United States Nuclear Regulatory Commission - Protecting People and the Environment
Home > Nuclear Reactors > Operating Reactors > Licensing > Technical Specifications > TSTF Travelers with Current or Pending NRC Action

TSTF Travelers with Current or Pending NRC Action

This table shows TSTF Travelers with pending NRC action, as well as anticipated dates for publishing associated model safety evaluations.

Updated as of April 10, 2006

TSTF Travelers with Current or Pending NRC Action
TSTF # Rev Application Date Closeout Date, ML#, or FRN Title Task ID (TAC No.)** Review Branches and ITSB Contact Remarks FRN for Comment or Draft SE Target Date
374 0 04/20/01 ML011340449   Revision to TS 5.5.13 and associated TS Bases for Diesel Fuel Oil MC5092 ITSB Hearn Publish Federal Register (FR) Notice for comment Publish FR Notice for adoption FRN for Comment ML060340359 02/22/2006 71 FRN 9179 Final FR 06/01/2006
409 2 11/10/03 ML033280006   Containment Spray System Completion Time Extension (CE NPSD-1045-A) (Already included in STS Rev 3) MC5093 ITSB Thomas Model SE, LAR, NSHC written by ITSB. Final package routing in progress.

FRN for Comment published
ML060250606
04/10/06
FRN for Availablity
06/28/2006

1 10/28/2002 ML023100066 11/10/03 ML033280006(# for Rev 2, which referred to 11/15/2001 ML013190173) MB6657
0 05/29/2001 ML011630375 (cover letter missing) 12/15/2001 ML013400174 (Referring to 11/15/2001 ML013190173) MB2154
412 2 01/31/2006 ML060370064   Actions for One Steam Supply to Turbine Driven AFW/EFW Pump Inoperable   ITSB SPLB-A Pannier
Harbuck

TSTF-412, Revision 2, (TSTF-06-01) received 02/06/2006. Review new Rev. Harbuck to set up conference call 03/2006

Draft SE 04/15/2006 Final 07/31/2006
1 01/31/05 ML050460306 01/31/2006 ML060370064 (Rev. 2's ML) MC6304
0 07/05/2001 ML011980165 ML021960158 07/12/2002 MB2395
425 0 08/31/04 ML052990318   RITSTF Initiative 5 Relocate Surveillance Frequencies to Licensee Control. MC3567 LIMERICK MC3568 LIMERICK MB2531 TSTF 425 APOB, LPLx, SPWx, SPBP, EEEB, EICB, IRIB, ITSB Tjader

NRC provided RAIs on the methodology document and the Limerick lead plant submittal. Limerick and RITSTF to respond by 01/31/2006 RAIs to be discussed 02/22 During meeting Feb. 23, 2006, NRC indicated that a 2nd pilot was needed

Draft in FR by 06/30/06. Final by 08/31/2006
426 0 08/30/04 ML042520158   "Revise or Add Actions to Preclude Entry into LCO 3.0.3 - RITSTF Initiatives 6b & 6c" MC4438 APOB, SBPB, ITSB Tjader TSTF responded to RAI. NRC to issue Notice for Comment Draft by 04/14/06. Final by 06/30/2006
427 1 02/03/2006 ML060370034   RITSTF Initiative 7, Allowance for non Technical Specification Barrier Degradation on Supported System Operability -   APOB, ITSB Tjader Rev. 1 with NRC comments addressed submitted 02/03/2006. Review new Rev. Draft by 05/06/06. Final by 10/30/2006.
0 04/03/2003 ML030660070 02/03/2006 ML060370034 (ML of new rev) MB2388
448 2 08/18/05 ML052930105   Control Room Habitability MC8335 ITSB LPD4-A: SPSB-C: Harbuck ITSB sent with letter 03/10/06 (ML060730317) STS markups and draft SE of changes A meeting with TSTF is scheduled for 4/20/06 For comment by 09/30/06 Final by 01/30/07
1 08/19/2003 ML032390523 06/23/2005 ML051800640 MC0519
0 12/18/2002 ML030080399 07/01/7003 ML031820580 MB7186
459 1 02/13/2006 ML060440645   Provide an Exception to the Requirement to Have One RHR Shutdown Cooling System in Operation MD0039 ITSB Roth Review of Rev. 1 to start March 2006 Acceptance Review (45 day max) in progress TB reject mtg to discuss For comment by 02/13/2007 Final by 06/13/2007
0 12/17/03 ML033350006 02/13/2006 ML060440645 TAC MC1449 closed 12/12/05. Rev. 1 is a complete replacement of Rev. 0. MC1449
465 0 09/17/03 ML033350006   Addition of time performance Surveillance Requirement (SR) note to Source Range Monitor (SRM) SRs MC1451 ITSB Schulten NRC provided questions by e-mail October 14, 2005. TSTF responded 01/09/2006. Review continuing Dates being re-evaluated
476 0 08/30/04 ML042540121   Improved BPWS Control Rod Insertion Process (NEDO-33091) MC4442 SBWB, ITSB Thomas Incorporate comments on internally-prepared SE. For comment by 04/15/06 Final 07/31/06
478 0 04/25/05 ML051170308   TSTF-478, Revision 0, "BWR Technical Specification Changes that Implement the Revised Rule for Combustible Gas Control MC8336 ITSB Harbuck Not fee exempt. Review with fees to BWROG.Routed to WPC For comment 04/25/2006 Final 08/25/2006 Pending resource availablity
486 0 06/03/05 ML051580191   Revise MTC Surveillance for Startup Test Activity Reduction (STAR) Program (WCAP-16011) MC8896 SPWB, ITSB Tjader Documenting NRR work request for technical review assignments Draft FR 04/28/06 Final FR 08/28/06
487 0 06/20/05 ML051860302   Relocate DNB Parameters to the COLR MC8594 ITSB Roth Review started January 2006 For comment 06/20/06 Final 10/20/06
490 0 09/13/2005 ML052630462   "Deletion of E Bar Definition and Revision to RCS Specific Activity Tech Spec" MC8565 ITSB Pannier See also Wolf Creek MC8819; Diablo Canyon MC9671/MC9672 due 01/01/2007. Review to start by February 2006 For comment 09/13/2006 Final 01/13/2007
491 0 09/13/2005 ML052590343   "Removal of Main Steam and Main Feedwater Valve Isolation Times From Technical Specifications" MC8562 ITSB Hearn Reviewed as BSI for Beaver Valley ITS conversion in progress. For comment 6/30/2006
492 0 10/25/2005 ML052990215   "Modify RHR - High Water Level Bases to Address Decay Heat Removal with Upper Internals Installed" (Bases 3.9.5) MC8758 ITSB Pannier Review Fee Determination (30 day max) and Acceptance Review (45 day max) in progress For comment 02/28/2007
493 0 1/27/06 ML060270503   "Clarify Application of Setpoint Methodology for LSSS Functions" (TSTF-06-03) MD0308   Fee exemption granted in ML060620213 For comment 01/27/2007

** The TAC numbers are provided to ease tracking of the work internally to the NRC. The provided closure information in the "Closeout Date, ML#, or FRN" column provides the NRC's rationale and dates for disposing of the TSTF Traveler. By contrast, the TAC column does not have dates because the TAC#s were not always opened and closed on the same date as the final or last agency action on a TSTF Traveler, especially if the NRC has waited for a response from industry for a long time. In some cases, there is no TAC# because the NRC's work was done under generic programs and not assigned a specific TAC#. NRC Status of TSTF Travelers under review with NEI, Owners Group, or other non-NRC action next. This table shows TSTF Travelers with pending or anticipated actions from NEI, the owners groups, or other non-NRC stakeholders. Information from the Technical Specification Task Force and associated dates have been provided in the remarks section.

Page Last Reviewed/Updated Thursday, March 29, 2012