United States Nuclear Regulatory Commission - Protecting People and the Environment

Public Meetings for 2014

This page lists, in reverse chronological order, the notices, slides and summaries documenting the public meetings held concerning the pressurized-water reactors (PWRs) sump performance issue (GSI-191). To learn about future meetings, see our public meeting schedule page.

This page includes links to files in non-HTML format. See Plugins, Viewers, and Other Tools for more information.

Date Description
12/01/14

Public Meeting With STP Nuclear Operating Company To Discuss Risk-Informed Approach To Resolution Ff Generic Safety Issue (GSI)-191 for South Texas Project, Units 1 And 2

11/06/14

Public Meeting Via Conference Call With STP Nuclear Operating Company To Discuss Risk-Informed Approach To Resolution Of Generic Safety Issue (GSI)-191 For South Texas Project, Units 1 And 2

11/06/14

Meeting On Vogtle Electric Generating Plant, Units 1 And 2
(Generic Safety Issue (GSI)-191)

10/30/14

Meeting With Exelon Generation Company, LLC Regarding Generic Letter 2004-02, Associated With Three Mile Island, Unit 1

10/02/14

ACRS Meeting With The U.S. Nuclear Regulatory Commission

08/20/14

Public Meeting With STP Nuclear Operating Company To Discuss Revised Pilot Submittal And Request For Exemptions For A Risk-Informed Approach To Resolve Generic Safety Issue (GSI)-191 At South Texas Project, Units 1 And 2

07/29/14

U.S. EPR Design Certification - Design Centered Working Group Meeting

07/22/14

Meeting With The Nuclear Energy Institute (NEI) On Generic Safety Issue (GSI) 191, “Assessment Of Debris Accumulation On PWR Sumps”

06/24-26/14

Public Meeting On The Performance-Based Emergency Core Cooling Systems Cladding Acceptance Criteria (Title 10 Of The Code Of Federal Regulations Section 50.46c) Proposed Rule And Associated Draft Regulatory Guidance

06/12/14

Meeting With BWROG Executive Committee

06/10/14

Advisory Committee On Reactors Safeguards Power Uprate Subcommittee: Open Session

05/22/14

Pre-Submittal Meeting With Westinghouse Electric Company Regarding AP1000 Containment Cable Debris Evaluation Topical Report

05/22/14

Public Meeting Via Teleconference With STP Nuclear Operating Company To Discuss South Texas Project, Units 1 And 2

05/21/14

Meeting With Calvert Cliffs Nuclear Power Plant, Unit Nos. 1 And 2 Regarding GL 2004-02 Ongoing Resolution

04/29-30/14

Category 3 Public Meeting On The 10 CFR 50.46c Proposed Rule

04/16/14

Pre-Submittal Meeting With The Pressurized Water Reactor Owners Group (PWROG) For A Comprehensive Discussion Of Topical Report WCAP-17788-NP

04/01/14

Pre-Submittal Meeting With The Pressurized Water Reactor Owners Group (PWROG) To Discuss The Thermal Hydraulics Analysis Component Of Topical Report WCAP-17788-NP

03/18/14

Meeting Re Chapter 8 - Electric Power

03/10/14

Meeting With Pressurized Water Reactor Owners Group Annual Executive Committee

02/25/14

Public Meeting With Areva Np To Discuss U.S. EPR Design Certification Closure Plan Schedules For Chapters In Groups B And C

To top of page

Page Last Reviewed/Updated Monday, December 19, 2016