reliability for the B Emergency Feed Water pump in January 2015, was revised. Operation non-test demands and run hours were removed. This change does not affect the color of this indicator.
1Q/16: ANO-2 heat removal system reliability for the B Emergency Feed Water pump in January 2015, was revised. Operation non-test demands and run hours were removed. This change does not affect the color of this indicator.
4Q/15: ANO-2 heat removal system reliability for the B Emergency Feed Water pump in January 2015, was revised. Operation non-test demands and run hours were removed. This change does not affect the color of this indicator.
3Q/15: ANO-2 heat removal system reliability for the B Emergency Feed Water pump in January 2015, was revised. Operation non-test demands and run hours were removed. This change does not affect the color of this indicator.




Link to Notes

Mitigating Systems Performance Index, Residual Heat Removal System 3Q/15 4Q/15 1Q/16 2Q/16 3Q/16 4Q/16 1Q/17 2Q/17
UAI (ΔCDF) -4.48E-12 -4.41E-12 -4.34E-12 -1.94E-10 -1.94E-10 -1.93E-10 -1.94E-10 -1.89E-10
URI (ΔCDF) -1.86E-12 1.76E-11 1.77E-11 3.41E-11 3.41E-11 3.47E-11 3.47E-11 7.17E-11
PLE NO NO NO NO NO NO NO NO
                 
Indicator value -6.30E-12 1.30E-11 1.30E-11 -1.60E-10 -1.60E-10 -1.60E-10 -1.60E-10 -1.20E-10

To top of page

Licensee Comments:
1Q/17: ANO-2 residual heat removal system reliability for the A Containment Spray pump in December 2015, and for the B Containment Spray pump in March 2017, was revised. Operation non-test demands and run hours were revised to remove demands related to post-maintenance testing. This change does not affect the color of this indicator.
4Q/16: ANO-2 residual heat removal system reliability for the A Containment Spray pump in December 2015, was revised. Operation non-test demands and run hours were revised to remove a demand related to post-maintenance testing. This change does not affect the color of this indicator.
3Q/16: ANO-2 residual heat removal system reliability for the A Containment Spray pump in December 2015, was revised. Operation non-test demands and run hours were revised to remove a demand related to post-maintenance testing. This change does not affect the color of this indicator.
2Q/16: ANO-2 residual heat removal system reliability for the A Containment Spray pump in December 2015, was revised. Operation non-test demands and run hours were revised to remove a demand related to post-maintenance testing. This change does not affect the color of this indicator.
1Q/16: ANO-2 residual heat removal system reliability for the A Containment Spray pump in December 2015, was revised. Operation non-test demands and run hours were revised to remove a demand related to post-maintenance testing. This change does not affect the color of this indicator.
4Q/15: ANO-2 residual heat removal system reliability for the A Containment Spray pump in December 2015, was revised. Operation non-test demands and run hours were revised to remove a demand related to post-maintenance testing. This change does not affect the color of this indicator.




Link to Notes

Mitigating Systems Performance Index, Cooling Water Systems 3Q/15 4Q/15 1Q/16 2Q/16 3Q/16 4Q/16 1Q/17 2Q/17
UAI (ΔCDF) 0.00E+00 0.00E+00 0.00E+00 0.00E+00 0.00E+00 0.00E+00 0.00E+00 0.00E+00
URI (ΔCDF) -4.43E-08 -4.65E-08 -4.86E-08 -6.96E-08 -7.29E-08 -7.29E-08 -7.54E-08 -7.38E-08
PLE NO NO NO NO NO NO NO NO
                 
Indicator value -4.40E-08 -4.60E-08 -4.90E-08 -7.00E-08 -7.30E-08 -7.30E-08 -7.50E-08 -7.40E-08

To top of page

Licensee Comments:
1Q/17: ANO-2 cooling water system reliability for the A Service Water pump in March 2016, and September 2016, was revised. ANO-2 cooling water system reliability for the B Service Water pump in July 2014, and July 2016, was revised. ANO-2 cooling water system reliability for the C Service Water pump in March 2016, and July 2016, was revised. Test demands and run hours were revised to remove demands related to post-maintenance testing. This change does not affect the color of this indicator.
4Q/16: ANO-2 cooling water system reliability for the A Service Water pump in March 2016, and September 2016, was revised. ANO-2 cooling water system reliability for the B Service Water pump in July 2014, and July 2016, was revised. ANO-2 cooling water system reliability for the C Service Water pump in March 2016, and July 2016, was revised. Test demands and run hours were revised to remove demands related to post-maintenance testing. This change does not affect the color of this indicator.
3Q/16: ANO-2 cooling water system reliability for the A Service Water pump in March 2016, and September 2016, was revised. ANO-2 cooling water system reliability for the B Service Water pump in July 2014, and July 2016, was revised. ANO-2 cooling water system reliability for the C Service Water pump in March 2016, and July 2016, was revised. Test demands and run hours were revised to remove demands related to post-maintenance testing. This change does not affect the color of this indicator.
2Q/16: ANO-2 cooling water system reliability for the B Service Water pump in July 2014, and for the A Service Water pump in March 2016, was revised. Test demands and run hours were revised to remove demands related to post-maintenance testing. This change dose not affect the color of this indicator.
1Q/16: ANO-2 cooling water system reliability for the B Service Water pump in July 2014, and for the A Service Water pump in March 2016, was revised. Test demands and run hours were revised to remove demands related to post-maintenance testing. This change does not affect the color of this indicator.
4Q/15: ANO-2 cooling water system reliability for the B Service Water pump in July 2014, was revised. Test demands and run hours were revised to remove a demand related to post-maintenance testing. This change does not affect the color of this indicator.
3Q/15: ANO-2 cooling water system reliability for the B Service Water pump in July 2014, was revised. Test demands and run hours were revised to remove a demand related to post-maintenance testing. This change does not affect the color of this indicator.




Link to Notes

Reactor Coolant System Activity 7/15 8/15 9/15 10/15 11/15 12/15 1/16 2/16 3/16 4/16 5/16 6/16
Maximum activity 0.000799 0.000841 0.000797 N/A 0.000438 0.000464 0.000476 0.000474 0.000491 0.000583 0.000567 0.000568
Technical specification limit 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0
                         
Indicator value 0.1 0.1 0.1 N/A 0 0 0 0 0 0.1 0.1 0.1
Reactor Coolant System Activity 7/16 8/16 9/16 10/16 11/16 12/16 1/17 2/17 3/17 4/17 5/17 6/17
Maximum activity 0.000563 0.000593 0.000616 0.000458 0.000672 0.000702 0.000689 0.000700 0.000528 N/A N/A N/A
Technical specification limit 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0
                         
Indicator value 0.1 0.1 0.1 0 0.1 0.1 0.1 0.1 0.1 N/A N/A N/A

To top of page

Licensee Comments: none




Link to Notes

Reactor Coolant System Leakage 7/15 8/15 9/15 10/15 11/15 12/15 1/16 2/16 3/16 4/16 5/16 6/16
Maximum leakage 0.246 0.250 0.264 N/A 0.243 0.066 0.080 0.060 0.070 0.095 0.065 0.061
Technical specification limit 10.0 10.0 10.0 10.0 10.0 10.0 10.0 10.0 10.0 10.0 10.0 10.0
                         
Indicator value 2.5 2.5 2.6 N/A 2.4 0.7 0.8 0.6 0.7 1.0 0.7 0.6
Reactor Coolant System Leakage 7/16 8/16 9/16 10/16 11/16 12/16 1/17 2/17 3/17 4/17 5/17 6/17
Maximum leakage 0.071 0.071 0.065 0.058 0.074 0.084 0.090 0.101 0.158 N/A N/A N/A
Technical specification limit 10.0 10.0 10.0 10.0 10.0 10.0 10.0 10.0 10.0 10.0 10.0 10.0
                         
Indicator value 0.7 0.7 0.7 0.6 0.7 0.8 0.9 1.0 1.6 N/A N/A N/A

To top of page

Licensee Comments: none




Link to Notes

Drill/Exercise Performance 3Q/15 4Q/15 1Q/16 2Q/16 3Q/16 4Q/16 1Q/17 2Q/17
Successful opportunities 65.0 19.0 31.0 98.0 63.0 5.0 60.0 39.0
Total opportunities 67.0 19.0 32.0 99.0 65.0 5.0 62.0 39.0
                 
Indicator value 97.2% 97.2% 97.6% 97.6% 97.6% 97.3% 97.1% 97.9%

To top of page

Licensee Comments:
2Q/16: The 2nd Quarter 2016 June Drill/Exercise Performance is being revised to include five additional opportunities. This change does not affect the color of the Drill/Exercise Performance indicator.




Link to Notes

ERO Drill Participation 3Q/15 4Q/15 1Q/16 2Q/16 3Q/16 4Q/16 1Q/17 2Q/17
Participating Key personnel 106.0 103.0 103.0 108.0 107.0 111.0 107.0 109.0
Total Key personnel 106.0 103.0 103.0 108.0 107.0 111.0 107.0 109.0
                 
Indicator value 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%

To top of page

Licensee Comments: none




Link to Notes

Alert & Notification System 3Q/15 4Q/15 1Q/16 2Q/16 3Q/16 4Q/16 1Q/17 2Q/17
Successful siren-tests 147 146 147 147 147 147 147 147
Total sirens-tests 147 147 147 147 147 147 147 147
                 
Indicator value 99.8% 99.8% 99.8% 99.8% 99.8% 100.0% 100.0% 100.0%

To top of page

Licensee Comments: none




Link to Notes

Occupational Exposure Control Effectiveness 3Q/15 4Q/15 1Q/16 2Q/16 3Q/16 4Q/16 1Q/17 2Q/17
High radiation area occurrences 0 0 0 0 0 0 0 0
Very high radiation area occurrences 0 0 0 0 0 0 0 0
Unintended exposure occurrences 0 0 0 0 0 0 0 0
Indicator value 0 0 0 0 0 0 0 0

To top of page

Licensee Comments: none




Link to Notes

RETS/ODCM Radiological Effluent 3Q/15 4Q/15 1Q/16 2Q/16 3Q/16 4Q/16 1Q/17 2Q/17
RETS/ODCM occurrences 0 0 0 0 0 0 0 0
                 
Indicator value 0 0 0 0 0 0 0 0

To top of page

Licensee Comments: none






Although the Security Cornerstone is included in the Reactor Oversight Process assessment program, the Commission has decided that specific information related to findings and performance indicators pertaining to the Security Cornerstone will not be publicly available to ensure that security information is not provided to a possible adversary. Other than the fact that a finding or performance indicator is Green or Greater-Than-Green, security related information will not be displayed on the public web page.





 
 
 
 

Current data as of: July 26, 2017

Page Last Reviewed/Updated Wednesday, June 07, 2017