United States Nuclear Regulatory Commission - Protecting People and the Environment
Home > Nuclear Reactors > New Reactors > Advanced Reactors > Stakeholder Position Papers

Stakeholder Position Papers

Stakeholder Position Papers

As a part of the NRC's open process to resolve key safety and licensing issues, stakeholders are encouraged to communicate opinions to the staff on technical or policy issues. The following list identifies written stakeholder position papers received by the NRC.

Date Topic Author Affiliation
02/19/19 Advanced Nuclear Environmental Permitting Reform Clearpath
09/28/18 NEI-18-04 Risk-Informed Performance-Based Guidance for Non-Light Water Reactor Licensing Basis Development NEI
June 2018 Nuclear Metal Fuel: Characteristics, Design, Manufacturing, Testing, and Operating History Fast Reactor Working Group
05/11/18 Proposed Guidance for Preparing and Reviewing Molten Salt Nonpower Reactor License Applications Oak Ridge National Laboratory
01/24/18 Addressing the Challenges with Establishing the Infrastructure for the front-end of the Fuel Cycle for Advanced Reactors NEI
12/12/17 Modernization of Technical Requirements for Licensing of Advanced Non-Light Water Reactors: Risk-Informed and Performance-Based Evaluation of Defense-in-Depth Adequacy Southern/DOE
10/11/17 Modernization of Technical Requirements for Licensing of Advanced Non-Light Water Reactors: Safety Classification and Performance Criteria for Structures, Systems, and Components Southern/DOE
06/02/17 Modernization of Technical Requirements for Licensing of Advanced Non-Light Water Reactors - Probabilistic Risk Assessment Approach Southern/DOE
04/24/17 Clarifying "Major Portions" of a Reactor Design in Support of a Standard Design Approval NEI/NIA
04/13/17 Modernization of Technical Requirements for Licensing of Advanced Non-Light Water Reactors - Selection of Licensing Basis Events, Draft Report Revision 0 Southern/DOE
12/14/16 Proposed Physical Security Requirements for Advanced Reactor Technologi0es Also see additional information provided by NEI on 09/08/17 NEI
04/11/16 White Paper on Strategies for Advanced Reactor Licensing NIA
03/23/16 Proposed Approach to Offsite Power Requirements for Small Modular Reactors and Other New Technologies NEI
06/11/14 NRC Questions on NEI White Paper Describing Proposed Methodology and Criteria Regarding Small Modular Reactor Emergency Planning Zone NRC
03/14/14 White Paper on Proposed Improvements to Tier 1 and the Inspections, Tests, Analyses and Acceptance Criteria (ITAAC) for Small Modular Reactors NEI
12/23/13 White Paper on Proposed Methodology and Criteria for Establishing the Technical Basis for Small Modular Reactor Emergency Planning Zone NEI
12/20/13 Request for NRC Acceptance of an Alternative Process for Small Modular Reactor Design Certification Application Submittals NEI
12/27/12 Small Modular Reactor Source Terms NEI
09/04/12 Development of an Emergency Planning and Preparedness Framework for Small Modular Reactors NEI
07/31/12 Physical Security for Small Modular Reactors NEI
09/23/11 Control Room Staffing For Small Reactors NEI
06/06/11 Insurance and Liability Requirements for Small Reactors NEI
01/14/11 Small Modular Reactor Pre–Application Engagement NEI
12/20/10 License Structure for Multi–Module Small Modular Reactor Facilities NEI
11/20/10 Decommissioning Funding for Small Reactors NEI
10/31/10 NRC Annual Fee Assessment for Small Reactors NEI
Page Last Reviewed/Updated Monday, March 04, 2019