Skip to main content

The purpose of this meeting is to discuss the structural building design for the Hermes 2 test reactor facility. The use of precast concrete for safety related structures and the design criteria for extreme winds are the main topics to be discussed.

Meeting Details

Partially Closed
Date
March 17, 2026
Time
3:00 pm–5:00 pm EDT
Location
Teleconference

Agenda
Meeting Info

Purpose

The purpose of this meeting is to discuss the structural building design for the Hermes 2 test reactor facility. The use of precast concrete for safety related structures and the design criteria for extreme winds are the main topics to be discussed.

Teleconference / Webinar

Bridge Number: 3015762978
Conference ID: 26866239#
Webinar Link Join the Webinar
Webinar Meeting Number: 250 113 653 298 95
Webinar Password: GN7Cz9cN

Documents

Document Title Description
ML26055A310 03/17/2026 Pre-submittal Meeting with Kairos Power LLC on the Structural Building Design for Hermes 2
ML26070A199 Kairos Power, LLC, Presentation Slides for the March 17, 2026 Pre-Submittal Meeting on Hermes 2 Structural Design Criteria
ML26070A199 Kairos Power, LLC, Presentation Slides for the March 17, 2026 Pre-Submittal Meeting on Hermes 2 Structural Design Criteria

Participants

Office of Nuclear Reactor Regulation

External Participants

Kairos Power
Keoni Sanny

Contact

Cayetano Santos

(301) 415-7270

Samuel Cuadrado

(301) 415-2946

Page Last Reviewed/Updated Tuesday, March 17, 2026