2013 Meetings for the BWXT mPower™ Design
The following table lists, in chronological order, the meetings that staff of the U.S. Nuclear Regulatory Commission (NRC) conducted with representatives of Generation mPower LLC, in connection with the pre-application activities associated with the BWXT mPower™ reactor design. To learn about future public meetings, see our Public Meeting Schedule.
This page includes links to files in non-HTML format. See Plugins, Viewers, and Other Tools for more information.
Date |
Description |
12/11/13 |
mPower Public Meeting on Topics in the BWXT mPower Design Specific Review Standard (DSRS)
|
12/10/13 |
*** CANCELLED DUE TO WEATHER ***
mPower Non-Public Meeting on Departure from Nucleate Boiling (DNB) Topical Report Overview
|
11/19/13 |
mPower Non-Public Meeting on Integral Isolation Valve (IIV) Follow Up
|
11/14/13 |
mPower Public Meeting on BWXT mPower Design Specific Review Standard (DSRS) Instrumentation and Controls (I&C) Topics
|
11/13/13 |
mPower Non-Public Meeting on SmartPlant 3D Model and mPower's Design Process and Preliminary Status of Piping Design Completion
|
10/29/13 |
mPower Non-Public Meeting on Design-Basis Accident Radiological Source Term Methodology
|
10/29/13 |
mPower Public Meeting on ATWS Overview and Regulatory Conformance Evaluation
|
09/16 - 17/13 |
mPower Non-Public Meeting on the Integrated Systems Testing (IST) Facility Quality Assurance Program, Integral Isolation Valve (IIV) Design, Reactor Pressure Vessel (RPV) Internals, and Control Rod Drive Design
|
08/27 - 28/13 |
mPower Non-Public Meeting on VIPRE Topical Report, Fuel System Mechanical Design Report, GSI 191, Digital I&C Program Overview, and HFE Submittal Plan Update
|
07/30/13 |
mPower Non-Public Meeting on mPower Integrated Systems Test Facility Status Update
|
07/23/13 |
Public Meeting with the NRC Staff, the Tennessee Valley Authority (TVA), and Generation mPower to Discuss Key Licensing Assumptions Associated with the Clinch River Part 50 Construction Permit Application
|
06/25/13 |
mPower Non-Public Meeting on Plant Layout and Construction, Validation of System for Analysis of Soil-Structure Interaction (SASSI) Code, Random Vibration Theory (RVT) Topical Report, and Hydrology
|
05/28/13 |
mPower Non-Public Meeting on Security Staffing Methodology Topical Report
|
05/21-22/13 |
mPower Non-Public Meeting on mPower Reactor Core, Fuel Mechanical Design Update, Containment and Nuclear Steam Supply System (NSSS) Update
|
04/30/13 |
mPower Non-Public Meeting on Human Factors Engineering and Piping Design Acceptance Criteria (DAC) Plans and Regulatory Treatment of Non-Safety Systems (RTNSS) B Long Term Cooling
|
02/28/13 |
mPower Non-Public Meeting on ASME Code and Reactor Internals Update
|
01/29/13 |
mPower Non-Public Meeting on Aircraft Impact Assessment Overview, PRA Assessment, Emergency Core Cooling Systems, and LOCA and Non-LOCA Analysis
|
Page Last Reviewed/Updated Friday, September 16, 2022