Publication of Regulatory Guide 1.233
The NRC published Regulatory Guide 1.233, "Guidance for a Technology-Inclusive, Risk-Informed, and Performance-Based Methodology to Inform the Licensing Basis and Content of Applications for Licenses, Certifications, and Approvals for Non-Light Water Reactors," in the Federal Register on June 9, 2020. This regulatory guide endorsed the methodology described in NEI 18-04, Revision 1, "Risk-Informed Performance-Based Guidance for Non‑Light Water Reactor Licensing Basis Development," as an acceptable approach for informing the licensing basis and determining the appropriate scope and level of detail for parts of applications for licenses, certifications, and approvals for non-LWRs.

Background
The NRC engaged with the Licensing Modernization Project (LMP) led by Southern Company, coordinated by the Nuclear Energy Institute (NEI), and cost-shared by the U.S. Department of Energy (DOE). The interactions between the NRC staff and LMP resulted in the submittal of NEI 18-04, Revision 1, on August 26, 2019. The guidance focuses on identifying licensing basis events; classifying and establishing performance criteria for structures, systems, and components; and evaluating defense in depth for advanced reactor designs.
The staff issued SECY-19-0117, "Technology-Inclusive, Risk-Informed, and Performance-Based Methodology to Inform the Licensing Basis and Content of Applications for Licenses, Certifications, and Approvals for Non-Light-Water Reactors," on December 2, 2019. In this notation vote paper, the staff discussed potential policy issues associated with the LMP methodology and recommended that the Commission find that the use of the methodology described in NEI 18-04, Revision 1, is a reasonable approach for establishing key parts of the licensing basis for non-LWRs. The Commission's Staff Requirements Memorandum dated May 26, 2020, found that using the methodology is a reasonable approach to support the licensing of non-light water reactors.

Licensing Modernization Project Reports
The following reports are related to LMP including demonstration and pilot activities.
Date |
Design |
March 2020 |
Final Project Report |
March 2020 |
LMP Lessons Learned, Best Practices, and Frequently Asked Questions |
March 2020 |
Safety Classification and Performance Criteria for Structures, Systems, and Components |
March 2020 |
Selection and Evaluation of Licensing Basis Events |
March 2020 |
Risk-Informed and Performance-Based Evaluation of Defense-in-Depth Adequacy |
March 2020 |
Probabilistic Risk Assessment Approach |
September 2019 |
Fluoride-Cooled High Temperature Reactor Licensing Modernization Project Demonstration |
September 2019 |
Molten Salt Reactor Experiment (MSRE) Case Study Using Risk‐Informed, Performance‐Based Technical Guidance to Inform Future Licensing for Advanced Non‐Light Water Reactors |
August 2019 |
Westinghouse eVinci Micro Reactor
Licensing Modernization Project Demonstration |
December 2018 |
PRISM Sodium Fast Reactor
Licensing Modernization Project Demonstration |
September 2018 |
OKLO's DG-1353 Pilot |
August 2018 |
High Temperature, Gas-Cooled Pebble Bed Reactor
licensing Modernization Project Demonstration |

Page Last Reviewed/Updated Monday, March 20, 2023